Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Front bedroom window needed |
|
|
-- |
-- |
Insulate tubs |
|
|
-- |
-- |
Side splash needed for hall vanity? |
needs caulking |
|
-- |
-- |
Retaining Wall around back patio |
|
|
-- |
-- |
Siding falling 5/30 |
|
|
-- |
-- |
CODED LOCKBOX 0129 |
|
|
-- |
-- |
Attic cover |
Painter |
|
-- |
-- |
Fix shelving after carpet installation |
|
|
-- |
-- |
Blemish in ceiling (drywall repair) |
|
|
-- |
-- |
Outside electric needs done 132-129 |
|
|
-- |
-- |
Touch up paint |
Painter |
|
-- |
-- |
Finish main level electric trim out |
|
|
-- |
-- |
Basement window needs trimmed |
Trimmed now just needs tape trimmed - Jill |
|
-- |
-- |
Driveway, Tues, June 21 |
|
|
-- |
-- |
Patches around kitchen pendant lights |
Painter-needs to be painted? Patch appears done. |
|
-- |
-- |
Trim closet door |
master bedroom closet - Edgar |
|
-- |
-- |
Paint foundation |
Painter- after sod goes down |
|
-- |
-- |
Powder bath bulbs |
Jill |
|
-- |
-- |
Closet handle up bedroom |
Joe |
|
-- |
-- |
Shingle sticking out on front side of roof |
Tom |
|
-- |
-- |
Mailbox numbers needed |
Jill |
|
-- |
-- |
Door plugs |
Jill |
|
-- |
-- |
Insulation on carpet upstairs landing |
Jill or Eric |
|
-- |
-- |
Sand concrete repair |
Tom |
|
-- |
-- |
sand and paint around dining light |
|
|
-- |
-- |
Secure bottom square of post to deck at house |
Tom |
|
-- |
-- |
remove red cover from alarm |
Jill |
|
-- |
-- |
paint and caulk shoe at front door |
|
|
-- |
-- |
tray ceiling drywall corners |
|
|
-- |
-- |
cut vent into master bath floor |
Jill |
|
-- |
-- |
place attic access cover |
Needs painting/insulation clean up 7/13 |
|
-- |
-- |
Cut down master closet door |
Jill will coordinate |
|
-- |
-- |
fix crack in hall bath tub |
|
|
-- |
-- |
Fix broken trim t base of French doors |
|
|
-- |
-- |
remove trash and cement from backyard |
|
|
-- |
-- |
Power wash back |
|
|
-- |
-- |
Fix sheetrock above HVAC |
Drywaller |
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Clean master closet floor |
Jill |
|
-- |
-- |
Is HVAC tube in basement supposed to be hooked up? |
|
|
-- |
-- |
Fix dips in concrete |
Tom will coordinate |
|
-- |
-- |
Ratified Contract? (0) 11.21.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Requested (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Received (0) 11.21.2021 |
|
|
-- |
-- |
Selections Meeting (0) 01.04.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 01.26.2022 |
1/4/2022: sent to Nina for buyer signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 02.10.2022 |
1/26/2022: sent to Nina for buyer signatures |
|
-- |
-- |
Deposit For Upgrades Received (0) 01.26.2022 |
n/a |
|
-- |
-- |
Building Permit (30) 11.11.2021 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 11.11.2021 |
|
|
-- |
-- |
Order Windows & Doors (0) 04.25.2022 |
|
|
-- |
-- |
Stake Out Home (1) 11.08.2021 |
|
|
-- |
-- |
Excavate (2) 11.29.2021 |
|
|
-- |
-- |
Inspection (Footers) (1) 11.29.2021 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 02.14.2023 |
|
|
-- |
-- |
Pour Footers (1) 11.29.2021 |
|
|
-- |
-- |
Set Forms (2) 12.06.2021 |
in process 12/1 |
|
-- |
-- |
Pour Foundation Walls (1) 12.09.2021 |
|
|
-- |
-- |
Plumb Slab (2) 12.13.2021 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.20.2021 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 02.14.2023 |
|
|
-- |
-- |
Prepare Slab (1) 12.20.2021 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.20.2021 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 02.14.2023 |
|
|
-- |
-- |
Pour Slab (1) * 12.20.2021 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 04.13.2022 |
|
|
-- |
-- |
Framing I (9) 01.03.2022 |
|
|
-- |
-- |
Order Steps (0) 12.20.2021 |
|
|
-- |
-- |
Order Tubs / Showers (0) 12.09.2021 |
|
|
-- |
-- |
Framing II (8) 01.17.2022 |
|
|
-- |
-- |
Framing III (8) * 02.03.2022 |
|
|
-- |
-- |
Install Stairs (0) 02.24.2022 |
|
|
-- |
-- |
Windows & Doors (0) 03.13.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 02.28.2022 |
|
|
-- |
-- |
Roofing (0) 02.14.2022 |
|
|
-- |
-- |
