| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room and Bathroom ($9500 included in amendment) | ||||
| 8 lb carpet pad ($250 included in amendment) | ||||
| utile shower with pan ($2800 included in amendment) | ||||
| Semi Frameless shower door ($1400 included in amendment) | ||||
| Cabinet Crown Moulding ($included in amendment) | ||||
| closet in the bonus room ($400 included in amendment) | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) | ||
| -- | -- | Inspection (Concrete Wall) (1) 07.27.2025 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 07.27.2025 | ||
| -- | -- | Inspection (Slab) (1) | ||
| -- | -- | Inspection (Drain Tile) (0) 07.27.2025 | ||
| -- | -- | Inspection (Rough In HVAC) (1) | 3/30 | |
| -- | -- | Inspection (Rough In Plumbing) (1) 07.27.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 07.27.2025 | ||
| -- | -- | Inspection (Framing) (1) * 07.27.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 07.27.2025 | ||
| -- | -- | Inspection (Insulation) (1) | ||
| -- | -- | Inspection (Electric Service) (0) | ||
| -- | -- | Inspection (Main Sewer Line) (0) | ||
| -- | -- | Inspection (Main Water Line) (0) 07.27.2025 | ||
| -- | -- | Inspection (Final HVAC) (0) 07.27.2025 | ||
| -- | -- | Inspection (Final Plumbing) (0) 07.27.2025 | ||
| -- | -- | Inspection (Final Electric) (0) 07.27.2025 | ||
| -- | -- | Inspection (Final Building) (4) * | Mon, Jun 28 | |