New sod by glo fiber box after temp meter is gone |
Pettit |
|
|
-- |
-- |
Broken front window |
Living room - top sash - on order |
|
-- |
-- |
Bump out window siding issues |
Davenport |
|
-- |
-- |
Siding issue at bottom of bump out as seen from deck below |
Davenport |
|
-- |
-- |
Garage door 92, 35-37 |
|
|
-- |
-- |
Buyers are asking about price for LVP in room behind garage |
Kate waiting to see if Eric has enough LVP in stock to upgrade. |
|
-- |
-- |
Fix gutter on front left side |
|
|
-- |
-- |
Dormer is fixed but hole/gap below |
|
|
-- |
-- |
Finish downspout on front of townhouse at rock |
Davenport |
|
-- |
-- |
Piece of siding missing under window bump out above main level door to deck |
Davenport |
|
-- |
-- |
Heat pump not level |
Jason |
|
-- |
-- |
glue potentially needed under island |
Jill can you take a look |
|
-- |
-- |
Trim garage once cleaned out |
George |
|
-- |
-- |
Piece of trim loose on stairs leading to main level |
George |
|
-- |
-- |
Dishwasher needs set and fridge installed 9/3 |
Jill contacting CJ |
|
-- |
-- |
Granite scratches kitchen island |
Jill will call Greg H |
|
-- |
-- |
Hall bath electric cover needed |
Electrician |
|
-- |
-- |
Bulbs needed in dining light |
Electrician |
|
-- |
-- |
House number missing |
Jill |
|
-- |
-- |
Caulk under kitchen island |
Greg H |
|
-- |
-- |
CODED LOCKBOX 3737 |
|
|
-- |
-- |
Powder bath light needed |
|
|
-- |
-- |
HVAC covers |
|
|
-- |
-- |
Black shower drain |
|
|
-- |
-- |
Paint overspray on front door |
Painters |
|
-- |
-- |
Micro vent not working 9/16 |
CJ needs to vent it |
|
-- |
-- |
Kitchen island trim missing on right side |
George |
|
-- |
-- |
Floor repair in laundry room? |
Eagle |
|
-- |
-- |
shower door installed 9/18 or 9/19 |
In process 9/20 |
|
-- |
-- |
Home Inspection - Thursday, Sep 21 at 9AM |
|
|
-- |
-- |
2 towel bars in bonus room. 1 in others… |
|
|
-- |
-- |
Dented fridge |
CJ has ordered new doors, hopefully coming soon 10/16 |
|
-- |
-- |
Touch up trim in laundry room |
George needs painted |
|
-- |
-- |
Bent/damaged drop edger on right side of home |
Drip edge - roofer |
|
-- |
-- |
downspout is buried on front right corner of home |
|
|
-- |
-- |
loose aluminum wrapping on corners of basement door overhand |
|
|
-- |
-- |
loose aluminum wrapping on corners of basement door overhang |
Davenport |
|
-- |
-- |
Clean scuffs off tub in basement |
Jill |
|
-- |
-- |
exhaust fan in basement bathroom not functioning |
Electrician |
|
-- |
-- |
install all screens |
Jill |
|
-- |
-- |
cosmetic items need addressed |
Painter |
|
-- |
-- |
missing attic cover |
Jill |
|
-- |
-- |
loose trim under kitchen island |
George |
|
-- |
-- |
remove paint from all door hinges |
Painter |
|
-- |
-- |
master bathroom window frame not painted/finished |
Painter |
|
-- |
-- |
front door frame has a lot of wiggle room/doesnt lock correctly |
needs weather stripping |
|
-- |
-- |
damaged/warped siding on the base of the townhouse near heat pump |
Davenport |
|
-- |
-- |
bathtub on/off spouts lean down |
Plumber |
|
-- |
-- |
Caulk trim in hall bath tub |
Painter |
|
-- |
-- |
Stone loose on end of first retaining wall |
Stone guys |
|
-- |
-- |
Vinyl under master bath window is bowing out |
Davenport |
|
-- |
-- |
Vinyl under kitchen window bowing out |
Davenport |
|
-- |
-- |
corner of vinyl to be fixed right edge bump out window |
Davenport |
|
-- |
-- |
Replace back panel kitchen island |
Fred- Kate requested 9/28 |
|
-- |
-- |
paint scratches on near receptacle kitchen isladn |
Jill |
|
-- |
-- |
Clean overspray off all door knobs and bath accessories |
Painter |
|
-- |
-- |
make sure all towel bars are straight |
Joe |
|
-- |
-- |
bath faucets loose- need to be tightened |
Plumber |
|
-- |
-- |
Trim piece needed on both sides of kitchen sink |
