Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Broken front window 9/11 |
|
|
-- |
-- |
Name Amendment |
|
|
-- |
-- |
Broken front window |
We have the sash |
|
-- |
-- |
Trim garage |
Edgar after garage is emptied |
|
-- |
-- |
Knobs for basement vanity in? |
|
|
-- |
-- |
Basement bath trim out |
Said will be completed today |
|
-- |
-- |
Drywall repairs up bedroom |
Painter? |
|
-- |
-- |
Few lightbulbs needed |
Jill |
|
-- |
-- |
Dent in fridge |
Part is on order as of 11/3 (CJ?) |
|
-- |
-- |
Home Inspection, Tuesday, Nov 1, 1PM |
|
|
-- |
-- |
Touch up basement bath drywall |
Painter |
|
-- |
-- |
Exterior door has messy insulation? |
|
|
-- |
-- |
Small drywall hole powder bath |
Painter |
|
-- |
-- |
Finish sanding/painting in bedroom |
Painter |
|
-- |
-- |
CODED LOCLBOX 1515 |
|
|
-- |
-- |
Patio door - glue to be trimmed off |
by painter before painting. Not completed 12/4 |
|
-- |
-- |
Garage door opener? Ok? |
|
|
-- |
-- |
Snap light ok in bonus room? |
On site. Needs installed. |
|
-- |
-- |
Bath light fixture slightly crooked |
Basement |
|
-- |
-- |
Install master bth shower rod |
Joe |
|
-- |
-- |
Home inspection in process 11/5 |
|
|
-- |
-- |
Clean out track of screen door |
Tom - Door wont close 11/12 |
|
-- |
-- |
Install missing screens |
Jill - on order as of 11/14, in as of 2/23 |
|
-- |
-- |
Install missing HVAC register cover |
Jill |
|
-- |
-- |
Clean tubs |
|
|
-- |
-- |
Move garage door opener, replace light switch cover |
Greg |
|
-- |
-- |
Drywall touch up |
|
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Creaky floor at top of steps on main level |
|
|
-- |
-- |
Damaged skin on side of kitchen island |
Jill and Kate will look at it |
|
-- |
-- |
Touch up front door paint |
Painter |
|
-- |
-- |
Glue on top stairs transition strip |
Jill will coordinate |
|
-- |
-- |
Gouges in hardwood treads |
Jill and Kate will look at it |
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
Utility room door needed 11/9 |
We have the door |
|
-- |
-- |
Missing weather stripping 11/9 garage door |
Jill |
|
-- |
-- |
Box of flooring in 15 labeled for 16 |
|
|
-- |
-- |
Install shoe molding from floorrepair |
Henry - possibly 11/17 |
|
-- |
-- |
|
|
|
-- |
-- |
Paint back patio door |
Jill - cut off glue |
|
-- |
-- |
Door knob on utility room door |
Joe |
|
-- |
-- |
Ratified Contract? (0) 01.07.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 01.10.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 01.07.2022 |
1/7/2022: requested |
|
-- |
-- |
Association Packet Received (0) 01.15.2022 |
1/7/2022: requested |
|
-- |
-- |
Selections Meeting (0) 01.18.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 01.19.2022 |
1/18/2022: sent to Katie for buyer signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 01.21.2022 |
1/20/2022: sent to Jerry for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0) 01.21.2022 |
|
|
-- |
-- |
Building Permit (30) 01.12.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 05.02.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 05.02.2022 |
|
|
-- |
-- |
Stake Out Home (1) 02.24.2022 |
|
|
-- |
-- |
Excavate (2) 03.07.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 03.07.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 03.07.2022 |
|
|
-- |
-- |
Set Forms (2) 03.24.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 03.28.2022 |
|
|
-- |
-- |
Plumb Slab (2) 04.19.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 04.21.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1) 04.25.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 05.02.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.07.2022 |
|
|
-- |
-- |
Pour Slab (1) * 05.12.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.11.2022 |
|
|
-- |
-- |
Framing I (9) 05.26.2022 |
|
|
-- |
-- |
Order Steps (0) 06.18.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 06.20.2022 |
|
|
-- |
-- |
Framing II (8) 06.02.2022 |
|
|
-- |
-- |
Framing III (8) * 06.05.2022 |
|
|
-- |
-- |
Install Stairs (0) 06.25.2022 |
|
|
-- |
-- |
Windows & Doors (0) 06.25.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 07.07.2022 |
|
|
-- |
-- |
Roofing (0) 07.16.2022 |
|
|
-- |
-- |
Order Cabinets (0) 07.11.2022 |
