37 ADDR
CONGERS-2 - 117  ::  1387 Palomino Trail
[ BUILD: 20220402 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
    Verify Window & Roof Structure (0)      
    Rough In Microwave Vent (0)      
    Order Plumbing / Lighting Fixtures (0)      
Tue    Feb 3      Blower Door Test (1)      
TO DO - COMPLETED OR DELETED
Missing back basement window
Patio standard?
Crown molding on kitchen cabinets-don’t see in changes?
3 drawer stack as well..
Kitchen trash can also
All cabinetry is same color-is that correct? Kate will follow up
Replace door to main level closet
Closet door under stairs missing
Remove golf cart from garage Tom
Cable cover garage Jill
Fill holes in basement floor? Paint touchup throughoutTom
Repair bath fan Mast & Brunk
Push oven in once outlet is ready
Squeaky for outside of master closet Tom
Squeaky floor in one of spare bedrooms Tom
Squeaky floor in one of spare bedrooms
Powder bath light needs installed
CODED LOCKBOX 0117
Push attic cover into place
Add silicone to the top of the range CJ will replace the range
Put range in place
Fix hole in master shower Thu, Dec 29
Re-sand and paint tray ceiling Painter
Repaint attic access door
Repaint attic access door
Fill and paint areas of settling at ceiling Painter
Squeaking floor in master bedroom
Add silicone and paint above master shower and hall bathroom shower Painter
Island vertical corner trim to be replaced Fred has ordered it
Window in door does not seem to be squarely installed?
Cabinet door on refrigerator door to be replaced Fred has ordered it
Max = 540-246-5877
Holes in trim board around garage Davenport
receptacle needs straightened in upstairs bathroom electricians
UPGRADES - COMPLETED
    Expanded Deck 12 x 18  
    Vent Microwave to exterior  
    Expanded Driveway  
    Amendment to increase price by $3,780  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  02.16.2022    
-- -- $2500 Deposit Received (0)  02.18.2022    
-- -- Association Packet Requested (0)  02.16.2022    
-- -- Association Packet Received (0)  02.18.2022    
-- -- Selections Meeting (0)  03.23.2022    
-- -- Selections Sheet Signed (0)  04.07.2022     3/30/2022: waiting on Kate to add expanded driveway
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  04.20.2022     4/18/2022: sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  04.19.2022    
-- -- Building Permit (30) *   03.06.2022    
-- -- Order Roof & Floor Trusses (1)  06.20.2022    
-- -- Order Windows & Doors (0)  05.03.2022    
-- -- Stake Out Home (1)  03.24.2022    
-- -- Excavate (2)  03.24.2022    
-- -- Inspection (Footers) (1)  03.24.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1) *   03.24.2022    
-- -- Set Forms (2)  04.19.2022    
-- -- Pour Foundation Walls (1)  04.21.2022    
-- -- Plumb Slab (2)  06.06.2022    
-- -- Inspection (Plumbing Under Slab) (1)  06.27.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Prepare Slab (1)  07.05.2022    
-- -- Inspection (Slab) (1)  07.05.2022    
-- -- Inspection (Drain Tile) (0)  09.07.2022    
-- -- Pour Slab (1) *   07.05.2022    
-- -- Settlement Agent Confirmed (0)  03.24.2022    
-- -- Framing I (9)  07.25.2022    
-- -- Order Steps (0)  08.22.2022    
-- -- Order Tubs / Showers (0)  06.20.2022    
-- -- Framing II (8)  07.28.2022    
-- -- Framing III (8) *   08.08.2022    
-- -- Install Stairs (0) *   08.22.2022    
-- -- Windows & Doors (0) *   08.22.2022    
-- -- House Number and Status in Window (0)  08.22.2022    
-- -- Roofing (0) *   09.01.2022    
-- -- Order Cabinets (0)  08.24.2022    
-- -- Order Appliances (0)  08.30.2022     Standard
-- -- Deck (0)  09.06.2022     Expanded 12 x 18
-- -- Gutters (0)  10.26.2022    
-- -- Driveway (0) *   11.09.2022     Expanded Driveway
-- -- Patio (0)  10.11.2022    
-- -- Privacy Divider / Fence (0) *   10.22.2022    
-- -- Sod / Seed / Landscaping (0)  11.27.2022    
-- -- HVAC Rough In (4)  08.25.2022    
-- -- Plumbing Rough In (4)  12.10.2022     In process 8/31
-- -- Electric Rough In (4)  09.05.2022    
-- -- Inspection (Rough In HVAC) (1)  09.08.2022    
-- -- Inspection (Rough In Plumbing) (1)  09.08.2022    
-- -- Inspection (Rough In Electric) (1)  09.08.2022    
-- -- Inspection (Framing) (1) *   09.08.2022    
-- -- Inspection (Deck Piers) (0)  09.08.2022    
-- -- Exterior Vinyl (0) *   10.22.2022    
-- -- Exterior Stone (0)  04.14.2022    
-- -- Insulation (2) *   09.11.2022    
-- -- Inspection (Insulation) (1)  09.15.2022    
-- -- Inspection (Electric Service) (0)  10.27.2022    
-- -- Set Electric Meter (0) *   04.11.2023    
-- -- Inspection (Main Sewer Line) (0)  07.05.2022    
-- -- Inspection (Main Water Line) (0)  10.27.2022    
-- -- Order Interior Doors & Trim (0)  10.27.2022    
-- -- Drywall (Hang) (4) *   09.17.2022     NONE
-- -- Loan Approval (0)  04.18.2022    
-- -- Deed Preparation (0)  10.31.2022    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   10.19.2022     In process10/15. Appears very close to completion.