Fred- Kate requested 9/28 |
|
-- |
-- |
Weather stripping garage door |
Jill |
|
-- |
-- |
Clean out garage and clean floors |
Jill |
|
-- |
-- |
adjust doors on both smaller bedrooms |
George |
|
-- |
-- |
Crack in tub |
Maybe Tuesday, Oct 17 |
|
-- |
-- |
Paint sides of townhouse |
Painter |
|
-- |
-- |
Loose trim on steps |
Painter |
|
-- |
-- |
Areas of “ sloppy or dripping paint” |
Painter - after Thanksgiving |
|
-- |
-- |
Glue on patio door |
Jill |
|
-- |
-- |
the rain gutter over the patio door that leaks, |
Davenport |
|
-- |
-- |
bonus room mirror needs replaced, |
Paul |
|
-- |
-- |
Garage keypad to be installed |
Jeff, Davenport |
|
-- |
-- |
Granite issue - Tom calling Fenco |
Kate approved slab. Installing 1/5 |
|
-- |
-- |
Will stormwater flow between townhouses? |
Will it affect foundation? |
|
-- |
-- |
Water pooling in backyard |
|
|
-- |
-- |
Water pooling in backyard |
Tom will talk to Bub |
|
-- |
-- |
Owners say they were told they would get fresh mulch this spring |
Curb Appeal |
|
-- |
-- |
The boards under the patio are showing |
|
|
-- |
-- |
Weather stripping under bottom of patio door |
Tom (we have it) |
|
-- |
-- |
Replace piece of siding damaged by lawn care company |
Davenport |
|
-- |
-- |
Is there still a temporary meter here? |
SVEC needs to remove it |
|
-- |
-- |
Glo Fiber box |
can we adjust it? |
|
-- |
-- |
Ratified Contract? (0)
02.21.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0)
02.23.2023 |
|
|
-- |
-- |
Association Packet Requested (0)
02.21.2023 |
|
|
-- |
-- |
Association Packet Received (0)
02.23.2023 |
|
|
-- |
-- |
Selections Meeting (0)
03.07.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0)
03.22.2023 |
3/7: sent to Katie |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
08.13.2023 |
8/12: Sent to Jerry to sign |
|
-- |
-- |
Deposit For Upgrades Received (0)
03.25.2023 |
|
|
-- |
-- |
Building Permit (30)
11.07.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
05.01.2023 |
|
|
-- |
-- |
Order Windows & Doors (0)
05.01.2023 |
|
|
-- |
-- |
Stake Out Home (1)
01.02.2023 |
|
|
-- |
-- |
Excavate (2)
01.02.2023 |
|
|
-- |
-- |
Inspection (Footers) (1)
01.02.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
01.31.2023 |
|
|
-- |
-- |
Pour Footers (1)
01.02.2023 |
|
|
-- |
-- |
Set Forms (2)
01.31.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1)
01.31.2023 |
|
|
-- |
-- |
Plumb Slab (2)
03.23.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
03.23.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
03.23.2023 |
|
|
-- |
-- |
Prepare Slab (1)
03.23.2023 |
|
|
-- |
-- |
Inspection (Slab) (1)
03.23.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
03.23.2023 |
|
|
-- |
-- |
Pour Slab (1)
03.23.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
02.22.2023 |
|
|
-- |
-- |
Framing I (9)
04.27.2023 |
|
|
-- |
-- |
Order Steps (0)
05.01.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0)
05.20.2023 |
|
|
-- |
-- |
Framing II (8)
04.27.2023 |
|
|
-- |
-- |
Framing III (8)
05.11.2023 |
|
|
-- |
-- |
Verify Window & Roof Structure (0)
12.11.2023 |
|
|
-- |
-- |
Install Stairs (0)
05.17.2023 |
|
|
-- |
-- |
Windows & Doors (0)
05.24.2023 |
|
|
-- |
-- |
House Number and Status in Window (0)
06.14.2023 |
|
|
-- |
-- |
Roofing (0)
05.24.2023 |
|
|
-- |
-- |
Order Cabinets (0)
06.06.2023 |
|
|
-- |
-- |
Order Appliances (0)
07.31.2023 |
|
|
-- |
-- |
Deck (0)
06.12.2023 |
|
|
-- |
-- |
Gutters (0)
08.02.2023 |
|
|
-- |
-- |
Driveway (0)
08.19.2023 |
|
|
-- |
-- |
Patio (0)
08.02.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0)
09.13.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
09.27.2023 |
front landscaping needed |
|
-- |
-- |
HVAC Rough In (4)
06.14.2023 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
06.22.2023 |
|
|
