CONGERS-2 - 7  ::  1334 Palomino Trail
[ BUILD: 20210001843 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
    Verify Window & Roof Structure (0)      
    Rough In Microwave Vent (0)      
    Order Plumbing / Lighting Fixtures (0)      
Tue    Feb 3      Blower Door Test (1)      
TO DO - COMPLETED OR DELETED
Set forms 12/26
Drywall garage hole? Needs sanding 5/30
Pedestal sink powder bath needs put together.
Secure toe kick under cabinets/island in the kitchen
Powder Bathroom outlet by sink- receptacle uneven out of wall Electrician
Drywall corners tray ceiling Drywaller
Drywall hole above escutcheon master toilet Drywaller
Drywall hole- light switch top of first set of steps Drywaller
Needs overall paint touch up 7/13
CODED LOCKBOX 7777
Gutter repairs Tom
Paint front door trim Jill
Clean out garage/bonus room before mondays walkthrough
Hot water pipe needs extending Plumber
Few bulbs missing Jill
Mailbox numbers 6-10
Small spot kitchen ceiling 7/24 Needs sanding/painted - Painter
Staining in master shower? And hall bath - Jill
Raise dining chandelier Electrician
New ski for notched out island panel
Sand and paint drywall mud in kitchen ceiling above refrigerator Painter
Paint around pendant lights in kitchen Painter
Powder bath paint touchups and powder bath ceiling around Fan Painter
Phil drywall hole above master bath toilet escutcheon Painter
Laundry room fix drywall and caulk around dryer vent and paint touch up behind laundry room door Painter
Caulk around the base of all toilets Painter
Take screws out of attic access cover Jill
Paint trim around attic access Painter
New skin for notched out island panel Kate will ask Kimberly to order it (6-8 weeks)
Smoke detector beeps Tom
Siding issues outside siding - same issues at Lot 6
UPGRADES - COMPLETED
    Luxury Vinyl Plank - Upper Level  
    Painted Pine Steps  
    Expanded Driveway  
    Amendment to increase price by $4,400  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  11.21.2021    
-- -- $2500 Deposit Received (0)  11.21.2021    
-- -- Association Packet Requested (0)  11.21.2021    
-- -- Association Packet Received (0)  11.21.2021    
-- -- Selections Meeting (0)  12.07.2021    
-- -- Selections Sheet Signed (0)  12.09.2021     12/7/2021: Sent to Mattias for buyer signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  12.17.2021     12/16/2021: sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  12.16.2021     12/8/2021: waiting on deposit check from buyer
-- -- Building Permit (30) *   11.11.2021    
-- -- Order Roof & Floor Trusses (1)  11.11.2021    
-- -- Order Windows & Doors (0)  11.11.2021    
-- -- Stake Out Home (1)  12.09.2021    
-- -- Excavate (2)  12.09.2021    
-- -- Inspection (Footers) (1)  12.14.2021    
-- -- Inspection (Concrete Wall) (1)  02.14.2023    
-- -- Pour Footers (1) *   12.14.2021    
-- -- Set Forms (2)  01.03.2022     In process 12/26
-- -- Pour Foundation Walls (1)  01.03.2022    
-- -- Plumb Slab (2)  01.17.2022    
-- -- Inspection (Plumbing Under Slab) (1)  01.31.2022    
-- -- Inspection (Conduit Under Slab) (1)  02.14.2023    
-- -- Prepare Slab (1)  02.03.2022    
-- -- Inspection (Slab) (1)  02.03.2022    
-- -- Inspection (Drain Tile) (0)  02.14.2023    
-- -- Pour Slab (1) *   02.10.2022     needs garage poured 2/2
-- -- Settlement Agent Confirmed (0)  04.27.2022    
-- -- Framing I (9)  02.24.2022    
-- -- Order Steps (0)  03.10.2022    
-- -- Order Tubs / Showers (0)  03.30.2022    
-- -- Framing II (8)  03.07.2022    
-- -- Framing III (8) *   03.13.2022    
-- -- Install Stairs (0) *   03.10.2022    
-- -- Windows & Doors (0) *   03.30.2022    
-- -- House Number and Status in Window (0)  04.24.2022    
-- -- Roofing (0) *   03.30.2022    
-- -- Order Cabinets (0)  01.31.2022    
-- -- Order Appliances (0)  05.16.2022     Standard
-- -- Deck (0)  04.23.2022     n/a
-- -- Gutters (0)  06.08.2022    
-- -- Driveway (0) *   07.05.2022     Expanded Driveway
-- -- Patio (0)  02.14.2023    
-- -- Privacy Divider / Fence (0) *   07.05.2022    
-- -- Sod / Seed / Landscaping (0)  07.14.2022    
-- -- HVAC Rough In (4)  03.30.2022    
-- -- Plumbing Rough In (4)  04.07.2022    
-- -- Electric Rough In (4)  04.14.2022     In process 4/13
-- -- Inspection (Rough In HVAC) (1)  04.20.2022     4/14
-- -- Inspection (Rough In Plumbing) (1)  02.14.2023    
-- -- Inspection (Rough In Electric) (1)  02.14.2023    
-- -- Inspection (Framing) (1) *   02.14.2023    
-- -- Inspection (Deck Piers) (0)  02.14.2023    
-- -- Exterior Vinyl (0) *   06.05.2022    
-- -- Exterior Stone (0)  04.14.2022    
-- -- Insulation (2) *   04.20.2022    
-- -- Inspection (Insulation) (1)  04.21.2022    
-- -- Inspection (Electric Service) (0)  06.30.2022    
-- -- Set Electric Meter (0) *   04.11.2023    
-- -- Inspection (Main Sewer Line) (0)  05.12.2022    
-- -- Inspection (Main Water Line) (0)  02.14.2023    
-- -- Order Interior Doors & Trim (0)  05.02.2022    
-- -- Drywall (Hang) (4) *   04.27.2022     In process. Almost complete 4/24
-- -- Loan Approval (0)  06.30.2022    
-- -- Deed Preparation (0)  04.27.2022    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   05.02.2022     In process 5/1
-- -- Paint 1 (1)  05.04.2022    
-- -- Garage Door (0)  06.29.2022    
-- -- House Numbers (0)  07.11.2022    
-- -- Mailbox (0)  07.17.2022    
-- -- Cabinet Installation (2) *   05.08.2022     5/5
-- -- Granite Installation (1) *   05.15.2022    
-- -- Interior Trim - Install (3) *   05.18.2022     Completed. Needs painted. 5/15
-- -- Interior Trim - Paint (1)  02.14.2023    
-- -- Luxury Vinyl Plank (3) *   06.12.2022     In process 6/8
-- -- Luxury Vinyl Tile (0)  06.08.2022     In process 6/5
-- -- Paint 2 (3)  06.18.2022    
-- -- Cover Floors (0)  06.18.2022    
-- -- Deliver Plumbing / Lighting Fixtures (0)  06.29.2022    
-- -- Shoe Moulding (0)  06.25.2022     On site 6/19
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   07.10.2022     Brushed Nickel accessories
-- -- Install Coded Lockbox (add extra keys) (0)  07.13.2022    
-- -- Pay Water / Sewer Taps (0)  06.16.2022    
-- -- Set Water Meter (1) *   07.21.2022    
-- -- Electric Trim Out (3) *   07.17.2022     Brushed Nickel. In process. 7/13. Almost complete.
-- -- Ceiling Fans (0)  06.30.2022    
-- -- HVAC Trim Out (1) *   07.10.2022    
-- -- Plumbing Trim Out (2) *   06.25.2022     Brushed Nickel Standard
-- -- Install Appliances (0) *   07.13.2022     Standard SS. On site 6/18
-- -- Paint 3 (2) *   06.25.2022    
-- -- Carpet (2)  06.18.2022    
-- -- Appraiser Confirms Construction Completion (0)  08.04.2022    
-- -- Inspection (Final HVAC) (0)  02.14.2023    
-- -- Inspection (Final Plumbing) (0)  02.14.2023    
-- -- Inspection (Final Electric) (0)  02.14.2023    
-- -- Inspection (Final Building) (4) *   07.25.2022     July 21
-- -- Pre Walk Through (0)  07.24.2022    
-- -- Stain Hardwood Stairs (1) *   07.21.2022     In process 7/17
-- -- Cleaning (1)  07.24.2022     almost completed 7/21
-- -- Certificate of Occupancy (1) *   07.25.2022    
-- -- C.O. to Lender (0)  07.25.2022    
-- -- Schedule Closing (0)  08.04.2022    
-- -- Buyer Walk Through (1) *   07.25.2022     Monday July 25 8am
-- -- Payment for Upgrades (0)  07.22.2022    
-- -- Keys to Settlement Agent (0)  07.22.2022    
-- -- Review Settlement Statement (0)  08.04.2022    
-- -- Jerry Signs Closing Documents (0)  07.26.2022    
-- -- Request Trash Tote From POA Manager (0)  08.03.2022    
-- -- Closing (1)  08.04.2022     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  08.18.2022