-- -- Paint 1 (1)  10.19.2022    
-- -- Garage Door (0)  10.26.2022    
-- -- House Numbers (0)  12.03.2022    
-- -- Mailbox (0)  11.27.2022    
-- -- Cabinet Installation (2) *   10.26.2022     On site 10/22. Install 10/24
-- -- Granite Installation (1) *   11.02.2022    
-- -- Interior Trim - Install (3) *   11.19.2022     in process 11/19
-- -- Interior Trim - Paint (1)  11.27.2022    
-- -- Luxury Vinyl Plank (3) *   12.03.2022     In process 11/30
-- -- Luxury Vinyl Tile (0)  12.03.2022     In process 11/30
-- -- Paint 2 (3)  12.07.2022     painting 12/5
-- -- Cover Floors (0)  12.17.2022    
-- -- Deliver Plumbing / Lighting Fixtures (0)  12.01.2022    
-- -- Shoe Moulding (0)  12.07.2022    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   12.14.2022     Black Standard. In process 12/10
-- -- Install Coded Lockbox (add extra keys) (0)  12.17.2022    
-- -- Pay Water / Sewer Taps (0)  10.18.2022    
-- -- Set Water Meter (1) *   11.10.2022    
-- -- Electric Trim Out (3) *   12.17.2022     Needs a lot done 12/14
-- -- Ceiling Fans (0)  12.17.2022    
-- -- HVAC Trim Out (1) *   12.10.2022    
-- -- Plumbing Trim Out (2) *   12.14.2022     Black Standard. Jill will tell him to start. Only master bath vanity is plumbed. 12/10
-- -- Install Appliances (0) *   12.10.2022     12/8
-- -- Paint 3 (2) *   12.07.2022    
-- -- Carpet (2)  12.03.2022    
-- -- Appraiser Confirms Construction Completion (0)  12.27.2022    
-- -- Inspection (Final HVAC) (0)  12.21.2022    
-- -- Inspection (Final Plumbing) (0)  12.21.2022    
-- -- Inspection (Final Electric) (0)  12.21.2022    
-- -- Inspection (Final Building) (4) *   12.23.2022     Tuesday, Dec 20
-- -- Pre Walk Through (0)  12.15.2022    
-- -- Stain Hardwood Stairs (1) *   12.10.2022     In process 12/7
-- -- Cleaning (1)  12.27.2022    
-- -- Certificate of Occupancy (1) *   12.23.2022    
-- -- C.O. to Lender (0)  12.27.2022    
-- -- Schedule Closing (0)  12.20.2022    
-- -- Buyer Walk Through (1) *   12.20.2022     Mon, Dec 19 at noon
-- -- Payment for Upgrades (0)  12.20.2022    
-- -- Keys to Settlement Agent (0)  12.15.2022    
-- -- Review Settlement Statement (0)  12.29.2022    
-- -- Jerry Signs Closing Documents (0)  12.20.2022    
-- -- Request Trash Tote From POA Manager (0)  12.19.2022    
-- -- Closing (1)  12.29.2022     Brittany @ West View Title, Dec 27, 2PM
-- -- Remove Coded Lockbox (0)  01.02.2023