1 33 37 89 47 73 67 55 56 59 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 22  ::  1412 Palomino Trail
[ BUILD: 20220410 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Replace post in master bath
--   --   This house has an oversized patio
--   --   Rotten/broken spot in floor
--   --   Drywall repair needed in garage
--   --   Drywallers need to sweep
--   --   Coffee bar installed in the wrong location wrong wall, facing the wrong direction. moving 11/14
--   --   Spice rack handle should have been installed horizontally? No spice rack is installed. Just standard cabinet.
--   --   No roll out trays in kitchen
--   --   Final cabinets needs installed 11/5 install? On site in living room 11/16
--   --   Order spice rack? Kate will talk to the buyer
--   --   Spice rack and three drawer stack On order
--   --   Cultured mable tops needed here too In living room11/16
--   --   Pieces needed at baseboard to make coffee bar look correct?
--   --  
--   --   Handles needed on 3 drawer stack Friday, 12/9
--   --   Cabinet piece needed by 3 drawer stack Filler piece needed, bottom piece, Friday, 12/9
--   --   Install coffee bar counter
--   --  
--   --   Do we need side splash on coffee bar? On order
--   --   USDA amendment to be signed by Jerry
--   --   Outlet missing at coffee nook? Needed!
--   --   Trim garage Henry or Edgar
--   --   Cable / electric covers needed in garage Jill or Tom
--   --   Hole in powder bath near light fixture Drywaller
--   --   Black drain needed in shower Plumber
--   --   Digital deadbolt not installed. C did not take keys.
--   --   CODED LOCKBOX 2222
--   --   Corner siding-are we fixing?
--   --   Electric trim out needed in master bath Electrician
--   --   Powder bath mirror looks crooked Joe
--   --   Touchups mirror powder bath where moved Painter
--   --   Dented fridge Replace, Kate will follow up with CJ and Leisa
--   --   Lightbulb hall bath Jill
--   --   Remove extra drain catcher-thing Splash block - Tom
--   --   Screens under steps
--   --   Clean patio and
--   --   Clean patio and out front
--   --   Paint touch ups throughout home Painter
--   --   Spice rack doesn’t open or close good Midsouth, Fred
--   --   Transition strip going into the bonus room isn’t secure Denny
--   --   Remove extra screens from I
--   --   Remove extra screens from closet under stairs o
--   --   Remove extra screens from basement closet under the stairs Jill
--   --   Front door latch needs adjusted so it latches better Tom
--   --   Crack in frame of LR window Tom will look at
--   --   Hole in the skin of the coffee bar in the cabinet Midsouth - Fred will get a new skin
--   --   Cabinet to the right of the fridge won’t open enough for the pull out drawer to open Midsouth - Fred to adjust hinges to open wider. Works fine 1/21
--   --   Caulk in the coffee bar
--   --   Caulk the top of the coffee bar at ceiling and crown molding Painters
--   --   Adjust the trash can cabinet door to make it even with the drawer above it Midsouth
--   --   Remove film from pvc board on patio Jill
--   --   Caulk the top of the shower/tubs in all bathrooms Painter
--   --   Couple spots of mud on carpet Jill
--   --   Switch chandeliers Electricians- Monday morning. Please call and confirm with electricians
--   --   Living room electric plate
--   --   Power wash patio Jill
--   --   Exterior door paint touchups Painter
--   --   Fix grade in backyard Tom will coordinate
