ADDR
CONGERS - 3  ::  2823 Belgian Drive
[ BUILD: 20210000318 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
UPGRADES
---
CRITICAL PATH
Sat    May 16      Inspection (Concrete Wall) (1)      
Mon    May 18      Inspection (Conduit Under Slab) (1)      
    Inspection (Drain Tile) (0)      
Tue    May 19      Inspection (Rough In Plumbing) (1)      
Wed    May 20      Inspection (Rough In Electric) (1)      
Thu    May 21      Inspection (Framing) (1) *       
    Inspection (Deck Piers) (0)      
    Inspection (Main Water Line) (0)      
    Inspection (Final HVAC) (0)      
    Inspection (Final Plumbing) (0)      
    Inspection (Final Electric) (0)      
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Buyer requesting to add oak treads.  
    Glass Shower Door  
    UTile Shower in Master  
    Amendment from $281,900 to $287,700  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Inspection (Slab) (1)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)  09.23.2021    
-- -- Inspection (Main Sewer Line) (0)  09.29.2021    
-- -- Inspection (Final Building) (4) *   10.25.2021     Fri, 10/22