Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Cover stairs 4/24 |
|
|
-- |
-- |
Cover stairs 4/24 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Expanded patio? |
|
|
-- |
-- |
Basement drain sticking out of wall |
radon pipe - Tom |
|
-- |
-- |
Painted steps upgrade? |
|
|
-- |
-- |
Three roll out trays… |
One is missing, Kate will follow up |
|
-- |
-- |
One kitchen handle missing |
Kate will follow up |
|
-- |
-- |
Painted cabinet upgrade? |
|
|
-- |
-- |
Granite size ok? |
sizing issue. Awaiting to hear back from Greg. |
|
-- |
-- |
Paint 1 |
|
|
-- |
-- |
Fix hardwood tread cover |
|
|
-- |
-- |
Missing one shower wall |
|
|
-- |
-- |
|
|
|
-- |
-- |
Missing fan cover? Broken? |
Jill to ask electrician |
|
-- |
-- |
Screw covers at front door and French doors |
Jill |
|
-- |
-- |
Drywall repair at three light switch in kitchen |
Drywaller |
|
-- |
-- |
French door not closing correctly |
Tom |
|
-- |
-- |
Missing shoe mold on right side of landing |
Trim |
|
-- |
-- |
Show needed whole upstairs |
Shoe moulding trim |
|
-- |
-- |
Big paint touch ups in all bedrooms at baseboards |
Painter |
|
-- |
-- |
Big paint touch ups in all bedrooms at baseboards |
|
|
-- |
-- |
Closet door needed basement |
Needs painting, painter |
|
-- |
-- |
Wood in basement? |
Tom |
|
-- |
-- |
CODED LOCKBOX 0125 |
|
|
-- |
-- |
Garage trim needed |
Trim guy |
|
-- |
-- |
Cabinet trim needed |
Jill will check for material |
|
-- |
-- |
Finish weatherstripping |
Jill |
|
-- |
-- |
Touch up paint |
Painter-in process 8/31 |
|
-- |
-- |
Screens |
Jill |
|
-- |
-- |
Gaps in stairs. Maker sure painters caulk |
Painter |
|
-- |
-- |
Clean out garage |
|
|
-- |
-- |
Need black drain in master shower |
Jill |
|
-- |
-- |
Weatherstripping at the front door |
|
|
-- |
-- |
Final clean of all floors and surfaces |
|
|
-- |
-- |
Chip near the deadbolt on French door |
Painter |
|
-- |
-- |
Remove sticker from the back of the island |
Jill |
|
-- |
-- |
Replace a cracked receptacle in Dining room |
Switch faceplate |
|
-- |
-- |
Replace brushed nickel drain with black drain in the master shower |
|
|
-- |
-- |
Sand and repaint nearest strip in between second and third bedroom |
|
|
-- |
-- |
Hinge pin missing hall bathroom door |
Jill |
|
-- |
-- |
Remove block behind the bonus bathroom door, right floor |
Tom |
|
-- |
-- |
Clean off back patio and deck |
Jill |
|
-- |
-- |
Mop bonus room floor |
Jill |
|
-- |
-- |
Garage painting and trim |
|
|
-- |
-- |
Install pen self closing garage door |
Waiting on pins |
|
-- |
-- |
Address the double trashcan that does not close |
Tom |
|
-- |
-- |
Ice maker? |
|
|
-- |
-- |
Ratified Contract? (0) 11.21.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Requested (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Received (0) 11.21.2021 |
|
|
-- |
-- |
Selections Meeting (0) 11.22.2021 |
|
|
-- |
-- |
Selections Sheet Signed (0) 11.22.2021 |
|
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 06.21.2022 |
Updating 6/19/2022 |
|
-- |
-- |
Deposit For Upgrades Received (0) 11.30.2021 |
$1,531.25 |
|
-- |
-- |
Building Permit (30) 01.10.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 03.31.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 03.31.2022 |
|
|
-- |
-- |
Stake Out Home (1) 12.14.2021 |
|
|
-- |
-- |
Excavate (2) 01.17.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 01.17.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 01.17.2022 |
|
|
-- |
-- |
Set Forms (2) 02.10.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 02.10.2022 |
|
|
-- |
-- |
Plumb Slab (2) 02.24.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 03.13.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1) 03.13.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 03.13.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.07.2022 |
|
|
-- |
-- |
Pour Slab (1) * 03.13.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 04.27.2022 |
|
|
-- |
-- |
Framing I (9) 03.24.2022 |
|
|
-- |
-- |
Order Steps (0) 04.11.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 03.31.2022 |
|
|
-- |
-- |
Framing II (8) 03.31.2022 |
|
|
-- |
-- |
Framing III (8) * 04.04.2022 |
|
|
-- |
-- |
Install Stairs (0) 04.11.2022 |
