Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Loan Officer = Jeanne Seils, SECU, Jeanne.seils@secumd.com |
|
|
-- |
-- |
Cover hardwood treads |
|
|
-- |
-- |
Door repair to master bath |
Drywaller |
|
-- |
-- |
Missing shower panel |
Mon, Aug 15 |
|
-- |
-- |
Drywall patch above garage door |
|
|
-- |
-- |
Shower door on site 8/14 |
Mon, Aug 22 |
|
-- |
-- |
Install shelving under stairs closet |
|
|
-- |
-- |
CODED LOCKBOX 0126 |
|
|
-- |
-- |
Coffee stain on granite |
owner cleared it off |
|
-- |
-- |
Attic cover needs installed |
Painter |
|
-- |
-- |
Install screw covers French doors |
Jill |
|
-- |
-- |
Install screw covers French doors |
|
|
-- |
-- |
Finish installing pantry shelving |
Tues, Aug 23 |
|
-- |
-- |
Powder bathroom toilet won’t flush. And it’s filled with P |
Tom-still wont flush 8/24 |
|
-- |
-- |
Wonky receptacle in powder bath by pedestal sink |
Electrician |
|
-- |
-- |
Master bedroom tray ceiling drywall touch up and sanding |
Painter |
|
-- |
-- |
Caught in between shower walls and trim near toilet in master bath |
Caulk - Painter |
|
-- |
-- |
Steps here have streaking-painters beware |
Sand and paint risers |
|
-- |
-- |
Paint touch ups |
Painter. In process 8/24 |
|
-- |
-- |
Final pantry shelving installation |
|
|
-- |
-- |
Cable cover LR needed |
2 - electrician |
|
-- |
-- |
Trim needed in garage after clean out |
|
|
-- |
-- |
Extra side splash pieces in kitchen |
|
|
-- |
-- |
Master shelving needs completed |
|
|
-- |
-- |
Clean off deck |
|
|
-- |
-- |
Caulk corner of master shower |
Painter |
|
-- |
-- |
Screens |
Jill on site just need installed 8/31 |
|
-- |
-- |
Repaint garage |
|
|
-- |
-- |
Pint touch up |
|
|
-- |
-- |
Install screens |
|
|
-- |
-- |
clean around windows |
|
|
-- |
-- |
Adjust water pressure |
Jill |
|
-- |
-- |
adjust closet doors |
I think ok 9/4? |
|
-- |
-- |
Robe hooks upstairs baths |
Just Master Bath 9/4 |
|
-- |
-- |
wash off deck |
|
|
-- |
-- |
Secure carpet at top of stairs (look at subfloor) |
Denny-i think repaired 9/4? |
|
-- |
-- |
Adjust French door |
Tom-basement door deadbolt |
|
-- |
-- |
Chip in cabinet door above fridge |
Jill |
|
-- |
-- |
powder bath toilet slow flush |
Plumber-toilet is still odd 9/4 |
|
-- |
-- |
water not working in fridger |
CJ |
|
-- |
-- |
Paint garage walls |
|
|
-- |
-- |
weather stripping garage door |
Jill |
|
-- |
-- |
remove stickers from upstairs windows |
Tom |
|
-- |
-- |
Top nosing of first set of steps need replaced |
waiting to hear from the buyers |
|
-- |
-- |
Ratified Contract? (0) 11.21.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Requested (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Received (0) 11.21.2021 |
|
|
-- |
-- |
Selections Meeting (0) 12.07.2021 |
|
|
-- |
-- |
Selections Sheet Signed (0) 12.08.2021 |
12/7/2021: sent to Serge for buyer signature |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 06.02.2022 |
12/11/2021: waiting on signature from Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 12.11.2021 |
12/8/2021: waiting on deposit check from buyers |
|
-- |
-- |
Building Permit (30) 01.10.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 03.31.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 03.31.2022 |
|
|
-- |
-- |
Stake Out Home (1) 12.14.2021 |
|
|
-- |
-- |
Excavate (2) 01.17.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 01.17.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 01.17.2022 |
|
|
-- |
-- |
Set Forms (2) 02.10.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 02.10.2022 |
|
|
-- |
-- |
Plumb Slab (2) 02.24.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 03.13.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1) 03.13.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 03.13.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.07.2022 |
|
|
-- |
-- |
Pour Slab (1) * 03.13.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 04.27.2022 |
Sara at West View Title |
|
-- |
-- |
Framing I (9) 03.24.2022 |
|
|
-- |
-- |
Order Steps (0) 04.11.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 04.28.2022 |
ONYX SHOWER WALLS |
|
-- |
-- |
Framing II (8) 03.31.2022 |
|
|
-- |
-- |
Framing III (8) * 04.04.2022 |
|
|
-- |
-- |
Install Stairs (0) 04.11.2022 |
