CONGERS-2 - 118  ::  1383 Palomino Trail
[ BUILD: 20220401 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
Deck is not standard.
Deck is not standard. Charge owners 1/2?
USDA loan - closing approx 20 days after completion
Amendment #2 Has not signed 11/16
Cover carpets Jill
Side piece of garage needed Davenport - Weatherstripping on left side of exterior garage door
Powder bath light needed Electrician
Cabinet drawer needs adjusting. Kitchen drawer to right of oven, Mid South. Thursday-12/9
Stop spitting sunflower seeds on the carpet!
Attic cover Painter
Recover carpet on steps to protect
Sunflower seeds everywhere on the carpet
Install attic access panel
Cut down closet doors rubbing on carpet Painter
Titan master bathroom escutcheons at showerhead and toilet to wall Tom
Cover steps Jill
CODED LOCKBOX 0118
Fix basement insulation Tom
Extra screens in foyer Jill
Adjust kitchen drawer
drywall seam living room
remove exposed nail island adn fix Mid South
tighten light switch to wall living room Electrician not completed 12/31
Cable box cover Jill
Paint living room wall Painter
Fill cracks in steps Painter
Final paint touch up after drywall repair Painter
Add PVC board under back door Tom
Towel holder hall bath install
Paint touch up near stair case
Parking space client discussion Monday per Jerry
siding falling off the front of townhouse davenport. Not completed 8/3
UPGRADES - COMPLETED
    White Kitchen Cabinetry  
    Three Drawer Stack in place of Base 36"  
    Expanded Driveway  
    Upgraded Quartz Countertop- calcatta classique  
    Amendment to increase price by $4,600  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  02.16.2022    
-- -- $2500 Deposit Received (0)  02.24.2022    
-- -- Association Packet Requested (0)  02.16.2022    
-- -- Association Packet Received (0)  02.18.2022    
-- -- Selections Meeting (0)  07.16.2022    
-- -- Selections Sheet Signed (0)  08.23.2022     7/16: sent to Kozhin for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  08.31.2022     8/30/2022: sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  08.30.2022    
-- -- Building Permit (30) *   03.06.2022    
-- -- Order Roof & Floor Trusses (1)  06.20.2022    
-- -- Order Windows & Doors (0)  05.03.2022    
-- -- Stake Out Home (1)  03.24.2022    
-- -- Excavate (2)  03.24.2022    
-- -- Inspection (Footers) (1)  03.24.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1) *   03.24.2022    
-- -- Set Forms (2)  04.19.2022    
-- -- Pour Foundation Walls (1)  04.21.2022    
-- -- Plumb Slab (2)  06.06.2022    
-- -- Inspection (Plumbing Under Slab) (1)  06.27.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Prepare Slab (1)  03.22.2022    
-- -- Inspection (Slab) (1)  07.05.2022    
-- -- Inspection (Drain Tile) (0)  09.07.2022    
-- -- Pour Slab (1) *   07.05.2022    
-- -- Settlement Agent Confirmed (0)  08.18.2022    
-- -- Framing I (9)  07.25.2022    
-- -- Order Steps (0)  08.22.2022    
-- -- Order Tubs / Showers (0)  06.20.2022    
-- -- Framing II (8)  07.28.2022    
-- -- Framing III (8) *   08.08.2022    
-- -- Verify Window & Roof Structure (0)  07.20.2024    
-- -- Install Stairs (0) *   08.22.2022    
-- -- Windows & Doors (0) *   08.22.2022    
-- -- House Number and Status in Window (0)  08.22.2022    
-- -- Roofing (0) *   09.01.2022    
-- -- Order Cabinets (0)  08.24.2022    
-- -- Order Appliances (0)  08.30.2022     Standard SS
-- -- Deck (0)  09.06.2022    
-- -- Gutters (0)  10.26.2022    
-- -- Driveway (0) *   11.09.2022     Expanded Driveway
-- -- Patio (0)  10.11.2022    
-- -- Privacy Divider / Fence (0) *   10.22.2022    
-- -- Sod / Seed / Landscaping (0)  11.27.2022    
-- -- HVAC Rough In (4)  08.25.2022    
-- -- Rough In Microwave Vent (0)  07.20.2024    
-- -- Plumbing Rough In (4)  09.01.2022     In process 8/31
-- -- Electric Rough In (4)  09.06.2022    
-- -- Inspection (Rough In HVAC) (1)  09.08.2022    
-- -- Inspection (Rough In Plumbing) (1)  09.08.2022    
-- -- Inspection (Rough In Electric) (1)  09.08.2022    
-- -- Inspection (Framing) (1) *   09.08.2022    
-- -- Inspection (Deck Piers) (0)  09.08.2022    
-- -- Exterior Vinyl (0) *   10.19.2022    
-- -- Exterior Stone (0)  11.27.2022     In process 11/19
-- -- Insulation (2) *   09.11.2022    
-- -- Inspection (Insulation) (1)  09.15.2022    
-- -- Inspection (Electric Service) (0)  10.27.2022    
-- -- Set Electric Meter (0) *   04.11.2023    
-- -- Inspection (Main Sewer Line) (0)  08.29.2022    
-- -- Inspection (Main Water Line) (0)  10.27.2022    
-- -- Order Interior Doors & Trim (0)  10.27.2022    
-- -- Drywall (Hang) (4) *   09.24.2022     In process 9/21
-- -- Loan Approval (0)  09.07.2022    
-- -- Deed Preparation (0)  12.02.2022     After amendment
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   10.19.2022     In process 10/16. Maybe just need to sweep up?