Order Cabinets (0) 01.31.2022 |
|
|
-- |
-- |
Order Appliances (0) 02.24.2022 |
Standard |
|
-- |
-- |
Deck (0) 04.25.2022 |
in process-expanded deck |
|
-- |
-- |
Gutters (0) 05.02.2022 |
|
|
-- |
-- |
Driveway (0) 06.27.2022 |
Expanded Patio 10x10 - Tuesday, June 21 |
|
-- |
-- |
Patio (0) 02.14.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 04.25.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 06.29.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 02.24.2022 |
in process 2/16 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 03.24.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 03.23.2022 |
in process 3/12 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 02.14.2023 |
|
|
-- |
-- |
Electric Rough In (4) 03.23.2022 |
In process 3/19 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 02.14.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 02.14.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 04.18.2022 |
|
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 03.30.2022 |
3/25 or 3/26 |
|
-- |
-- |
Inspection (Insulation) (1) 03.31.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 06.02.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 04.14.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 02.14.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 03.10.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 04.10.2022 |
|
|
-- |
-- |
Loan Approval (0) 06.30.2022 |
|
|
-- |
-- |
Deed Preparation (0) 04.13.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 04.18.2022 |
In process 4/13 |
|
-- |
-- |
Paint 1 (1) 04.18.2022 |
|
|
-- |
-- |
Garage Door (0) 04.04.2022 |
|
|
-- |
-- |
House Numbers (0) 06.29.2022 |
|
|
-- |
-- |
Mailbox (0) 07.03.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 04.18.2022 |
4/14 |
|
-- |
-- |
Granite Installation (1) * 05.07.2022 |
5/6 |
|
-- |
-- |
Interior Trim - Install (3) 05.11.2022 |
5/7 needs painting |
|
-- |
-- |
Interior Trim - Paint (1) 02.14.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 05.30.2022 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 06.01.2022 |
Hall bath left 5/30 |
|
-- |
-- |
Paint 2 (3) 05.25.2022 |
|
|
-- |
-- |
Cover Floors (1) 06.29.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 06.05.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 06.08.2022 |
On site 6/5 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 06.12.2022 |
Almost complete 6/8 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 06.05.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 05.19.2022 |
|
|
-- |
-- |
Set Water Meter (0) 06.09.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 06.18.2022 |
Black Lighting. In process 6/12. Kitchen needs completed. |
|
-- |
-- |
Ceiling Fans (0) 05.16.2022 |
|
|
-- |
-- |
HVAC Trim Out (1) 06.15.2022 |
Furnace set 6/1 |
|
-- |
-- |
Plumbing Trim Out (2) 06.05.2022 |
Black Standard |
|
-- |
-- |
Install Appliances (0) * 06.08.2022 |
|
|
-- |
-- |
Paint 3 (2) * 06.12.2022 |
|
|
-- |
-- |
Carpet (2) 06.25.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 07.06.2022 |
Mon, July 4 |
|
-- |
-- |
Inspection (Final HVAC) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 07.05.2022 |
Fri, July 1 |
|
-- |
-- |
Pre Walk Through (0) 07.05.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 06.29.2022 |
|
|
-- |
-- |
Cleaning (1) 07.10.2022 |
Thurs, Jul 7 |
|
-- |
-- |
Certificate of Occupancy (1) * 07.06.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 07.07.2022 |
|
|
-- |
-- |
Schedule Closing (0) 07.07.2022 |
Tue, June 12 |
|
-- |
-- |
Buyer Walk Through (1) 07.13.2022 |
Mon, July 11 confirmed for 2:00 PM |
|
-- |
-- |
Payment for Upgrades (0) 06.30.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 06.28.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 07.08.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 06.30.2022 |
Wednesday, June 29, 1:00 PM |
|
-- |
-- |
Request Trash Tote From POA Manager (0) 06.28.2022 |
|
|
-- |
-- |
Closing (1) 07.13.2022 |
Brittany @ West View Title (June 12) |
|
-- |
-- |
Remove Coded Lockbox (0) 08.29.2022 |
|
|