Sizing issue of kitchen island 9/17 |
|
|
-- |
-- |
Install side splash MB counter |
Tom |
|
-- |
-- |
Wrong window sash upstairs bedroom |
Tom |
|
-- |
-- |
Drywall repair needed by front door |
Drywaller - to sand |
|
-- |
-- |
Rate lock expires Nov 17 |
|
|
-- |
-- |
Bonus room light looks small |
Electrician |
|
-- |
-- |
Push dishwasher into place |
& hook up (cabinet guy will fix) |
|
-- |
-- |
POWDER bath mirror needed |
|
|
-- |
-- |
Need all mirrors and shower rods |
Shower rod in. Need all mirrors 11/2 |
|
-- |
-- |
Touch up light switch and front door frame |
Drywaller |
|
-- |
-- |
Trim garage |
Edgar |
|
-- |
-- |
Utility room needs a door |
Edgar - Tom |
|
-- |
-- |
Move garage door opener to inside of garage |
Davenport |
|
-- |
-- |
Home Inspection, Wednesday, November 2 |
|
|
-- |
-- |
Touch up shoe molding |
Painter |
|
-- |
-- |
Attic cover |
Painter |
|
-- |
-- |
HVAC vent needed in kitchen |
|
|
-- |
-- |
Keys? |
|
|
-- |
-- |
screw covers in French door and front door |
Jill |
|
-- |
-- |
drywall hole- front door switch plate |
|
|
-- |
-- |
drywall hole- hall bath vanity light |
|
|
-- |
-- |
drywall hole- hall bath switch plate |
|
|
-- |
-- |
caulk in front of tubs/showers |
Painter |
|
-- |
-- |
Heat pump iced over |
Clem on site 11/7 |
|
-- |
-- |
Siding in contact with the ground |
Greg |
|
-- |
-- |
Paint exterior trim |
|
|
-- |
-- |
Plumbing line leaking at kitchen sink |
|
|
-- |
-- |
Corner trim missing at kitchen island |
Tom will coordinate. Trim is in foyer-needs installed 11/9 |
|
-- |
-- |
Paint touch up |
Painter |
|
-- |
-- |
Replace trim around laundry valves |
Tom |
|
-- |
-- |
Add silicone at stove top |
CJ |
|
-- |
-- |
Cracks in three tubs |
Jill contact Kevin |
|
-- |
-- |
Caulk in front of shoe mould in front of tubs |
Painter |
|
-- |
-- |
Light bulb in guest bathroom |
Jill |
|
-- |
-- |
Repair back of island (screw, putty) |
Jill |
|
-- |
-- |
Caulk around dryer vent cover on wall |
Painter |
|
-- |
-- |
Final cleaning |
|
|
-- |
-- |
Remove ladder, etc. |
|
|
-- |
-- |
Wants the gift basket :-) |
Kate |
|
-- |
-- |
Ratified Contract? (0) 12.04.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0) 12.08.2021 |
12/4/2021: waiting on the buyer to drop off the check |
|
-- |
-- |
Association Packet Requested (0) 12.08.2021 |
12/4/2021: requested from Kayleigh |
|
-- |
-- |
Association Packet Received (0) 12.09.2021 |
|
|
-- |
-- |
Selections Meeting (0) 12.14.2021 |
|
|
-- |
-- |
Selections Sheet Signed (0) 12.14.2021 |
12/13/2021: sent to Brad for buyer signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 12.21.2021 |
12/20/2021: sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 12.20.2021 |
|
|
-- |
-- |
Building Permit (30) 01.12.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 05.02.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 05.02.2022 |
|
|
-- |
-- |
Stake Out Home (1) 02.24.2022 |
|
|
-- |
-- |
Excavate (2) 03.07.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 03.07.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 03.07.2022 |
|
|
-- |
-- |
Set Forms (2) 03.28.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 03.28.2022 |
|
|
-- |
-- |
Plumb Slab (2) 04.19.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 04.21.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1) 04.25.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 05.02.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.07.2022 |
|
|
-- |
-- |
Pour Slab (1) * 05.12.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.07.2022 |
|
|
-- |
-- |
Framing I (9) 05.26.2022 |
|
|
-- |
-- |
Order Steps (0) 06.18.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 06.20.2022 |
|
|
-- |
-- |
Framing II (8) 06.02.2022 |
|
|
-- |
-- |
Framing III (8) * 06.05.2022 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 08.12.2024 |
|
|
-- |
-- |
Install Stairs (0) 06.25.2022 |
|
|
-- |
-- |
Windows & Doors (0) 06.25.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 07.07.2022 |
|
|
-- |
-- |
Roofing (0) 07.17.2022 |
|
|
-- |
-- |
Order Cabinets (0) 07.11.2022 |
|
|
-- |
-- |
Order Appliances (0) 08.30.2022 |
Standard |
|
-- |
-- |
Deck (0) 04.23.2022 |
n/a |
|
-- |
-- |
Gutters (0) 10.05.2022 |
|
|
-- |
-- |
