CONGERS-2 - 18  ::  1390 Palomino Trail
[ BUILD: 20220406 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Thu    Nov 28      Verify Window & Roof Structure (0)      
Thu    Nov 28      Rough In Microwave Vent (0)      
Thu    Nov 28      Blower Door Test (1)      
--   --   Missing master bedroom window
--   --   Trim above porch looks uneven
--   --   Cover upstairs treads
--   --   Trim garage Henry
--   --   Rate Lock expires 11/15 Extended to 11/30
--   --   Buyer is requesting $1500 credit for delays
--   --   Painters-come back please
--   --   Can we not spit sunflower seeds on the floor?
--   --   All mirrors needed 11/16
--   --   Attic cover
--   --   Keys needed for appraiser on Tuesday
--   --   SHOWER DOOR
--   --   CODED LOCKBOX 1818
--   --   Weatherstripping Jill or painter
--   --   Cable cover Tom
--   --   Courtney has extra keys
--   --   Lots of cabinet nicks- uppers Go, Jill, Go!
--   --   Adjust closet doors upstairs bedrooms Jill
--   --   Caulk in shower walls Painter - where the shower wall and drywall meet
--   --   Screw covers in French door and front door Jill
--   --   Clean cardboard boxes and trash off of back patio Tom
--   --   Install window screens Jill
--   --   Clean overspray off of front door threshold Painter
--   --   Weatherstripping needed at front door Jill
--   --   Throwaway 7-Eleven coffee cup sitting on top of water heater :-) Jill
--   --   Clean out garage Jill will coordinate
--   --   Install media cover
--   --   Ceiling fan light is dim Tom will look at it
--   --   Secure top two shelves in master bathroom nook
--   --   Sand the ceiling by smoke detector in master bedroom
--   --   Install window screens
--   --   To snap lights in living room to be tightened to fit against ceiling Electrician
--   --   Patch drywall hole at vanity light in powder bath and adjust light
--   --   Reclean all bathroom faucets Jill
--   --   Paint touchup throughout
--   --   Clean back patio
--   --   Clean garage
--   --   Touch up paint at caulk at top of shower door Painter
--   --   Clean cement in garage Jill will mop
--   --   New Washer Pan Plumber
--   --   Shower door not closing properly Joe will look at it
--   --   Dent in living room ceiling needs touchup Painter
--   --   Back patio door needs closure for lock Tom
-- -- Ratified Contract? (0)  02.12.2022    
-- -- $2500 Deposit Received (0)  02.19.2022    
-- -- Association Packet Requested (0)  02.12.2022    
-- -- Association Packet Received (0)  02.18.2022    
-- -- Selections Meeting (0)  03.27.2022    
-- -- Selections Sheet Signed (0)  03.30.2022     3/27/2022: sent to Suzanne for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  07.29.2022     7/27: sent updated document to Suzanne
-- -- Deposit For Upgrades Received (0)  04.13.2022    
-- -- Building Permit (30)  03.06.2022    
-- -- Order Roof & Floor Trusses (1)  06.20.2022    
-- -- Order Windows & Doors (0)  05.03.2022    
-- -- Stake Out Home (1)  03.24.2022    
-- -- Excavate (2)  03.24.2022    
-- -- Inspection (Footers) (1)  03.24.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1)  03.24.2022    
-- -- Set Forms (2)  04.04.2022    
-- -- Pour Foundation Walls (1)  04.04.2022    
-- -- Plumb Slab (2)  04.28.2022    
-- -- Inspection (Plumbing Under Slab) (1)  04.28.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Prepare Slab (1)  05.12.2022    
-- -- Inspection (Slab) (1)  06.02.2022    
-- -- Inspection (Drain Tile) (0)  09.07.2022    
-- -- Pour Slab (1) *   06.02.2022    
-- -- Settlement Agent Confirmed (0)  07.22.2022    
-- -- Framing I (9)  06.09.2022    
-- -- Order Steps (0)  06.20.2022    
-- -- Order Tubs / Showers (0)  06.20.2022    
-- -- Framing II (8)  06.27.2022    
-- -- Framing III (8) *   07.05.2022    
-- -- Install Stairs (0)  07.21.2022    
-- -- Windows & Doors (0)  07.21.2022    
-- -- House Number and Status in Window (0)  08.22.2022    