--   --   Trash can wobbly Fred
--   --   Spice rack adjustment Fred
--   --   Clean sticker off pedestal sink Jill
--   --   Dining floor scratches New flooring on order
--   --   Paint on Master closet carpet and orange mud in master bedroom Clean- Jill
--   --   gallon of gray paint Painter
--   --   Clean sticker off pedestal sink
--   --   Backyard grading issue Bub? Install French drain in the spring
--   --   Primary bedroom fan is installed crooked Electrician
--   --   Front door does not close, seal or lock properly (light can be seen around the edges when closed) Jill, Paul
--   --   there is a gap in the drywall inside the first floor coat closet Painter
--   --   missing light cover on 2nd floor landing Jill
--   --   Excessive creaking in primary bedroom shower Jeremiah
--   --   no caulking around the floor of the primary bedroom shower Painter
--   --   the pantry cabinets next to the refrigerator do not open properly due to the door frame of the pantry Fred. Being repaired 3/11
--   --   no caulking around kitchen sink where it meets the cabinets fred
--   --   - Guest bathroom vent cover is not properly attached Jill- Mast & Brunk
--   --   Scribe moulding for sink Fred
-- -- Ratified Contract? (0)  03.04.2022    
-- -- $2500 Deposit Received (0)  03.08.2022    
-- -- Association Packet Requested (0)  03.04.2022    
-- -- Association Packet Received (0)  03.05.2022    
-- -- Selections Meeting (0)  04.08.2022    
-- -- Selections Sheet Signed (0)  04.16.2022     4/12/2022: sent to Brad for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  08.19.2022     8/18/2022: new version sent to Jerry
-- -- Deposit For Upgrades Received (0)  04.29.2022    
-- -- Building Permit (30)  03.06.2022    
-- -- Order Roof & Floor Trusses (1)  08.04.2022    
-- -- Order Windows & Doors (0)  05.03.2022    
-- -- Stake Out Home (1)  03.24.2022    
-- -- Excavate (2)  03.24.2022    
-- -- Inspection (Footers) (1)  03.24.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1)  03.24.2022    
-- -- Set Forms (2)  04.07.2022    
-- -- Pour Foundation Walls (1)  04.07.2022    
-- -- Plumb Slab (2)  06.27.2022    
-- -- Inspection (Plumbing Under Slab) (1)  06.27.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Prepare Slab (1)  07.25.2022    
-- -- Inspection (Slab) (1)  08.04.2022    
-- -- Inspection (Drain Tile) (0)  09.07.2022    
-- -- Pour Slab (1) *   08.04.2022    
-- -- Settlement Agent Confirmed (0)  09.10.2022    
-- -- Framing I (9)  08.22.2022    
-- -- Order Steps (0)  08.29.2022    
-- -- Order Tubs / Showers (0)  06.20.2022    
-- -- Framing II (8)  09.01.2022    
-- -- Framing III (8) *   09.06.2022    
-- -- Verify Window & Roof Structure (0)  12.11.2023    
-- -- Install Stairs (0)  10.03.2022    
-- -- Windows & Doors (0)  10.03.2022    
-- -- House Number and Status in Window (0)  10.24.2022    
-- -- Roofing (0)  10.03.2022    
-- -- Order Cabinets (0)  09.06.2022    
-- -- Order Appliances (0)  08.30.2022     Standard
-- -- Deck (0)  10.16.2022     STANDARD
-- -- Gutters (0)  12.28.2022    
-- -- Driveway (0)  10.26.2022     Expanded Driveway
-- -- Patio (0)  10.16.2022    
-- -- Privacy Divider / Fence (0)  12.17.2022    
-- -- Sod / Seed / Landscaping (0)  12.31.2022    
-- -- HVAC Rough In (4)  09.17.2022    
-- -- Inspection (Rough In HVAC) (1)  09.22.2022    
-- -- Rough In Microwave Vent (0)  12.11.2023    
-- -- Plumbing Rough In (4)  09.21.2022     In process 9/17
