ADDR
CONGERS - 19  ::  2880 Belgian Drive
[ BUILD: 20200002171 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
Wed    Jul 1      Inspection (Concrete Wall) (1)      
Thu    Jul 2      Inspection (Conduit Under Slab) (1)      
    Inspection (Drain Tile) (0)      
Fri    Jul 3      Inspection (Rough In Plumbing) (1)      
Mon    Jul 6      Inspection (Rough In Electric) (1)      
Tue    Jul 7      Inspection (Framing) (1) *       
    Inspection (Deck Piers) (0)      
    Inspection (Main Water Line) (0)      
    Inspection (Final HVAC) (0)      
    Inspection (Final Plumbing) (0)      
    Inspection (Final Electric) (0)      
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Bonus Room and Bath  
    Add closet to bonus room  
    Crown Moulding Main Level  
    LVP Bonus Room  
    LVP up hallway and bedrooms  
    Oak Stairs to bedroom level  
    Cabinet Crown Moulding  
    Painted Kitchen and Bath Cabinetry  
    Level III Quartz Kitchen Counters  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Inspection (Slab) (1)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Inspection (Final Building) (4) *        Mon, Aug 16