CONGERS - 22  ::  2898 Belgian Drive
[ BUILD: 20200002174 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Finished Bonus Room and Bathroom ($9500)  
    Bonus Room closet ($400)  
    Kitchen Painted Cabinets ($600)  
    Level III Quartz Kitchen Counters ($1575)  
    Five Piece Drawer- Kitchen Cabinetry ($400)  
    Cabinet Crown Moulding ($500)  
    Utile Shower Master ($2800)  
    Shower Door Master ($1400)  
    Level III Quartz Bathroom Countertops ($1300)  
    Farmhouse Plumbing Package- Black ($450)  
    Main Level Crown Moulding ($1250)  
    French Model Fridge ($850)  
    Eggshell paint ($850)  
    Digital Deadbolt ($150)  
    WiFi enabled Thermostat ($420)  
    Bonus Room LVP ($1300)  
    Farmhouse Sink ($600)  
    Costs above included in contract amendment  
    Bonus Room Window  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)      
-- -- Inspection (Concrete Wall) (1)  02.11.2023    
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Inspection (Conduit Under Slab) (1)  02.11.2023    
-- -- Inspection (Slab) (1)      
-- -- Inspection (Drain Tile) (0)  02.11.2023    
-- -- Inspection (Rough In HVAC) (1)      
-- -- Inspection (Rough In Plumbing) (1)  02.11.2023    
-- -- Inspection (Rough In Electric) (1)  02.11.2023    
-- -- Inspection (Framing) (1) *   02.11.2023    
-- -- Inspection (Deck Piers) (0)  02.11.2023    
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Inspection (Main Water Line) (0)  02.11.2023    
-- -- Inspection (Final HVAC) (0)  02.11.2023    
-- -- Inspection (Final Plumbing) (0)  02.11.2023    
-- -- Inspection (Final Electric) (0)  02.11.2023    
-- -- Inspection (Final Building) (4) *   09.08.2021     Re-inspect 9/8/2021;