Fri |
Sep 20 |
Verify Window & Roof Structure (0)
|
|
|
Fri |
Sep 20 |
Rough In Microwave Vent (0)
|
|
|
Fri |
Sep 20 |
Order Plumbing / Lighting Fixtures (0)
|
|
|
Fri |
Sep 20 |
Blower Door Test (1)
|
|
|
|
-- |
-- |
Cover stairs 4/24 |
|
|
-- |
-- |
Cover stairs 4/24 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Expanded patio? |
|
|
-- |
-- |
Basement drain sticking out of wall |
radon pipe - Tom |
|
-- |
-- |
Painted steps upgrade? |
|
|
-- |
-- |
Three roll out trays… |
One is missing, Kate will follow up |
|
-- |
-- |
One kitchen handle missing |
Kate will follow up |
|
-- |
-- |
Painted cabinet upgrade? |
|
|
-- |
-- |
Granite size ok? |
sizing issue. Awaiting to hear back from Greg. |
|
-- |
-- |
Paint 1 |
|
|
-- |
-- |
Fix hardwood tread cover |
|
|
-- |
-- |
Missing one shower wall |
|
|
-- |
-- |
|
|
|
-- |
-- |
Missing fan cover? Broken? |
Jill to ask electrician |
|
-- |
-- |
Screw covers at front door and French doors |
Jill |
|
-- |
-- |
Drywall repair at three light switch in kitchen |
Drywaller |
|
-- |
-- |
French door not closing correctly |
Tom |
|
-- |
-- |
Missing shoe mold on right side of landing |
Trim |
|
-- |
-- |
Show needed whole upstairs |
Shoe moulding trim |
|
-- |
-- |
Big paint touch ups in all bedrooms at baseboards |
Painter |
|
-- |
-- |
Big paint touch ups in all bedrooms at baseboards |
|
|
-- |
-- |
Closet door needed basement |
Needs painting, painter |
|
-- |
-- |
Wood in basement? |
Tom |
|
-- |
-- |
CODED LOCKBOX 0125 |
|
|
-- |
-- |
Garage trim needed |
Trim guy |
|
-- |
-- |
Cabinet trim needed |
Jill will check for material |
|
-- |
-- |
Finish weatherstripping |
Jill |
|
-- |
-- |
Touch up paint |
Painter-in process 8/31 |
|
-- |
-- |
Screens |
Jill |
|
-- |
-- |
Gaps in stairs. Maker sure painters caulk |
Painter |
|
-- |
-- |
Clean out garage |
|
|
-- |
-- |
Need black drain in master shower |
Jill |
|
-- |
-- |
Weatherstripping at the front door |
|
|
-- |
-- |
Final clean of all floors and surfaces |
|
|
-- |
-- |
Chip near the deadbolt on French door |
Painter |
|
-- |
-- |
Remove sticker from the back of the island |
Jill |
|
-- |
-- |
Replace a cracked receptacle in Dining room |
Switch faceplate |
|
-- |
-- |
Replace brushed nickel drain with black drain in the master shower |
|
|
-- |
-- |
Sand and repaint nearest strip in between second and third bedroom |
|
|
-- |
-- |
Hinge pin missing hall bathroom door |
Jill |
|
-- |
-- |
Remove block behind the bonus bathroom door, right floor |
Tom |
|
-- |
-- |
Clean off back patio and deck |
Jill |
|
-- |
-- |
Mop bonus room floor |
Jill |
|
-- |
-- |
Garage painting and trim |
|
|
-- |
-- |
Install pen self closing garage door |
Waiting on pins |
|
-- |
-- |
Address the double trashcan that does not close |
Tom |
|
-- |
-- |
Ice maker? |
|
|
-- |
-- |
Ratified Contract? (0)
11.21.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0)
11.21.2021 |
|
|
-- |
-- |
Association Packet Requested (0)
11.21.2021 |
|
|
-- |
-- |
Association Packet Received (0)
11.21.2021 |
|
|
-- |
-- |
Selections Meeting (0)
11.22.2021 |
|
|
-- |
-- |
Selections Sheet Signed (0)
11.22.2021 |
|
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
06.21.2022 |
Updating 6/19/2022 |
|
-- |
-- |
Deposit For Upgrades Received (0)
11.30.2021 |
$1,531.25 |
|
-- |
-- |
Building Permit (30)
01.10.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
03.31.2022 |
|
|
-- |
-- |
Order Windows & Doors (0)
03.31.2022 |
|
|
-- |
-- |
Stake Out Home (1)
12.14.2021 |
|
|
-- |
-- |
Excavate (2)
01.17.2022 |
|
|
-- |
-- |
Inspection (Footers) (1)
01.17.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
09.07.2022 |
|
|
-- |
-- |
Pour Footers (1)
01.17.2022 |
|
|
-- |
-- |
Set Forms (2)
02.10.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1)
02.10.2022 |
|
|
-- |
-- |
Plumb Slab (2)
02.24.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
03.13.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1)
03.13.2022 |
|
|
-- |
-- |
Inspection (Slab) (1)
03.13.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
09.07.2022 |
|
|
-- |
-- |
Pour Slab (1)
03.13.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
04.27.2022 |
|
|
-- |
-- |
Framing I (9)
03.24.2022 |
|
|
-- |
-- |
Order Steps (0)
04.11.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0)
03.31.2022 |
|
|
-- |
-- |
Framing II (8)
03.31.2022 |
|
|
-- |
-- |
Framing III (8)
04.04.2022 |
|
|
-- |
-- |
