ADDR
CONGERS - 3  ::  2823 Belgian Drive
[ BUILD: 20210000318 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
UPGRADES
---
CRITICAL PATH
Wed    Mar 25      Inspection (Concrete Wall) (1)      
Thu    Mar 26      Inspection (Conduit Under Slab) (1)      
    Inspection (Drain Tile) (0)      
Fri    Mar 27      Inspection (Rough In Plumbing) (1)      
Mon    Mar 30      Inspection (Rough In Electric) (1)      
Tue    Mar 31      Inspection (Framing) (1) *       
    Inspection (Deck Piers) (0)      
    Inspection (Main Water Line) (0)      
    Inspection (Final HVAC) (0)      
    Inspection (Final Plumbing) (0)      
    Inspection (Final Electric) (0)      
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Buyer requesting to add oak treads.  
    Glass Shower Door  
    UTile Shower in Master  
    Amendment from $281,900 to $287,700  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Inspection (Slab) (1)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)  09.23.2021    
-- -- Inspection (Main Sewer Line) (0)  09.29.2021    
-- -- Inspection (Final Building) (4) *   10.25.2021     Fri, 10/22