-- -- Paint 1 (1)  10.19.2022    
-- -- Garage Door (0)  10.26.2022    
-- -- House Numbers (0)  11.27.2022    
-- -- Mailbox (0)  11.27.2022    
-- -- Cabinet Installation (2) *   10.26.2022     install 10/24. On site 10/22
-- -- Granite Installation (1) *   11.02.2022    
-- -- Interior Trim - Install (3) *   11.09.2022     in process 11/5
-- -- Order Plumbing / Lighting Fixtures (0)  07.20.2024    
-- -- Interior Trim - Paint (1)  11.12.2022     In process 11/9
-- -- Luxury Vinyl Plank (3) *   11.16.2022    
-- -- Luxury Vinyl Tile (0)  11.16.2022    
-- -- Paint 2 (3)  11.27.2022     In process 11/19
-- -- Cover Floors (0)  11.27.2022    
-- -- Deliver Plumbing / Lighting Fixtures (0)  11.27.2022    
-- -- Shoe Moulding (0)  11.19.2022    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   12.03.2022     Black accessories in process 11/30. Shelving needed. Mirrors too.
-- -- Install Coded Lockbox (add extra keys) (0)  12.05.2022    
-- -- Pay Water / Sewer Taps (0)  10.18.2022    
-- -- Set Water Meter (1) *   11.10.2022    
-- -- Electric Trim Out (3) *   11.30.2022     Black Standard. 99% completed
-- -- Ceiling Fans (0)  11.27.2022    
-- -- HVAC Trim Out (1) *   11.27.2022    
-- -- Blower Door Test (1)  07.20.2024    
-- -- Plumbing Trim Out (2) *   11.27.2022     Black Standard
-- -- Install Appliances (0) *   11.30.2022     Everything installed but refrigerator. Maybe awaiting outlet cover behind it?
-- -- Paint 3 (2) *   11.27.2022    
-- -- Carpet (2)  11.27.2022    
-- -- Appraiser Confirms Construction Completion (0)  01.02.2023    
-- -- Inspection (Final HVAC) (0)  12.01.2022    
-- -- Inspection (Final Plumbing) (0)  12.01.2022    
-- -- Inspection (Final Electric) (0)  12.01.2022    
-- -- Inspection (Final Building) (4) *   12.02.2022     Mon, Nov 28
-- -- Pre Walk Through (0)  12.05.2022    
-- -- Stain Hardwood Stairs (1) *   11.30.2022    
-- -- Cleaning (1)  12.07.2022     in process 12/3
-- -- Certificate of Occupancy (1) *   12.02.2022    
-- -- C.O. to Lender (0)  12.02.2022    
-- -- Schedule Closing (0)  01.25.2023    
-- -- Buyer Walk Through (1) *   12.08.2022     12/5 11:30am
-- -- Payment for Upgrades (0)  12.08.2022    
-- -- Keys to Settlement Agent (0)  12.07.2022    
-- -- Review Settlement Statement (0)  01.23.2023    
-- -- Jerry Signs Closing Documents (0)  01.28.2023    
-- -- Request Trash Tote From POA Manager (0)  12.08.2022    
-- -- Closing (1)  01.28.2023     Main Street Title Group, Friday Jan 27
-- -- Remove Coded Lockbox (0)  01.30.2023