Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Soggy insulation 10/2 |
|
|
-- |
-- |
sink base swapped for lot 21- rush ordered on 11/2 - ( 3 week turn around) |
|
|
-- |
-- |
Few Pics-Painting #1 |
|
|
-- |
-- |
Driveway is framed to be expanded not standard 11/27 |
|
|
-- |
-- |
Rate lock expires 1/18 |
|
|
-- |
-- |
Missing handle basement vanity |
Jill |
|
-- |
-- |
Flooring problems |
|
|
-- |
-- |
Shoe mold base bath tub |
All tubs/showers |
|
-- |
-- |
Bulbs needed throughout |
Jill |
|
-- |
-- |
Reinstall doors where carpet was installed |
Trim |
|
-- |
-- |
Missing 1 house number |
Jill |
|
-- |
-- |
Cable covers needed |
Electrician |
|
-- |
-- |
Needs digital deadbolt |
Joe |
|
-- |
-- |
Black shower drain needed |
Plumber |
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Pressure wash front/patio |
Bridges |
|
-- |
-- |
Powder bath toilet leaking |
Not seen this morning-kk |
|
-- |
-- |
Un-cleanable black streaks on mirror |
Powder room - Joe |
|
-- |
-- |
Light receptacle powder bath |
Outlet cover |
|
-- |
-- |
Hole needs patching powder bath |
Painter |
|
-- |
-- |
Hall receptacle cover needed |
Painter |
|
-- |
-- |
Scratch on kitchen island |
|
|
-- |
-- |
Unclog powder bath toilet |
|
|
-- |
-- |
Install hand towel ring |
|
|
-- |
-- |
Closet doors trim down |
|
|
-- |
-- |
Patch screw holes u see mirror |
|
|
-- |
-- |
Scratches on stairs |
|
|
-- |
-- |
More mud on carpet |
Bonus room - Jill |
|
-- |
-- |
Sweep garage |
Courtney |
|
-- |
-- |
Screens |
Jill |
|
-- |
-- |
Touch up paint |
painter |
|
-- |
-- |
Touch up paint moved mirror |
|
|
-- |
-- |
Adjust Bonus Room Window |
Tom - will not latch |
|
-- |
-- |
Plug Screw holes both French doors |
Jill |
|
-- |
-- |
Trim bottom of bonus room closet- uneven |
Painter, Jill |
|
-- |
-- |
Overspray kitchen pantry cabinet |
Painter |
|
-- |
-- |
Drywall hole powder bath |
Painter |
|
-- |
-- |
Raise Powder Bath mirror |
Joe |
|
-- |
-- |
Drywall hole- master bath shower head |
Painter |
|
-- |
-- |
Floor pop in master BR by bathroom wall |
Tom |
|
-- |
-- |
Raise chandelier 6 links |
Electrician 2/2 |
|
-- |
-- |
Buyer Contact- 319-929-7865 |
Mason |
|
-- |
-- |
Clean kitchen counter |
|
|
-- |
-- |
Ratified Contract? (0) 03.18.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 03.22.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 03.18.2022 |
|
|
-- |
-- |
Association Packet Received (0) 03.24.2022 |
|
|
-- |
-- |
Selections Meeting (0) 04.13.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 04.16.2022 |
4/12/2022: sent to Jen for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 04.22.2022 |
4/21/2022: sent to Jerry for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0) 04.21.2022 |
|
|
-- |
-- |
Building Permit (30) 07.05.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 08.04.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 05.03.2022 |
|
|
-- |
-- |
Stake Out Home (1) 03.24.2022 |
|
|
-- |
-- |
Excavate (2) 04.19.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 04.19.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 04.19.2022 |
|
|
-- |
-- |
Set Forms (2) 04.19.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 04.21.2022 |
|
|
-- |
-- |
Plumb Slab (2) 08.08.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 08.08.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1) 08.22.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 08.22.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.08.2022 |
|
|
-- |
-- |
Pour Slab (1) * 08.22.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 04.30.2022 |
|
|
-- |
-- |
Framing I (9) 08.22.2022 |
|
|
-- |
-- |
Order Steps (0) 09.01.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 06.20.2022 |
|
|
-- |
-- |
Framing II (8) 09.06.2022 |
|
|
-- |
-- |
Framing III (8) * 09.29.2022 |
|
|
-- |
-- |
Install Stairs (0) 10.03.2022 |
|
|
-- |
-- |
Windows & Doors (0) 10.03.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 10.24.2022 |
|
|
-- |
-- |
Roofing (0) 10.16.2022 |
|
|
-- |
-- |
Order Cabinets (0) 09.08.2022 |
|
|
-- |
-- |
Order Appliances (0) 08.30.2022 |
Standard |
|
-- |
-- |
Deck (0) 10.29.2022 |
Standard |
|
-- |
-- |
