Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Radon Pipe? |
|
|
-- |
-- |
Updated Selection Sheet |
|
|
-- |
-- |
Updated Amendment |
|
|
-- |
-- |
Knot broken out of stair tread |
TJ - Please fix... |
|
-- |
-- |
Framing issue basement bathroom |
Needs drywall repair |
|
-- |
-- |
Hole needs patched in closet under stairs near kitchen |
Floor - framer |
|
-- |
-- |
Powder bath plumbing ok? |
Is pipe for pedestal sink ready? |
|
-- |
-- |
Drywall repair garage around electric panel |
|
|
-- |
-- |
Garage trim bent |
|
|
-- |
-- |
24" Bonus vanity on order- to be installed upon arrival; ( hopefully right before closing) |
I think installed. Painters told me not to open door |
|
-- |
-- |
Hall closet door missing |
trim, needs to be installed |
|
-- |
-- |
Snap lights installed in bedrooms 9/17 |
Fans! |
|
-- |
-- |
Kitchen drawer handle not level |
New drawer panel is on site, Fred will schedule |
|
-- |
-- |
Swap out door hinges and handles to brushed nickel |
|
|
-- |
-- |
Master sink needs one faucet |
|
|
-- |
-- |
Replace snap light w fan in living room 9/24 |
Electrician |
|
-- |
-- |
Plumbing trim out faucet when basement vanity arrives |
??? |
|
-- |
-- |
Final paint touch up needed 9/30 |
|
|
-- |
-- |
Kitchen Island Lights need installed 9/30 |
|
|
-- |
-- |
Patch holes around garage trim |
Davenport |
|
-- |
-- |
Needs lots of paint touch up |
|
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
|
|
|
-- |
-- |
Trim bathroom |
Edgar or Henry |
|
-- |
-- |
Drywall repair living room ceiling |
Drywaller, Painter |
|
-- |
-- |
Cracking on floor in master bedroom. Denny noticed. |
Bedroom as well. He said carpet may have to be reinstalled to install wedges. |
|
-- |
-- |
Crack in bedroom door |
Swap out - Tom |
|
-- |
-- |
Larger ceiling fan needed in living room |
Electrician |
|
-- |
-- |
Trim down utility room door |
Trim off the bottom of the door - Edgar |
|
-- |
-- |
Landscaping repairs |
Pettit |
|
-- |
-- |
Amendment for fans... |
Scott |
|
-- |
-- |
Secure hand rail leading up the second tier of steps |
|
|
-- |
-- |
Shelving in master bathroom |
Hopefully Mon, Oct 10 |
|
-- |
-- |
Install attic access panel |
Painter. I think panel is in garage |
|
-- |
-- |
Install living room ceiling fan |
|
|
-- |
-- |
|
|
|
-- |
-- |
Trim down bonus room door |
Edgar |
|
-- |
-- |
Silver exterior hardware ok? |
Leave it! |
|
-- |
-- |
Caulk side splashes |
Painter |
|
-- |
-- |
CODED LOCKBOX 0120 |
|
|
-- |
-- |
PLEASE TAKE PICTURES OF KITCHEN |
|
|
-- |
-- |
Creek in floor at the top of the stairs |
Tom |
|
-- |
-- |
|
|
|
-- |
-- |
Sand ceiling in LR |
Painter |
|
-- |
-- |
Tell Scott when kitchen is complete and clean |
|
|
-- |
-- |
Shelf i |
|
|
-- |
-- |
Shelf under stairs needs installed? |
|
|
-- |
-- |
Basement bathtub drain needed |
Jill |
|
-- |
-- |
Repaint banister |
And sand, painter |
|
-- |
-- |
Get thermostat on? |
|
|
-- |
-- |
Paint touch up staircase upstairs |
Painter |
|
-- |
-- |
Scuff marks in closet on main level |
Painter |
|
-- |
-- |
trim around all doors needs attention |
Painter |
|
-- |
-- |
repaint back of front door |
Painter |
|
-- |
-- |
paint touch up throughout |
Painter |
|
-- |
-- |
sand edges of doors and repaint |
Painter |
|
-- |
-- |
all bulbs need to be daylight and match |
Jill |
|
-- |
-- |
stain in granite countertop |
Greg will try a poultice |
|
-- |
-- |
scratch on closet door at top of 1st set of stairs |
Painter |
|
-- |
-- |
resand and repaint side of ? and second set of stairs |
|
|
-- |
-- |
sand and repaint side of risers and on 2nd set of stairs |
Painter |
|
-- |
-- |
touch up ceiling above fan in master bedroom |
Painter |
|
-- |
-- |
change closet closures to brushed nickel |
Joe has them and will get them to Jill |
|
-- |
-- |
trim bottom of all bedroom doors a bit |
Edgar |
|
-- |
-- |
sand underside of railing on all stairs |
Painter |
|
-- |
-- |
Scratched kitchen floor/damaged wall |
Painter |
|
-- |
-- |
Fan in living room |
Electrician |
|
-- |
-- |
Scratched kitchen floor |
Denny can fix it |
|
-- |
-- |
|
|
|
-- |
-- |
Replace back window? |
Delivered 12/12 |
|
-- |
-- |
Ratified Contract? (0) 01.15.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 01.15.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 01.15.2022 |
|
|
-- |
-- |
Association Packet Received (0) 01.20.2022 |
1/14/2022: requested |
|
-- |
-- |
Selections Meeting (0) 01.26.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 01.31.2022 |
1/26/2022: sent to buyers for review |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 02.16.2022 |
2/14/2022: sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 02.15.2022 |
|
|
-- |
-- |
Building Permit (30) 01.12.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 05.02.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 05.03.2022 |
|
|
-- |
-- |
Stake Out Home (1) 01.27.2022 |
|
|
-- |
-- |
Excavate (2) 01.31.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.06.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 10.06.2022 |
|
|
-- |
-- |
Pour Footers (1) 01.31.2022 |
|
|
-- |
-- |
Set Forms (2) 02.10.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 02.10.2022 |
|
|
-- |
-- |
