Fri |
Sep 20 |
Verify Window & Roof Structure (0)
|
|
|
Fri |
Sep 20 |
Rough In Microwave Vent (0)
|
|
|
Fri |
Sep 20 |
Order Plumbing / Lighting Fixtures (0)
|
|
|
Fri |
Sep 20 |
Blower Door Test (1)
|
|
|
|
-- |
-- |
Soaked Insulation in Living Room |
|
|
-- |
-- |
Does back basement wall need framing? |
|
|
-- |
-- |
Reason why sheet of drywall is missing in master bed? |
|
|
-- |
-- |
Drywallers need to sweep up |
|
|
-- |
-- |
Finish panel in MB |
In process 9/7 |
|
-- |
-- |
Hardware and bottom cabinet pieces on hall and MB vanities |
|
|
-- |
-- |
Kitchen hardware needed |
And bath |
|
-- |
-- |
Few drawers need adjustments (master bath and 3-drawer stack) |
Tom |
|
-- |
-- |
Busted cabinet-likely needs re-ordered |
Pantry door, Tom will get it installed |
|
-- |
-- |
Does MB drywall spot need sanding? Painters seem to be avoiding it? |
|
|
-- |
-- |
Piece of missing siding at dormer |
|
|
-- |
-- |
Missing handle on broken cabinet. FYI. |
|
|
-- |
-- |
RATE LOCK EXPIRES 11/3/2022 |
|
|
-- |
-- |
Confirm ceiling fan junction box? |
In living room |
|
-- |
-- |
Trim garage |
Edgar |
|
-- |
-- |
Few handles needed 10/12 |
|
|
-- |
-- |
Attic cover needed |
Needs painting |
|
-- |
-- |
Install screens |
Jill-remove extras |
|
-- |
-- |
Coded lockbox 1313 |
|
|
-- |
-- |
Handle needed on replaced cabinet |
Cabinetry pantry door, Tom will coordinate |
|
-- |
-- |
Push oven into place |
Hitting electrical receptacle |
|
-- |
-- |
Powder bath receptacle cover needed |
Upstairs bath also |
|
-- |
-- |
All mirrors needed 10/19 |
And shower rods |
|
-- |
-- |
Fill master bath gap between wall and vanity |
Painter |
|
-- |
-- |
Put fallen insulation back in place |
Tom will coordinate |
|
-- |
-- |
Remove extra fan in living room |
|
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Remove silver sticker from front window |
On the outside PVC trim board |
|
-- |
-- |
sell buyer fan and add another for 2nd and 3 rd bedroom |
Kate needs this note? |
|
-- |
-- |
Install patio screen |
|
|
-- |
-- |
sweep off back patio/power wash |
Jill |
|
-- |
-- |
adjust middle drawer in kitchen next to fridge |
Kate told Fred |
|
-- |
-- |
back door adjust |
painter - touch up |
|
-- |
-- |
replace air return top of stairs |
|
|
-- |
-- |
Kitchen window screen needed |
Jill |
|
-- |
-- |
Living room window/adjust/replace |
|
|
-- |
-- |
Upper right cabinet door left of fridge is warped- order new |
11/28: we have the door, Tom will coordinate install |
|
-- |
-- |
clip broken upstairs bedroom window |
|
|
-- |
-- |
adjust closet doors |
Jill. Smaller bedroom |
|
-- |
-- |
Paint touch up throughout and at ceiling around light fixtures |
Painter |
|
-- |
-- |
change out living room ceiling fan |
|
|
-- |
-- |
Correct/Clean up leak in basement |
Tom - wrap with aluminum |
|
-- |
-- |
$128 for ceiling fan |
To be collected at closing |
|
-- |
-- |
Paint back patio door |
Monday Jan 9 |
|
-- |
-- |
Cabinet door is in 21 that needs replacing |
Tom - we have it now |
|
-- |
-- |
Ratified Contract? (0)
12.11.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0)
12.11.2021 |
|
|
-- |
-- |
Association Packet Requested (0)
12.11.2021 |
|
|
-- |
-- |
Association Packet Received (0)
12.15.2021 |
|
|
-- |
-- |
Selections Meeting (0)
01.07.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0)
01.11.2022 |
1/7/2022: sent to Katherine for buyer signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
01.13.2022 |
1/12/2022: sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0)
01.12.2022 |
|
|
-- |
-- |
Building Permit (30)
01.12.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
05.02.2022 |
|
|
-- |
-- |
Order Windows & Doors (0)
05.02.2022 |
|
|
-- |
-- |
Stake Out Home (1)
02.24.2022 |
|
|
-- |
-- |
Excavate (2)
03.07.2022 |
|
|
-- |
-- |
Inspection (Footers) (1)
03.07.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
09.07.2022 |
|
|
-- |
-- |
Pour Footers (1)
03.07.2022 |
|
|
-- |
-- |
Set Forms (2)
03.24.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1)
03.28.2022 |
|
|
-- |
-- |
Plumb Slab (2)
04.19.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
04.21.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1)
04.25.2022 |
|
|
-- |
-- |
Inspection (Slab) (1)
05.02.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
09.07.2022 |
|
|
-- |
-- |
Pour Slab (1)
05.12.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
01.14.2022 |
|
|
-- |
-- |
Framing I (9)
05.26.2022 |
|
|
-- |
-- |
Order Steps (0)
06.18.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0)