Gutters (0) 01.21.2023 |
|
|
-- |
-- |
Driveway (0) 12.05.2022 |
Standard |
|
-- |
-- |
Patio (0) 10.19.2022 |
Standard |
|
-- |
-- |
Privacy Divider / Fence (0) 01.07.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 01.11.2023 |
|
|
-- |
-- |
HVAC Rough In (4) 10.02.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 10.17.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 10.16.2022 |
In process 10/8 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 10.17.2022 |
|
|
-- |
-- |
Electric Rough In (4) 10.19.2022 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 10.26.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 11.10.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 10.26.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 01.01.2023 |
In process 12/28 |
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 10.26.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 10.26.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 01.10.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 12.19.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 12.19.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 12.08.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 10.29.2022 |
Finish Bonus Room, Bath. In process10/26 |
|
-- |
-- |
Loan Approval (0) 01.04.2023 |
|
|
-- |
-- |
Deed Preparation (0) 01.04.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 11.16.2022 |
In process 11/12 |
|
-- |
-- |
Paint 1 (1) 11.19.2022 |
In process 11/16 |
|
-- |
-- |
Garage Door (0) 01.07.2023 |
|
|
-- |
-- |
House Numbers (0) 01.11.2023 |
Missing 1 number |
|
-- |
-- |
Mailbox (0) 01.16.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 11.30.2022 |
11/28 |
|
-- |
-- |
Granite Installation (1) * 11.30.2022 |
11/29? |
|
-- |
-- |
Interior Trim - Install (3) 12.10.2022 |
In process 12/7 |
|
-- |
-- |
Interior Trim - Paint (1) 12.14.2022 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 01.07.2023 |
In process 1/4 |
|
-- |
-- |
Luxury Vinyl Tile (0) 01.04.2023 |
All completed but base bath 1/1 |
|
-- |
-- |
Paint 2 (3) 12.17.2022 |
In process 12/14 |
|
-- |
-- |
Cover Floors (1) 01.07.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 12.29.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 01.07.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 01.14.2023 |
Need mirrors and shelving |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 01.21.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 12.29.2022 |
|
|
-- |
-- |
Set Water Meter (0) 01.12.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 01.11.2023 |
In process 1/7. Needs bulbs and cable covers. Outlets on kitchen island |
|
-- |
-- |
Ceiling Fans (0) 01.07.2023 |
Living Room BR 2/3 |
|
-- |
-- |
HVAC Trim Out (1) 01.14.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 01.11.2023 |
Black Standard plumbing |
|
-- |
-- |
Install Appliances (0) * 01.12.2023 |
Delivery 10/24, Install 11/1 ( confirm with CJ) |
|
-- |
-- |
Paint 3 (2) * 12.17.2022 |
|
|
-- |
-- |
Carpet (2) 01.07.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 01.26.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 01.20.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 01.20.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 01.20.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 01.20.2023 |
Thu, Jan 19 |
|
-- |
-- |
Pre Walk Through (0) 01.23.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 01.21.2023 |
In process 1/18 |
|
-- |
-- |
Cleaning (1) 01.21.2023 |
starting 1/19 |
|
-- |
-- |
Certificate of Occupancy (1) * 01.20.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 01.20.2023 |
|
|
-- |
-- |
Schedule Closing (0) 01.30.2023 |
|
|
-- |
-- |
Buyer Walk Through (1) 01.25.2023 |
Mon, Jan 23 at 12PM |
|
-- |
-- |
Payment for Upgrades (0) 01.26.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 01.23.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 01.31.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 01.24.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 01.24.2023 |
|
|
-- |
-- |
Closing (1) 02.02.2023 |
Brittany @ West View Title, Wed, Feb 1 at 11AM |
|
-- |
-- |
Remove Coded Lockbox (0) 02.22.2023 |
|
|