|
|
-- |
-- |
Windows & Doors (0) 05.15.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 05.30.2022 |
|
|
-- |
-- |
Roofing (0) 05.02.2022 |
|
|
-- |
-- |
Order Cabinets (0) 01.31.2022 |
|
|
-- |
-- |
Order Appliances (0) 05.16.2022 |
Standard |
|
-- |
-- |
Deck (0) 05.30.2022 |
STANDARD |
|
-- |
-- |
Gutters (0) 07.16.2022 |
|
|
-- |
-- |
Driveway (0) 07.20.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 02.14.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 08.20.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 08.28.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 05.04.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 05.25.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 05.15.2022 |
Black Plumbing. In process 5/11. Done by Friday. |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.07.2022 |
|
|
-- |
-- |
Electric Rough In (4) 05.21.2022 |
Black Lighting |
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 09.07.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 09.07.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 06.25.2022 |
|
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 05.26.2022 |
In process 5/25 |
|
-- |
-- |
Inspection (Insulation) (1) 06.05.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 07.25.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 03.13.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 09.07.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 05.16.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 06.05.2022 |
|
|
-- |
-- |
Loan Approval (0) 07.28.2022 |
|
|
-- |
-- |
Deed Preparation (0) 04.27.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 06.25.2022 |
In process 6/19 |
|
-- |
-- |
Paint 1 (1) 06.29.2022 |
In process6/29 |
|
-- |
-- |
Garage Door (0) 07.16.2022 |
|
|
-- |
-- |
House Numbers (0) 07.16.2022 |
|
|
-- |
-- |
Mailbox (0) 08.11.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 06.25.2022 |
|
|
-- |
-- |
Granite Installation (1) * 07.21.2022 |
In process 7/20 |
|
-- |
-- |
Interior Trim - Install (3) 07.23.2022 |
Needs painting 7/20 |
|
-- |
-- |
Interior Trim - Paint (1) 02.14.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 08.20.2022 |
In process 8/17 |
|
-- |
-- |
Luxury Vinyl Tile (0) 08.20.2022 |
In process 8/17 |
|
-- |
-- |
Paint 2 (3) 08.03.2022 |
|
|
-- |
-- |
Cover Floors (1) 08.24.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 07.28.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 08.28.2022 |
In process 8/17 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 08.24.2022 |
Black accessories. In process 8/17. Still needs a lot done 8/20 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 08.24.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 07.28.2022 |
|
|
-- |
-- |
Set Water Meter (0) 08.04.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 08.24.2022 |
In process 8/20 |
|
-- |
-- |
Ceiling Fans (0) 08.24.2022 |
Living Room |
|
-- |
-- |
HVAC Trim Out (1) 08.14.2022 |
Heat Pump Set 7/10 |
|
-- |
-- |
Plumbing Trim Out (2) 08.25.2022 |
Upstairs toilets needed 8/20 |
|
-- |
-- |
Install Appliances (0) * 08.20.2022 |
|
|
-- |
-- |
Paint 3 (2) * 08.03.2022 |
|
|
-- |
-- |
Carpet (2) 08.20.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 09.01.2022 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 09.01.2022 |
Reinspect Mon, Aug 29 |
|
-- |
-- |
Pre Walk Through (0) 08.31.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 09.01.2022 |
In process both sets 8/31 |
|
-- |
-- |
Cleaning (1) 09.04.2022 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 09.01.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 09.01.2022 |
|
|
-- |
-- |
Schedule Closing (0) 09.01.2022 |
|
|
-- |
-- |
Buyer Walk Through (1) 09.04.2022 |
Friday, Sep 2, 10AM |
|
-- |
-- |
Payment for Upgrades (0) 08.19.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 09.01.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 09.08.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 07.26.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 08.11.2022 |
|
|
-- |
-- |
Closing (1) 09.08.2022 |
Brittany @ West View Title, Sep 7 at 10AM |
|
-- |
-- |
Remove Coded Lockbox (0) 09.15.2022 |
|
|