-- |
-- |
Rough In Microwave Vent (0)
12.11.2023 |
|
|
-- |
-- |
Plumbing Rough In (4)
06.22.2023 |
In process 6/14 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
06.22.2023 |
|
|
-- |
-- |
Electric Rough In (4)
06.22.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1)
06.26.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
06.26.2023 |
|
|
-- |
-- |
Inspection (Framing) (1)
06.26.2023 |
|
|
-- |
-- |
Exterior Vinyl (0)
07.22.2023 |
in process 7/16 |
|
-- |
-- |
Exterior Stone (0)
08.05.2023 |
in process 8/2 |
|
-- |
-- |
Insulation (2)
06.26.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1)
06.28.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
08.21.2023 |
|
|
-- |
-- |
Set Electric Meter (0)
09.14.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
03.20.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
03.20.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
07.31.2023 |
|
|
-- |
-- |
Drywall (Hang) (4)
07.01.2023 |
In process 6/28 |
|
-- |
-- |
Loan Approval (0)
09.21.2023 |
|
|
-- |
-- |
Deed Preparation (0)
08.28.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
07.09.2023 |
In process 7/1 |
|
-- |
-- |
Paint 1 (1)
07.12.2023 |
|
|
-- |
-- |
Garage Door (0)
08.23.2023 |
|
|
-- |
-- |
House Numbers (0)
08.30.2023 |
|
|
-- |
-- |
Mailbox (0)
09.24.2023 |
|
|
-- |
-- |
Cabinet Installation (2)
07.22.2023 |
7/17 |
|
-- |
-- |
Granite Installation (1)
08.05.2023 |
8/4 |
|
-- |
-- |
Interior Trim - Install (3)
08.05.2023 |
In process 8/2 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
08.05.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1)
08.09.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
08.16.2023 |
|
|
-- |
-- |
Luxury Vinyl Tile (0)
08.16.2023 |
|
|
-- |
-- |
Paint 2 (3)
08.09.2023 |
|
|
-- |
-- |
Cover Floors (1)
08.19.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
08.16.2023 |
|
|
-- |
-- |
Shoe Moulding (0)
08.30.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
09.18.2023 |
In process 9/13. Needs shelving and mirrors. |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
09.13.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
08.21.2023 |
|
|
-- |
-- |
Set Water Meter (0)
08.28.2023 |
|
|
-- |
-- |
Electric Trim Out (3)
09.06.2023 |
In process 9/3 |
|
-- |
-- |
Ceiling Fans (0)
08.26.2023 |
|
|
-- |
-- |
HVAC Trim Out (1)
09.18.2023 |
Needs vent covers |
|
-- |
-- |
Blower Door Test (1)
10.27.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2)
09.18.2023 |
Finishing 9/13 |
|
-- |
-- |
Install Appliances (0)
08.31.2023 |
Delivery 8/10 |
|
-- |
-- |
Paint 3 (2)
08.30.2023 |
In process 8/26 |
|
-- |
-- |
Carpet (2)
08.19.2023 |
In process 8/16 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
09.25.2023 |
9/18 or 9/19 |
|
-- |
-- |
Inspection (Final HVAC) (1)
09.20.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1)
09.20.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
09.20.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2)
09.20.2023 |
|
|
-- |
-- |
Pre Walk Through (0)
09.25.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
09.13.2023 |
In process 9/3 |
|
-- |
-- |
Cleaning (1)
09.27.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1)
09.27.2023 |
|
|
-- |
-- |
C.O. to Lender (0)
09.27.2023 |
|
|
-- |
-- |
Schedule Closing (0)
09.24.2023 |
|
|
-- |
-- |
Buyer Walk Through (1)
09.28.2023 |
Wed, Sep 27? |
|
-- |
-- |
Payment for Upgrades (0)
09.25.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
09.21.2023 |
|
|
-- |
-- |
Review Settlement Statement (0)
09.27.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
08.16.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
09.25.2023 |
|
|
-- |
-- |
Closing (1)
10.02.2023 |
Brittany @ West View Title (Fri, Sep 29) |
|
-- |
-- |
Remove Coded Lockbox (0)
10.07.2023 |
|
|