| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Level III Granite | ||||
| French Model Refrigerator | ||||
| Expanded Driveway | ||||
| Additional $200 for upgrade to GE French Model Fridge | ||||
| Microwave vented to exterior | ||||
| Amendment to increase price by $3,100 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 03.24.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 06.27.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.07.2022 | ||
| -- | -- | Inspection (Slab) (1) 07.05.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.07.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 09.12.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 09.15.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 09.21.2022 | In process 9/14 | |
| -- | -- | Inspection (Framing) (1) * 09.21.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 09.19.2022 | ||
| -- | -- | Inspection (Insulation) (1) 09.22.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 10.27.2022 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 07.05.2022 | ||
| -- | -- | Inspection (Main Water Line) (0) 10.27.2022 | ||
| -- | -- | Inspection (Final HVAC) (0) 11.21.2022 | ||
| -- | -- | Inspection (Final Plumbing) (0) 11.21.2022 | ||
| -- | -- | Inspection (Final Electric) (0) 11.21.2022 | ||
| -- | -- | Inspection (Final Building) (4) * 11.21.2022 | Monday, Nov 21 | |