06.20.2022 |
|
|
-- |
-- |
Framing II (8)
06.02.2022 |
|
|
-- |
-- |
Framing III (8)
06.05.2022 |
|
|
-- |
-- |
Install Stairs (0)
06.25.2022 |
|
|
-- |
-- |
Windows & Doors (0)
06.25.2022 |
|
|
-- |
-- |
House Number and Status in Window (0)
07.07.2022 |
|
|
-- |
-- |
Roofing (0)
07.28.2022 |
|
|
-- |
-- |
Order Cabinets (0)
07.11.2022 |
|
|
-- |
-- |
Order Appliances (0)
08.30.2022 |
Standard |
|
-- |
-- |
Deck (0)
04.23.2022 |
n/a |
|
-- |
-- |
Gutters (0)
10.05.2022 |
|
|
-- |
-- |
Driveway (0)
09.17.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0)
10.11.2022 |
|
|
-- |
-- |
Privacy Divider / Fence (0)
09.17.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
10.19.2022 |
|
|
-- |
-- |
HVAC Rough In (4)
06.25.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
08.03.2022 |
|
|
-- |
-- |
Plumbing Rough In (4)
07.16.2022 |
In process 7/13 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
09.07.2022 |
|
|
-- |
-- |
Electric Rough In (4)
07.28.2022 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1)
09.07.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
09.07.2022 |
|
|
-- |
-- |
Inspection (Framing) (1)
09.07.2022 |
|
|
-- |
-- |
Exterior Vinyl (0)
09.21.2022 |
in process 9/11 |
|
-- |
-- |
Exterior Stone (0)
04.14.2022 |
|
|
-- |
-- |
Insulation (2)
08.03.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1)
08.04.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
10.03.2022 |
|
|
-- |
-- |
Set Electric Meter (0)
04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
05.12.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
09.08.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
08.04.2022 |
|
|
-- |
-- |
Drywall (Hang) (4)
08.07.2022 |
NONE |
|
-- |
-- |
Loan Approval (0)
10.10.2022 |
|
|
-- |
-- |
Deed Preparation (0)
04.27.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
08.24.2022 |
In process 8/20 |
|
-- |
-- |
Paint 1 (1)
08.24.2022 |
|
|
-- |
-- |
Garage Door (0)
09.28.2022 |
|
|
-- |
-- |
House Numbers (0)
10.05.2022 |
|
|
-- |
-- |
Mailbox (0)
09.29.2022 |
|
|
-- |
-- |
Cabinet Installation (2)
08.31.2022 |
On site 8/24 Wednesday 8/31 |
|
-- |
-- |
Granite Installation (1)
09.17.2022 |
By Friday, Sep 16 |
|
-- |
-- |
Interior Trim - Install (3)
09.21.2022 |
Needs painting 9/17 |
|
-- |
-- |
Interior Trim - Paint (1)
10.26.2022 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
10.08.2022 |
In process 10/5 |
|
-- |
-- |
Luxury Vinyl Tile (0)
10.10.2022 |
In process 10/5 |
|
-- |
-- |
Paint 2 (3)
10.05.2022 |
In process10/2 |
|
-- |
-- |
Cover Floors (1)
10.12.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
09.19.2022 |
|
|
-- |
-- |
Shoe Moulding (0)
10.15.2022 |
In process 10/12 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
10.19.2022 |
Black accessories. In process 10/15. Handles on. Needmirrorsandshelving |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
10.15.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
09.19.2022 |
|
|
-- |
-- |
Set Water Meter (0)
09.29.2022 |
|
|
-- |
-- |
Electric Trim Out (3)
10.12.2022 |
Black Lighting. Started 10/8 |
|
-- |
-- |
Ceiling Fans (0)
10.12.2022 |
Living Room |
|
-- |
-- |
HVAC Trim Out (1)
10.10.2022 |
|
|
-- |
-- |
Plumbing Trim Out (2)
10.12.2022 |
Black Standard |
|
-- |
-- |
Install Appliances (0)
10.15.2022 |
|
|
-- |
-- |
Paint 3 (2)
10.05.2022 |
|
|
-- |
-- |
Carpet (2)
10.10.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
10.27.2022 |
|
|
-- |
-- |
Inspection (Final HVAC) (1)
10.17.2022 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1)
10.17.2022 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
10.17.2022 |
|
|
-- |
-- |
Inspection (Final Building) (2)
10.17.2022 |
Fri, Oct 14 |
|
-- |
-- |
Pre Walk Through (0)
10.20.2022 |
Kate |
|
-- |
-- |
Stain Hardwood Stairs (1)
10.22.2022 |
In process 10/19 |
|
-- |
-- |
Cleaning (1)
10.24.2022 |
In process 10/22 |
|
-- |
-- |
Certificate of Occupancy (1)
10.17.2022 |
|
|
-- |
-- |
C.O. to Lender (0)
10.17.2022 |
|
|
-- |
-- |
Schedule Closing (0)
10.21.2022 |
|
|
-- |
-- |
Buyer Walk Through (1)
10.27.2022 |
Monday 10/24 at 12:15 PM |
|
-- |
-- |
Payment for Upgrades (0)
10.17.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
10.17.2022 |
|
|
-- |
-- |
Review Settlement Statement (0)
10.13.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
10.13.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
10.20.2022 |
|
|
-- |
-- |
Closing (1)
11.02.2022 |
Brittany @ West View Title, Mon, 10/31 at 2PM |
|
-- |
-- |
Remove Coded Lockbox (0)
11.17.2022 |
|
|