| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| Upgraded Carpet stairs and upstairs | ||||
| 8 lb Pad Upstairs | ||||
| Upgraded Carpet Bonus Room | ||||
| Upgraded Carpet Pad Bonus Room | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Painted Kitchen Cabinetry | ||||
| Finished Bonus Room | ||||
| Finished Bonus Bath | ||||
| Level III Quartz Countertop in Kitchen | ||||
| Level III Quartz Countertops Master Bath | ||||
| Shower Door with black trim | ||||
| Third Paint Color | ||||
| Patio 10 x 10 | ||||
| Deck 12 x 12 | ||||
| white subway shower panel | ||||
| Cabinet Crown Moulding | ||||
| Kitchen- 3 drawer stack | ||||
| Amendment to increase price by $29,800 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 01.31.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 03.31.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.07.2022 | ||
| -- | -- | Inspection (Slab) (1) 03.31.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.07.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 06.20.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 09.07.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 09.07.2022 | ||
| -- | -- | Inspection (Framing) (1) * 09.07.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 09.07.2022 | ||
| -- | -- | Inspection (Insulation) (1) 06.27.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 09.12.2022 | On order | |
| -- | -- | Inspection (Main Sewer Line) (0) 05.12.2022 | ||
| -- | -- | Inspection (Main Water Line) (0) 09.07.2022 | ||
| -- | -- | Inspection (Final HVAC) (0) 09.21.2022 | ||
| -- | -- | Inspection (Final Plumbing) (0) 09.21.2022 | ||
| -- | -- | Inspection (Final Electric) (0) 09.21.2022 | ||
| -- | -- | Inspection (Final Building) (4) * 09.21.2022 | Tue, Sep 20 | |