--   --   STAR: Add return and supply in crawlspace
Thu    Nov 28      Ratified Contract? (0)      
Thu    Nov 28      $2500 Deposit Received (0)      
Thu    Nov 28      Association Packet Requested (0)      
Thu    Nov 28      Association Packet Received (0)      
Thu    Nov 28      Selections Meeting (0)      
Thu    Nov 28      Selections Sheet Signed (0)      
Thu    Nov 28      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Thu    Nov 28      Deposit For Upgrades Received (0)      
Thu    Nov 28      Inspection (Concrete Wall) (1)      
Fri    Nov 29      Inspection (Conduit Under Slab) (1)      
Mon    Dec 2      Inspection (Drain Tile) (0)      
Mon    Dec 2      Settlement Agent Confirmed (0)      
Mon    Dec 2      Order Tubs / Showers (0)      
Mon    Dec 2      Framing II (8)      
Thu    Dec 12      Framing III (8) *       
Tue    Dec 24      Verify Window & Roof Structure (0)      
Tue    Dec 24      Install Stairs (0)      
Tue    Dec 24      House Number and Status in Window (0)      
Tue    Dec 24      Order Appliances (0)      
Tue    Dec 24      Patio (0)      
Tue    Dec 24      Rough In Microwave Vent (0)      
Tue    Dec 24      Inspection (Rough In Plumbing) (1)      
Wed    Dec 25      Inspection (Rough In Electric) (1)      
Thu    Dec 26      Inspection (Deck Piers) (0)      
Thu    Dec 26      Inspection (Framing) (1)      
Fri    Dec 27      Exterior Stone (0)      
Fri    Dec 27      Set Electric Meter (0)      
Fri    Dec 27      Inspection (Main Water Line) (0)      
Fri    Dec 27      Loan Approval (0)      
Fri    Dec 27      Deed Preparation (0)      
Fri    Dec 27      Garage Door (0)      
Fri    Dec 27      House Numbers (0)      
Fri    Dec 27      Mailbox (0)      
Fri    Dec 27      Order Plumbing / Lighting Fixtures (0)      
Fri    Dec 27      Interior Trim - Paint (1)      
Mon    Dec 30      Cover Floors (1)      
Tue    Dec 31      Deliver Plumbing / Lighting Fixtures (0)      
Tue    Dec 31      Shoe Moulding (0)      
Tue    Dec 31      Set Water Meter (0)      
Tue    Dec 31      Ceiling Fans (0)      
Tue    Dec 31      Blower Door Test (1)      
Wed    Jan 1      Paint 3 (2) *       
Fri    Jan 3      Appraiser Confirms Construction Completion (0)      
Fri    Jan 3      Inspection (Final HVAC) (1)      
Mon    Jan 6      Inspection (Final Plumbing) (1)      
Tue    Jan 7      Inspection (Final Electric) (1)      
Wed    Jan 8      Stain Hardwood Stairs (1)      
Thu    Jan 9      C.O. to Lender (0)      
Thu    Jan 9      Schedule Closing (0)      
Thu    Jan 9      Buyer Walk Through (1)      
Fri    Jan 10      Payment for Upgrades (0)      
Fri    Jan 10      Keys to Settlement Agent (0)      
Fri    Jan 10      Review Settlement Statement (0)      
Fri    Jan 10      Jerry Signs Closing Documents (0)      
Fri    Jan 10      Request Trash Tote From POA Manager (0)      
Fri    Jan 10      Closing (1)      
Mon    Jan 13      Remove Coded Lockbox (0)      
--   --   Pour Patio
--   --   Install Bookshelves
--   --   Home Inspection?
--   --   Install Bookshelves
--   --   Install Shower Door
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Windows & Doors (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)      
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)      
-- -- Cabinet Installation (2) *       
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0)      
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)      
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       All done except shower;
-- -- Install Appliances (0) *       
-- -- Carpet (2)       Installed April 11;
-- -- Inspection (Final Building) (2) *       
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *