|
-- |
-- |
Broken upstairs bedroom window 4/18 |
Tom is ordered 5/5 |
|
-- |
-- |
All front faucets on vinyl houses need plastic cover |
|
|
-- |
-- |
Plumbing trim out basement bath |
|
|
-- |
-- |
Drywall repair above light basement bath 7/13 |
Drywallers |
|
-- |
-- |
Needs foyer light 7/17 |
Snap light installed by mistake |
|
-- |
-- |
Lightbulbs needed |
Lots! |
|
-- |
-- |
Hand towel holder powder bath |
Basement bath only |
|
-- |
-- |
Caulk side splash of sinks |
Painter |
|
-- |
-- |
LOCKBOX 9999 |
|
|
-- |
-- |
Dent in refrigerator |
Kate will check with Leisa |
|
-- |
-- |
Finish drywall patch in basement bath |
Painter |
|
-- |
-- |
Push powder bath vent up |
|
|
-- |
-- |
Issue with kitchen cabinet? |
|
|
-- |
-- |
Push powder bath fan in place |
Jill |
|
-- |
-- |
Remove plastic from top of cabinets |
Jill |
|
-- |
-- |
Touch up paint |
|
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Add or move bracket down on handrail to bedroom level |
Edgar |
|
-- |
-- |
Receptacle cut to large in Island |
Tom |
|
-- |
-- |
LVP transition to bedroom steps gapping at right and left side |
Both transitions at the landing and at the top of the stairs |
|
-- |
-- |
Bonus room swap small snap light with a much larger light |
Waiting on new fixture |
|
-- |
-- |
Caulk side splash in bonus bath |
Painter |
|
-- |
-- |
Weatherstriping front door |
Jill |
|
-- |
-- |
Scratches bonus room ceiling |
Painter |
|
-- |
-- |
Delayed closing - updating appraisal |
Likely week of Aug 22 |
|
-- |
-- |
Touch up paint |
Painter |
|
-- |
-- |
Caulk between cabinet and fridge panel |
Painter |
|
-- |
-- |
Add brackets to handrail |
Trim guy or painter |
|
-- |
-- |
Strap on water heater to blue pipe |
Plumber |
|
-- |
-- |
Repair show at right side of island (left too long) |
Shoe molding - Edgar, trim guy |
|
-- |
-- |
Caulk between shoe adn back panel of island. |
Painter |
|
-- |
-- |
Sand and paint spot near living room ceiling fan |
Painter |
|
-- |
-- |
Paint smudges at living room snap lights |
Painter |
|
-- |
-- |
Hall Bathroom- vertical trim between vanity and wall to be secured. |
Edgar, the trim guy |
|
-- |
-- |
Clean spot off carpet master bedroom |
Jill |
|
-- |
-- |
Drywall seams to be repaired in master bedroom wall adn master bath |
Drywaller, Painter |
|
-- |
-- |
Master Bath vanity shoe mold to be caulked |
Painter |
|
-- |
-- |
Paint touch up spots on kitchen ceiling (3) |
Painter |
|
-- |
-- |
Adjust refrigerator- uneven |
CJ |
|
-- |
-- |
paint touchup throughout |
Painter |
|
-- |
-- |
Vinyl Siding needs repaired |
|
|
-- |
-- |
Vinyl Siding needs repaired |
Davenport |
|
-- |
-- |
missing piece of siding at top of townhouse |
|
|
-- |
-- |
Ratified Contract? (0) 11.21.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Requested (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Received (0) 11.21.2021 |
|
|
-- |
-- |
Selections Meeting (0) 12.06.2021 |
|
|
-- |
-- |
Selections Sheet Signed (0) 12.10.2021 |
12/6/2021: sent to Tara for buyer signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 12.23.2021 |
12/23/2021: sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 12.23.2021 |
12/9/2021: waiting on upgrade deposit check |
|
-- |
-- |
Building Permit (30) 11.11.2021 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 11.11.2021 |
|
|
-- |
-- |
Order Windows & Doors (0) 11.11.2021 |
|
|
-- |
-- |
Stake Out Home (1) 12.09.2021 |
|
|
-- |
-- |
Excavate (2) 12.09.2021 |
|
|
-- |
-- |
Inspection (Footers) (1) 12.14.2021 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 02.14.2023 |
|
|
-- |
-- |
Pour Footers (1) 12.14.2021 |
|
|
-- |
-- |
Set Forms (2) 01.03.2022 |
In process 12/26 |
|
-- |
-- |
Pour Foundation Walls (1) 01.03.2022 |
|
|
-- |
-- |
Plumb Slab (2) 01.17.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 01.31.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 02.14.2023 |
|
|
-- |
-- |
Prepare Slab (1) 02.03.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 02.03.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 02.14.2023 |
|
|
-- |
-- |
Pour Slab (1) * 02.10.2022 |
needs garage poured 2/2 |
|
-- |
-- |
Settlement Agent Confirmed (0) 01.11.2022 |
|
|
-- |
-- |
Framing I (9) 02.24.2022 |
|
|
-- |
-- |
Order Steps (0) 03.10.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 03.30.2022 |
|
|
-- |
-- |
Framing II (8) 03.07.2022 |
|
|
-- |
-- |
Framing III (8) * 03.13.2022 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 06.20.2024 |