Driveway (0) 09.17.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 10.11.2022 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 09.17.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 10.19.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 07.03.2022 |
In process 6/29 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 08.17.2022 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 08.12.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 08.03.2022 |
In process 7/31 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.07.2022 |
|
|
-- |
-- |
Electric Rough In (4) 08.10.2022 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 09.07.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 09.07.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 09.11.2022 |
in process 8/31 |
|
-- |
-- |
Exterior Stone (0) 10.02.2022 |
In process 9/21 |
|
-- |
-- |
Insulation (2) 08.17.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 08.18.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 09.29.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 05.12.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 09.08.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 08.04.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 08.24.2022 |
Finish Bonus Room, Bath. Stocked 8/20 |
|
-- |
-- |
Loan Approval (0) 02.15.2022 |
2/14/2022 |
|
-- |
-- |
Deed Preparation (0) 10.25.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 09.14.2022 |
In process 9/11 |
|
-- |
-- |
Paint 1 (1) 09.14.2022 |
|
|
-- |
-- |
Garage Door (0) 10.05.2022 |
|
|
-- |
-- |
House Numbers (0) 10.02.2022 |
|
|
-- |
-- |
Mailbox (0) 09.29.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 09.17.2022 |
Delivery 9/13. On site 9/14 |
|
-- |
-- |
Granite Installation (1) * 09.26.2022 |
Partially complete 9/17 |
|
-- |
-- |
Interior Trim - Install (3) 10.08.2022 |
In process 10/5 needs painting. |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 08.12.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 10.26.2022 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 10.22.2022 |
In process 10/19 |
|
-- |
-- |
Luxury Vinyl Tile (0) 10.19.2022 |
|
|
-- |
-- |
Paint 2 (3) 10.15.2022 |
|
|
-- |
-- |
Cover Floors (1) 10.29.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 09.19.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 10.22.2022 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 10.29.2022 |
Black accessories, Bonus bath. In process 10/26 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 11.05.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 09.19.2022 |
|
|
-- |
-- |
Set Water Meter (0) 09.29.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 10.29.2022 |
Black Lighting. In process 10/26 |
|
-- |
-- |
Ceiling Fans (0) 10.26.2022 |
|
|
-- |
-- |
HVAC Trim Out (1) 10.26.2022 |
|
|
-- |
-- |
Blower Door Test (1) 08.12.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2) 10.29.2022 |
Black Standard. In process 10/26 |
|
-- |
-- |
Install Appliances (0) * 10.26.2022 |
|
|
-- |
-- |
Paint 3 (2) * 10.15.2022 |
|
|
-- |
-- |
Carpet (2) 10.26.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 11.05.2022 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 11.02.2022 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 11.05.2022 |
Reinspection 11/4/22 |
|
-- |
-- |
Inspection (Final Electric) (1) 11.05.2022 |
Reinspection 11/3/22 |
|
-- |
-- |
Inspection (Final Building) (2) * 11.05.2022 |
Tues, Nov 1reinspect 11/3/22 |
|
-- |
-- |
Pre Walk Through (0) 11.03.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 11.07.2022 |
In process 11/5 |
|
-- |
-- |
Cleaning (1) 11.07.2022 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 11.05.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 11.05.2022 |
|
|
-- |
-- |
Schedule Closing (0) 11.07.2022 |
|
|
-- |
-- |
Buyer Walk Through (1) 11.07.2022 |
Monday, November 7, 8:45 AM |
|
-- |
-- |
Payment for Upgrades (0) 11.03.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 11.03.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 11.03.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 11.08.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 11.05.2022 |
|
|
-- |
-- |
Closing (1) 11.08.2022 |
Lisa @ Stewart Title |
|
-- |
-- |
Remove Coded Lockbox (0) 11.14.2022 |
|
|