-- -- Roofing (0)  08.01.2022    
-- -- Order Cabinets (0)  07.19.2022    
-- -- Order Appliances (0)  08.30.2022     Standard
-- -- Deck (0)  09.17.2022     STANDARD
-- -- Gutters (0)  10.15.2022    
-- -- Driveway (0)  11.05.2022     Expanded Driveway
-- -- Patio (0)  10.11.2022    
-- -- Privacy Divider / Fence (0)  10.19.2022    
-- -- Sod / Seed / Landscaping (0)  11.30.2022    
-- -- HVAC Rough In (4)  07.21.2022    
-- -- Inspection (Rough In HVAC) (1)  08.20.2022    
-- -- Plumbing Rough In (4)  08.14.2022    
-- -- Inspection (Rough In Plumbing) (1)  09.07.2022    
-- -- Electric Rough In (4)  08.17.2022     In process 8/14
-- -- Inspection (Rough In Electric) (1)  09.07.2022    
-- -- Inspection (Deck Piers) (0)  09.07.2022    
-- -- Inspection (Framing) (1)  09.07.2022    
-- -- Exterior Vinyl (0) *   10.02.2022    
-- -- Exterior Stone (0)  04.14.2022    
-- -- Insulation (2)  08.20.2022    
-- -- Inspection (Insulation) (1)  08.29.2022    
-- -- Inspection (Electric Service) (0)  10.27.2022    
-- -- Set Electric Meter (0)  04.11.2023    
-- -- Inspection (Main Sewer Line) (0)  05.12.2022    
-- -- Inspection (Main Water Line) (0)  09.08.2022    
-- -- Order Interior Doors & Trim (0)  08.29.2022    
-- -- Drywall (Hang) (4) *   09.05.2022     In process 8/31
-- -- Loan Approval (0)  10.27.2022    
-- -- Deed Preparation (0)  10.27.2022    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   09.24.2022     In process 9/21
-- -- Paint 1 (1)  09.24.2022    
-- -- Garage Door (0)  10.22.2022    
-- -- House Numbers (0)  10.26.2022    
-- -- Mailbox (0)  11.17.2022    
-- -- Cabinet Installation (2) *   10.05.2022     Installed?
-- -- Granite Installation (1) *   10.08.2022     10/7
-- -- Interior Trim - Install (3)  10.26.2022     In process 10/22 Needs painting.
-- -- Order Plumbing / Lighting Fixtures (0)  10.12.2023    
-- -- Interior Trim - Paint (1)  10.26.2022    
-- -- Luxury Vinyl Plank (3) *   11.02.2022     In process
-- -- Luxury Vinyl Tile (0)  11.02.2022    
-- -- Paint 2 (3)  11.12.2022     In process 11/9
-- -- Cover Floors (1)  11.02.2022    
-- -- Deliver Plumbing / Lighting Fixtures (0)  10.27.2022    
-- -- Shoe Moulding (0)  11.09.2022    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  11.16.2022     Black accessories, shower door black trims
-- -- Install Coded Lockbox (add extra keys) (0)  11.19.2022    
-- -- Pay Water / Sewer Taps (0)  10.18.2022    
-- -- Set Water Meter (0)  11.03.2022    
-- -- Electric Trim Out (3)  11.17.2022     Black Lighting. In process 11/16. Almost completed.
-- -- Ceiling Fans (0)  11.16.2022     In process 11/9
-- -- HVAC Trim Out (1)  11.16.2022    
-- -- Plumbing Trim Out (2)  11.05.2022     Black standard
-- -- Install Appliances (0) *   11.19.2022     Delivery 9/12, Install 9/19
-- -- Paint 3 (2) *   11.12.2022    
-- -- Carpet (2)  11.09.2022    
-- -- Appraiser Confirms Construction Completion (0)  11.25.2022     Joe Chadwell, Tues Nov 22
-- -- Inspection (Final HVAC) (1)  11.21.2022    
-- -- Inspection (Final Plumbing) (1)  11.21.2022    
-- -- Inspection (Final Electric) (1)  11.21.2022    
-- -- Inspection (Final Building) (2) *   11.22.2022     Fri, Nov 18
-- -- Pre Walk Through (0)  11.21.2022    
-- -- Stain Hardwood Stairs (1)  11.21.2022     In process 11/19
-- -- Cleaning (1)  11.21.2022     Sat, Nov 19. In process 11/19
-- -- Certificate of Occupancy (1) *   11.22.2022    
-- -- C.O. to Lender (0)  11.22.2022    
-- -- Schedule Closing (0)  11.28.2022    
-- -- Buyer Walk Through (1)  11.25.2022     Tuesday, Nov 22
-- -- Payment for Upgrades (0)  11.21.2022    
-- -- Keys to Settlement Agent (0)  11.28.2022    
-- -- Review Settlement Statement (0)  12.02.2022    
-- -- Jerry Signs Closing Documents (0)  11.18.2022    
-- -- Request Trash Tote From POA Manager (0)  11.17.2022    
-- -- Closing (1)  12.05.2022     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  01.02.2023