|
|
-- |
-- |
Windows & Doors (0) 05.19.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 05.30.2022 |
|
|
-- |
-- |
Roofing (0) 05.02.2022 |
|
|
-- |
-- |
Order Cabinets (0) 01.31.2022 |
|
|
-- |
-- |
Order Appliances (0) 05.16.2022 |
Standard |
|
-- |
-- |
Deck (0) 05.30.2022 |
Expanded Deck 12 x 12 |
|
-- |
-- |
Gutters (0) 07.03.2022 |
|
|
-- |
-- |
Driveway (0) 07.23.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 02.14.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 08.20.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 08.28.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 04.27.2022 |
In process4/20 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 05.21.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 05.11.2022 |
In process 5/8 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.07.2022 |
|
|
-- |
-- |
Electric Rough In (4) 05.19.2022 |
In process 5/18 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 09.07.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 09.07.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 06.25.2022 |
|
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 05.21.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 05.25.2022 |
5/24 |
|
-- |
-- |
Inspection (Electric Service) (0) 07.25.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 03.13.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 09.07.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 05.16.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 05.30.2022 |
|
|
-- |
-- |
Loan Approval (0) 12.27.2021 |
|
|
-- |
-- |
Deed Preparation (0) 04.27.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 06.12.2022 |
In process6/5 |
|
-- |
-- |
Paint 1 (1) 06.18.2022 |
|
|
-- |
-- |
Garage Door (0) 07.03.2022 |
|
|
-- |
-- |
House Numbers (0) 07.16.2022 |
|
|
-- |
-- |
Mailbox (0) 08.11.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 06.25.2022 |
|
|
-- |
-- |
Granite Installation (1) * 08.03.2022 |
Tue, Jul 26. Partially installed 7/27 |
|
-- |
-- |
Interior Trim - Install (3) 07.16.2022 |
Needs painting 7/13 |
|
-- |
-- |
Interior Trim - Paint (1) 02.14.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 08.03.2022 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 08.03.2022 |
In process 7/31 |
|
-- |
-- |
Paint 2 (3) 07.31.2022 |
|
|
-- |
-- |
Cover Floors (1) 08.07.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 07.28.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 08.10.2022 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 08.14.2022 |
Black accessories, shower door black trim. In process 8/10 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 08.15.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 07.28.2022 |
|
|
-- |
-- |
Set Water Meter (0) 08.04.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 08.14.2022 |
Black Lighting. In process 8/10 |
|
-- |
-- |
Ceiling Fans (0) 08.10.2022 |
|
|
-- |
-- |
HVAC Trim Out (1) 08.10.2022 |
Heat Pump Set 7/10 |
|
-- |
-- |
Plumbing Trim Out (2) 08.10.2022 |
Black Standard. In process 8/7 |
|
-- |
-- |
Install Appliances (0) * 08.14.2022 |
|
|
-- |
-- |
Paint 3 (2) * 07.31.2022 |
|
|
-- |
-- |
Carpet (2) 08.24.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 09.15.2022 |
Tell Shawanna when to submit the request |
|
-- |
-- |
Inspection (Final HVAC) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 08.26.2022 |
Reinspect 8/25 |
|
-- |
-- |
Pre Walk Through (0) 08.22.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 08.28.2022 |
|
|
-- |
-- |
Cleaning (1) 08.31.2022 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 08.27.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 08.27.2022 |
|
|
-- |
-- |
Schedule Closing (0) 09.15.2022 |
|
|
-- |
-- |
Buyer Walk Through (1) 09.01.2022 |
Tuesday, Aug 30-Wednesday |
|
-- |
-- |
Payment for Upgrades (0) 08.19.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 08.19.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 09.15.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 09.03.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 08.11.2022 |
|
|
-- |
-- |
Closing (1) 09.15.2022 |
Brittany @ West View Title, Sep 14? |
|
-- |
-- |
Remove Coded Lockbox (0) 09.15.2022 |
|
|