Plumb Slab (2) 03.31.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 10.06.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 10.06.2022 |
|
|
-- |
-- |
Prepare Slab (1) 03.31.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 10.06.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 10.06.2022 |
|
|
-- |
-- |
Pour Slab (1) * 03.31.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 04.23.2022 |
|
|
-- |
-- |
Framing I (9) 04.19.2022 |
|
|
-- |
-- |
Order Steps (0) 05.05.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 05.30.2022 |
|
|
-- |
-- |
Framing II (8) 04.28.2022 |
|
|
-- |
-- |
Framing III (8) * 05.16.2022 |
|
|
-- |
-- |
Install Stairs (0) 05.30.2022 |
|
|
-- |
-- |
Windows & Doors (0) 05.30.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 06.12.2022 |
|
|
-- |
-- |
Roofing (0) 05.30.2022 |
|
|
-- |
-- |
Order Cabinets (0) 07.07.2022 |
|
|
-- |
-- |
Order Appliances (0) 06.20.2022 |
Standard SS |
|
-- |
-- |
Deck (0) 05.30.2022 |
Expanded 12x12 |
|
-- |
-- |
Gutters (0) 08.03.2022 |
|
|
-- |
-- |
Driveway (0) 08.25.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 10.11.2022 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 09.17.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 09.17.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 05.25.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 10.06.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 06.25.2022 |
In process 6/18 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.07.2022 |
|
|
-- |
-- |
Electric Rough In (4) 06.29.2022 |
In process 6/25 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 09.07.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 09.07.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 07.27.2022 |
|
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 07.03.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 07.10.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 09.12.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 05.12.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 09.07.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 06.27.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 07.13.2022 |
In process 7/10 Finish Bonus Room Bath |
|
-- |
-- |
Loan Approval (0) 09.06.2022 |
|
|
-- |
-- |
Deed Preparation (0) 04.27.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 07.31.2022 |
In process7/20 |
|
-- |
-- |
Paint 1 (1) 08.10.2022 |
|
|
-- |
-- |
Garage Door (0) 08.14.2022 |
|
|
-- |
-- |
House Numbers (0) 09.01.2022 |
|
|
-- |
-- |
Mailbox (0) 09.15.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 07.31.2022 |
Delivered 7/27 |
|
-- |
-- |
Granite Installation (1) * 09.04.2022 |
Week of Aug 29 |
|
-- |
-- |
Interior Trim - Install (3) 08.31.2022 |
In process 8/28. Needs painting |
|
-- |
-- |
Interior Trim - Paint (1) 10.26.2022 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 09.14.2022 |
In process 9/11 almost completed |
|
-- |
-- |
Luxury Vinyl Tile (0) 09.14.2022 |
|
|
-- |
-- |
Paint 2 (3) 09.07.2022 |
|
|
-- |
-- |
Cover Floors (1) 09.14.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 08.25.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 09.17.2022 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 10.13.2022 |
In process 10/8 bath accessories and shelving in a few places still needed. |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 10.08.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 08.25.2022 |
|
|
-- |
-- |
Set Water Meter (0) 09.08.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 09.30.2022 |
Brushed Nickel Standard-in process 9/28 |
|
-- |
-- |
Ceiling Fans (0) 09.24.2022 |
Living Room, BR 2 /3, Bonus. In process 9/17 |
|
-- |
-- |
HVAC Trim Out (1) 09.22.2022 |
|
|
-- |
-- |
Plumbing Trim Out (2) 09.28.2022 |
Brushed Nickel Standard. In process 9/24. Shower and faucet still needed 9/24 |
|
-- |
-- |
Install Appliances (0) * 10.05.2022 |
Oct 2 or 3 |
|
-- |
-- |
Paint 3 (2) * 09.14.2022 |
|
|
-- |
-- |
Carpet (2) 09.30.2022 |
In process 9/28 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 10.03.2022 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 10.07.2022 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 10.07.2022 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 10.07.2022 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 10.07.2022 |
Thu, Oct 6 |
|
-- |
-- |
Pre Walk Through (0) 10.10.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 09.30.2022 |
|
|
-- |
-- |
Cleaning (1) 10.12.2022 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 10.07.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 10.07.2022 |
|
|
-- |
-- |
Schedule Closing (0) 10.06.2022 |
|
|
-- |
-- |
Buyer Walk Through (1) 10.13.2022 |
Wed, Oct 12, 3:30 PM |
|
-- |
-- |
Payment for Upgrades (0) 10.06.2022 |
$380 for fans |
|
-- |
-- |
Keys to Settlement Agent (0) 10.10.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 10.06.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 09.28.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 10.10.2022 |
|
|
-- |
-- |
Closing (1) 10.15.2022 |
Brittany @ West View Title, Oct 14, 10AM |
|
-- |
-- |
Remove Coded Lockbox (0) 11.03.2022 |
|
|