-- -- Inspection (Rough In Plumbing) (1)  09.22.2022    
-- -- Electric Rough In (4)  10.02.2022    
-- -- Inspection (Rough In Electric) (1)  10.05.2022    
-- -- Inspection (Deck Piers) (0)  10.03.2022    
-- -- Inspection (Framing) (1)  10.05.2022    
-- -- Exterior Vinyl (0) *   12.10.2022     In process 11/27
-- -- Exterior Stone (0)  04.14.2022    
-- -- Insulation (2)  10.08.2022    
-- -- Inspection (Insulation) (1)  10.16.2022    
-- -- Inspection (Electric Service) (0)  01.10.2023    
-- -- Set Electric Meter (0)  04.11.2023    
-- -- Inspection (Main Sewer Line) (0)  12.08.2022    
-- -- Inspection (Main Water Line) (0)  12.08.2022    
-- -- Order Interior Doors & Trim (0)  12.08.2022    
-- -- Drywall (Hang) (4) *   10.16.2022     NONE
-- -- Loan Approval (0)  04.16.2022    
-- -- Deed Preparation (0)  12.01.2022    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   10.29.2022     In process 10/26
-- -- Paint 1 (1)  10.29.2022    
-- -- Garage Door (0)  12.31.2022    
-- -- House Numbers (0)  12.27.2022    
-- -- Mailbox (0)  01.07.2023     Post up, needs mailbox
-- -- Cabinet Installation (2) *   11.02.2022     10/29. On site 10/29
-- -- Granite Installation (1) *   11.27.2022     Monday 11/21
-- -- Interior Trim - Install (3)  12.03.2022     In process 11/30
-- -- Order Plumbing / Lighting Fixtures (0)  12.11.2023    
-- -- Interior Trim - Paint (1)  12.03.2022    
-- -- Luxury Vinyl Plank (3) *   12.14.2022     week of 12/5
-- -- Luxury Vinyl Tile (0)  12.14.2022    
-- -- Paint 2 (3)  12.07.2022    
-- -- Cover Floors (1)  12.31.2022    
-- -- Deliver Plumbing / Lighting Fixtures (0)  12.08.2022    
-- -- Shoe Moulding (0)  12.28.2022    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  12.31.2022     Black accessories
-- -- Install Coded Lockbox (add extra keys) (0)  01.06.2023    
-- -- Pay Water / Sewer Taps (0)  12.12.2022    
-- -- Set Water Meter (0)  01.05.2023    
-- -- Electric Trim Out (3)  01.07.2023     Black Standard. In process 1/4
-- -- Ceiling Fans (0)  12.31.2022     Living Room
-- -- HVAC Trim Out (1)  01.11.2023    
-- -- Blower Door Test (1)  12.11.2023    
-- -- Plumbing Trim Out (2)  12.28.2022     UPGRADE Black Farmhouse. Started 12/17
-- -- Install Appliances (0) *   01.05.2023     being installed 1/4
-- -- Paint 3 (2) *   12.07.2022    
-- -- Carpet (2)  12.17.2022     In process 12/14
-- -- Appraiser Confirms Construction Completion (0)  01.19.2023     Mike Shirfey - Mon, Jan 16, noon
-- -- Inspection (Final HVAC) (1)  01.12.2023    
-- -- Inspection (Final Plumbing) (1)  01.12.2023    
-- -- Inspection (Final Electric) (1)  01.12.2023    
-- -- Inspection (Final Building) (2) *   01.16.2023     Reinspect, Friday, Jan 13
-- -- Pre Walk Through (0)  01.12.2023    
-- -- Stain Hardwood Stairs (1)  12.28.2022    
-- -- Cleaning (1)  01.11.2023    
-- -- Certificate of Occupancy (1) *   01.17.2023    
-- -- C.O. to Lender (0)  01.17.2023    
-- -- Schedule Closing (0)  01.17.2023    
-- -- Buyer Walk Through (1)  01.16.2023     Friday, Jan 13, 3PM
-- -- Payment for Upgrades (0)  01.04.2023    
-- -- Keys to Settlement Agent (0)  01.09.2023    
-- -- Review Settlement Statement (0)  01.23.2023    
-- -- Jerry Signs Closing Documents (0)  01.20.2023    
-- -- Request Trash Tote From POA Manager (0)  01.10.2023    
-- -- Closing (1)  01.21.2023     Cheryl Payne, Clark & Bradshaw
-- -- Remove Coded Lockbox (0)  01.26.2023