Install Stairs (0)
04.11.2022 |
|
|
-- |
-- |
Windows & Doors (0)
05.15.2022 |
|
|
-- |
-- |
House Number and Status in Window (0)
05.30.2022 |
|
|
-- |
-- |
Roofing (0)
05.02.2022 |
|
|
-- |
-- |
Order Cabinets (0)
01.31.2022 |
|
|
-- |
-- |
Order Appliances (0)
05.16.2022 |
Standard |
|
-- |
-- |
Deck (0)
05.30.2022 |
STANDARD |
|
-- |
-- |
Gutters (0)
07.16.2022 |
|
|
-- |
-- |
Driveway (0)
07.20.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0)
02.14.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0)
08.20.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
08.28.2022 |
|
|
-- |
-- |
HVAC Rough In (4)
05.04.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
05.25.2022 |
|
|
-- |
-- |
Plumbing Rough In (4)
05.15.2022 |
Black Plumbing. In process 5/11. Done by Friday. |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
09.07.2022 |
|
|
-- |
-- |
Electric Rough In (4)
05.21.2022 |
Black Lighting |
|
-- |
-- |
Inspection (Rough In Electric) (1)
09.07.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
09.07.2022 |
|
|
-- |
-- |
Inspection (Framing) (1)
09.07.2022 |
|
|
-- |
-- |
Exterior Vinyl (0)
06.25.2022 |
|
|
-- |
-- |
Exterior Stone (0)
04.14.2022 |
|
|
-- |
-- |
Insulation (2)
05.26.2022 |
In process 5/25 |
|
-- |
-- |
Inspection (Insulation) (1)
06.05.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
07.25.2022 |
|
|
-- |
-- |
Set Electric Meter (0)
04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
03.13.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
09.07.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
05.16.2022 |
|
|
-- |
-- |
Drywall (Hang) (4)
06.05.2022 |
|
|
-- |
-- |
Loan Approval (0)
07.28.2022 |
|
|
-- |
-- |
Deed Preparation (0)
04.27.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
06.25.2022 |
In process 6/19 |
|
-- |
-- |
Paint 1 (1)
06.29.2022 |
In process6/29 |
|
-- |
-- |
Garage Door (0)
07.16.2022 |
|
|
-- |
-- |
House Numbers (0)
07.16.2022 |
|
|
-- |
-- |
Mailbox (0)
08.11.2022 |
|
|
-- |
-- |
Cabinet Installation (2)
06.25.2022 |
|
|
-- |
-- |
Granite Installation (1)
07.21.2022 |
In process 7/20 |
|
-- |
-- |
Interior Trim - Install (3)
07.23.2022 |
Needs painting 7/20 |
|
-- |
-- |
Interior Trim - Paint (1)
02.14.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
08.20.2022 |
In process 8/17 |
|
-- |
-- |
Luxury Vinyl Tile (0)
08.20.2022 |
In process 8/17 |
|
-- |
-- |
Paint 2 (3)
08.03.2022 |
|
|
-- |
-- |
Cover Floors (1)
08.24.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
07.28.2022 |
|
|
-- |
-- |
Shoe Moulding (0)
08.28.2022 |
In process 8/17 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
08.24.2022 |
Black accessories. In process 8/17. Still needs a lot done 8/20 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
08.24.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
07.28.2022 |
|
|
-- |
-- |
Set Water Meter (0)
08.04.2022 |
|
|
-- |
-- |
Electric Trim Out (3)
08.24.2022 |
In process 8/20 |
|
-- |
-- |
Ceiling Fans (0)
08.24.2022 |
Living Room |
|
-- |
-- |
HVAC Trim Out (1)
08.14.2022 |
Heat Pump Set 7/10 |
|
-- |
-- |
Plumbing Trim Out (2)
08.25.2022 |
Upstairs toilets needed 8/20 |
|
-- |
-- |
Install Appliances (0)
08.20.2022 |
|
|
-- |
-- |
Paint 3 (2)
08.03.2022 |
|
|
-- |
-- |
Carpet (2)
08.20.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
09.01.2022 |
|
|
-- |
-- |
Inspection (Final HVAC) (1)
09.07.2022 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1)
09.07.2022 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
09.07.2022 |
|
|
-- |
-- |
Inspection (Final Building) (2)
09.01.2022 |
Reinspect Mon, Aug 29 |
|
-- |
-- |
Pre Walk Through (0)
08.31.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
09.01.2022 |
In process both sets 8/31 |
|
-- |
-- |
Cleaning (1)
09.04.2022 |
|
|
-- |
-- |
Certificate of Occupancy (1)
09.01.2022 |
|
|
-- |
-- |
C.O. to Lender (0)
09.01.2022 |
|
|
-- |
-- |
Schedule Closing (0)
09.01.2022 |
|
|
-- |
-- |
Buyer Walk Through (1)
09.04.2022 |
Friday, Sep 2, 10AM |
|
-- |
-- |
Payment for Upgrades (0)
08.19.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
09.01.2022 |
|
|
-- |
-- |
Review Settlement Statement (0)
09.08.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
07.26.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
08.11.2022 |
|
|
-- |
-- |
Closing (1)
09.08.2022 |
Brittany @ West View Title, Sep 7 at 10AM |
|
-- |
-- |
Remove Coded Lockbox (0)
09.15.2022 |
|
|