|
|
-- |
-- |
Order Appliances (0) 08.30.2022 |
Standard SS |
|
-- |
-- |
Deck (0) 04.23.2022 |
n/a |
|
-- |
-- |
Gutters (0) 10.08.2022 |
|
|
-- |
-- |
Driveway (0) 09.17.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 10.11.2022 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 09.17.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 10.19.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 07.03.2022 |
In process 6/29 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 08.11.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 08.03.2022 |
In process 7/31 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.07.2022 |
|
|
-- |
-- |
Electric Rough In (4) 08.10.2022 |
In process8/7 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 09.07.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 09.07.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 09.21.2022 |
In process 8/31 |
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 08.14.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 08.18.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 09.29.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 05.12.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 09.08.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 08.04.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 08.24.2022 |
Finish Bonus Room, Bath. In process 8/20 |
|
-- |
-- |
Loan Approval (0) 02.17.2022 |
|
|
-- |
-- |
Deed Preparation (0) 09.20.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 09.14.2022 |
In process 9/11 |
|
-- |
-- |
Paint 1 (1) 09.14.2022 |
|
|
-- |
-- |
Garage Door (0) 09.28.2022 |
|
|
-- |
-- |
House Numbers (0) 10.02.2022 |
|
|
-- |
-- |
Mailbox (0) 09.29.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 09.17.2022 |
Delivery 9/13. On site 9/14 |
|
-- |
-- |
Granite Installation (1) * 09.17.2022 |
|
|
-- |
-- |
Interior Trim - Install (3) 10.02.2022 |
Needs painting 9/28 |
|
-- |
-- |
Interior Trim - Paint (1) 10.26.2022 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 10.15.2022 |
In process10/12 |
|
-- |
-- |
Luxury Vinyl Tile (0) 10.15.2022 |
|
|
-- |
-- |
Paint 2 (3) 10.08.2022 |
|
|
-- |
-- |
Cover Floors (1) 10.29.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 09.19.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 10.19.2022 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 10.29.2022 |
Black accessories, bonus room. In process 10/26. Few shelving and mirrors need installed |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 10.29.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 09.19.2022 |
|
|
-- |
-- |
Set Water Meter (0) 09.29.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 10.22.2022 |
Black Standard. Almost completed10/19 |
|
-- |
-- |
Ceiling Fans (0) 10.19.2022 |
|
|
-- |
-- |
HVAC Trim Out (1) 10.19.2022 |
|
|
-- |
-- |
Plumbing Trim Out (2) 10.19.2022 |
Black Standard |
|
-- |
-- |
Install Appliances (0) * 10.26.2022 |
|
|
-- |
-- |
Paint 3 (2) * 10.08.2022 |
|
|
-- |
-- |
Carpet (2) 10.12.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 11.03.2022 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 10.31.2022 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 10.31.2022 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 10.31.2022 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 10.31.2022 |
Fri, Oct 28 |
|
-- |
-- |
Pre Walk Through (0) 10.31.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 11.03.2022 |
In process 11/2 |
|
-- |
-- |
Cleaning (1) 11.07.2022 |
In process 11/5 |
|
-- |
-- |
Certificate of Occupancy (1) * 10.31.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 10.31.2022 |
|
|
-- |
-- |
Schedule Closing (0) 11.03.2022 |
|
|
-- |
-- |
Buyer Walk Through (1) 11.10.2022 |
Mon, Nov 7 at 1:30 PM |
|
-- |
-- |
Payment for Upgrades (0) 10.31.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 10.31.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 11.03.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 11.10.2022 |
Mon, Nov 7 at 11:30 AM |
|
-- |
-- |
Request Trash Tote From POA Manager (0) 11.03.2022 |
|
|
-- |
-- |
Closing (1) 11.10.2022 |
Kim @ Stewart Title, Nov 8 |
|
-- |
-- |
Remove Coded Lockbox (0) 01.19.2023 |
|
|