|
|
-- |
-- |
Install Stairs (0) 03.10.2022 |
|
|
-- |
-- |
Windows & Doors (0) 03.30.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 04.25.2022 |
|
|
-- |
-- |
Roofing (0) 03.30.2022 |
|
|
-- |
-- |
Order Cabinets (0) 01.31.2022 |
|
|
-- |
-- |
Order Appliances (0) 05.16.2022 |
Standard |
|
-- |
-- |
Deck (0) 04.23.2022 |
n/a |
|
-- |
-- |
Gutters (0) 06.09.2022 |
|
|
-- |
-- |
Driveway (0) 07.06.2022 |
Expanded Driveway, 10x18 Expanded Patio |
|
-- |
-- |
Patio (0) 02.14.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 07.05.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 07.14.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 04.07.2022 |
In process 3/30 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 05.01.2022 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 06.20.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 04.18.2022 |
In process 4/13 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 02.14.2023 |
|
|
-- |
-- |
Electric Rough In (4) 04.27.2022 |
In process 4/24 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 02.14.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 02.14.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 06.09.2022 |
In process5/25 |
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 05.01.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 05.08.2022 |
5/3 |
|
-- |
-- |
Inspection (Electric Service) (0) 06.30.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 05.12.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 02.14.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 05.02.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 05.15.2022 |
All but bonus room5/8 |
|
-- |
-- |
Loan Approval (0) 07.14.2022 |
|
|
-- |
-- |
Deed Preparation (0) 04.13.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 05.23.2022 |
In process 5/18 |
|
-- |
-- |
Paint 1 (1) 05.25.2022 |
5/23 |
|
-- |
-- |
Garage Door (0) 05.25.2022 |
|
|
-- |
-- |
House Numbers (0) 07.11.2022 |
|
|
-- |
-- |
Mailbox (0) 07.17.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 06.05.2022 |
June 2 |
|
-- |
-- |
Granite Installation (1) * 06.18.2022 |
|
|
-- |
-- |
Interior Trim - Install (3) 06.12.2022 |
Needs painted 6/8 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 06.20.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 02.14.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 06.18.2022 |
In process 6/15 |
|
-- |
-- |
Luxury Vinyl Tile (0) 06.18.2022 |
|
|
-- |
-- |
Paint 2 (3) 07.10.2022 |
|
|
-- |
-- |
Cover Floors (1) 07.10.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 06.29.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 06.29.2022 |
In process 6/25 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 07.17.2022 |
(no master shelving) Bonus Bath. In process 7/13 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 07.20.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 06.16.2022 |
|
|
-- |
-- |
Set Water Meter (0) 07.18.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 07.17.2022 |
Black Lighting in process 7/13 |
|
-- |
-- |
Ceiling Fans (0) 07.13.2022 |
Living Room |
|
-- |
-- |
HVAC Trim Out (1) 07.10.2022 |
|
|
-- |
-- |
Blower Door Test (1) 06.20.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2) 07.03.2022 |
Black Standard. In process 6/29 |
|
-- |
-- |
Install Appliances (0) * 07.21.2022 |
by wednesday 7/20 |
|
-- |
-- |
Paint 3 (2) * 07.06.2022 |
|
|
-- |
-- |
Carpet (2) 07.17.2022 |
Upstairs beds |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 08.15.2022 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 07.25.2022 |
7/21 |
|
-- |
-- |
Pre Walk Through (0) 07.21.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 08.03.2022 |
in process 7/31 |
|
-- |
-- |
Cleaning (1) 08.03.2022 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 07.25.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 07.25.2022 |
|
|
-- |
-- |
Schedule Closing (0) 08.18.2022 |
Likely closing Tuesday, August 16 |
|
-- |
-- |
Buyer Walk Through (1) 08.07.2022 |
Thu, Aug 4, 12PM |
|
-- |
-- |
Payment for Upgrades (0) 07.22.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 07.22.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 08.18.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 07.26.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 08.03.2022 |
|
|
-- |
-- |
Closing (1) 08.18.2022 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 08.17.2022 |
|
|