| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room and Bathroom ($9500) | ||||
| Bonus Room closet ($400) | ||||
| Kitchen Painted Cabinets ($600) | ||||
| Level III Quartz Kitchen Counters ($1575) | ||||
| Five Piece Drawer- Kitchen Cabinetry ($400) | ||||
| Cabinet Crown Moulding ($500) | ||||
| Utile Shower Master ($2800) | ||||
| Shower Door Master ($1400) | ||||
| Level III Quartz Bathroom Countertops ($1300) | ||||
| Farmhouse Plumbing Package- Black ($450) | ||||
| Main Level Crown Moulding ($1250) | ||||
| French Model Fridge ($850) | ||||
| Eggshell paint ($850) | ||||
| Digital Deadbolt ($150) | ||||
| WiFi enabled Thermostat ($420) | ||||
| Bonus Room LVP ($1300) | ||||
| Farmhouse Sink ($600) | ||||
| Costs above included in contract amendment | ||||
| Bonus Room Window | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) | ||
| -- | -- | Inspection (Concrete Wall) (1) 02.11.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 02.11.2023 | ||
| -- | -- | Inspection (Slab) (1) | ||
| -- | -- | Inspection (Drain Tile) (0) 02.11.2023 | ||
| -- | -- | Inspection (Rough In HVAC) (1) | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 02.11.2023 | ||
| -- | -- | Inspection (Rough In Electric) (1) 02.11.2023 | ||
| -- | -- | Inspection (Framing) (1) * 02.11.2023 | ||
| -- | -- | Inspection (Deck Piers) (0) 02.11.2023 | ||
| -- | -- | Inspection (Insulation) (1) | ||
| -- | -- | Inspection (Electric Service) (0) | ||
| -- | -- | Inspection (Main Sewer Line) (0) | ||
| -- | -- | Inspection (Main Water Line) (0) 02.11.2023 | ||
| -- | -- | Inspection (Final HVAC) (0) 02.11.2023 | ||
| -- | -- | Inspection (Final Plumbing) (0) 02.11.2023 | ||
| -- | -- | Inspection (Final Electric) (0) 02.11.2023 | ||
| -- | -- | Inspection (Final Building) (4) * 09.08.2021 | Re-inspect 9/8/2021; | |