CONGERS - 9  ::  2822 Belgian Drive
[ BUILD: 20200001990 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
Wed    Mar 25      Inspection (Concrete Wall) (1)      
Thu    Mar 26      Inspection (Conduit Under Slab) (1)      
    Inspection (Drain Tile) (0)      
Fri    Mar 27      Inspection (Rough In Plumbing) (1)      
Mon    Mar 30      Inspection (Rough In Electric) (1)      
Tue    Mar 31      Inspection (Framing) (1) *       
    Inspection (Deck Piers) (0)      
    Inspection (Main Water Line) (0)      
    Inspection (Final HVAC) (0)      
    Inspection (Final Plumbing) (0)      
    Inspection (Final Electric) (0)      
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    French Model Fridge  
    Painted Kitchen Cabinetry  
    Semi Frameless Shower Door in Master Bathroom  
    CREDIT- for missing window in upstairs bedroom  
    $2550 increase in contract price per amendment  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Inspection (Slab) (1)      
-- -- Inspection (Rough In HVAC) (1)       Mon, 2/15
-- -- Inspection (Insulation) (1)       Mon, Feb 22
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Inspection (Final Building) (4) *        5/6