CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
2 sets of hardwood treads installed
Drywalll patch needed basement door frame 12/28
Cover carpet floors
Cover LVP?
Partial credit for not so expanded driveway? (Scott is asking)
Powder bath mirror vey low Joe
Push oven into place Tom - after drywall repair
Front garage framing correct?
CODED LOCKBOX 0111 1111
PVC board around garage Davenport
Black drain needed in m shower Plumber
Needs all lightbulbs Electrician
Weather stripping top of patio door needed Painter
Receptacles needed kitchen island Electrician
Final paint Painter - touch up
Repair grade in front yard near driveway
Post to protect transformer Tom, SVEC
Trim needed around garage door Weatherstripping - Jeff, Davenport
Bonus room French door lock to be adjusted Tom will look at it
Drywall and dust on surface of range- please be careful
Attic access needed Painter
Weatherstripping needed back patio door off basement Jill
Power wash patio and rock in front
Sod behind townhouses
Cable box covers in garage need installed Tom
White sopport board to patio? Tom. Needs nailed.
Repair insulation in bonus space Tom
White board needed to deck under patio door Tom
Scratches in master mirror Joe - swap out
Dig out concrete around rough in plumbing Tom
Fix yard Pettit
bathtub repair Wed, Mar 22. Dent in master shower also.
Screens Jill
Fix faucet leak
Remop garage/foyer after drywall repairs from leak Court
Some windows looking very smudged in sunlight Courtney
Island cabinet touch up Kate attempted 3/20
Add bracket to base of handrail leading to the bedroom level Edgar
Adjust closet doors upstairs Jill
Call bathroom caulk inside/- actually chip in side splash (repair or replace) Hall bath - Tom
Upstairs hall bathroom toilet sounded very scary when I flushed it Tom
Patch drywall in garage at faucet leak Drywallers. Needs final sanding 3/22
Clean shoe mold at front and garage for inside home Court
Wether stripping right side of front door Jill
remove paint from all knobs, and hinges Painter
paint tops and bottoms of doors throughout Painterr
repaint banister at top of first set of stairs and second- painter
Reclean skin on island Court
Attic access needed
Remove ladder Tom
Touch up paint blue tape on cabinets Jill
Crooked middle window
2 Chios in the kitchen counter (on island) Chips
2 chips in kitchen island granite 3/30 - Fenco
Paint posts by transformer - black Painter-jill is painting second set asap
Driveway discoloration - Glo Fiber Tom - talk to Danny Beam
UPGRADES - COMPLETED
    Expanded Driveway  
    12 x 12 Deck  
    Amendment to increase price by $2,100  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  03.27.2022    
-- -- $2500 Deposit Received (0)  03.29.2022    
-- -- Association Packet Requested (0)  03.27.2022    
-- -- Association Packet Received (0)  04.02.2022    
-- -- Selections Meeting (0)  04.13.2022    
-- -- Selections Sheet Signed (0)  04.16.2022     4/12/2022: sent to Maggie for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  04.18.2022     4/17/2022: sent to Jerry for signatures
-- -- Deposit For Upgrades Received (0)  04.16.2022    
-- -- Building Permit (30) *   07.20.2022    
-- -- Order Roof & Floor Trusses (1)  08.29.2022    
-- -- Order Windows & Doors (0)  09.08.2022    
-- -- Stake Out Home (1)  07.28.2022    
-- -- Excavate (2)  07.28.2022    
-- -- Inspection (Footers) (1)  07.28.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1) *   07.28.2022    
-- -- Set Forms (2)  09.06.2022    
-- -- Pour Foundation Walls (1)  09.06.2022    
-- -- Plumb Slab (2)  09.01.2022    
-- -- Inspection (Plumbing Under Slab) (1)  09.06.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Prepare Slab (1)  09.06.2022    
-- -- Inspection (Slab) (1)  09.06.2022    
-- -- Inspection (Drain Tile) (0)  09.08.2022    
-- -- Pour Slab (1) *   09.06.2022    
-- -- Settlement Agent Confirmed (0)  10.07.2022    
-- -- Framing I (9)  09.29.2022    
-- -- Order Steps (0)  10.10.2022    
-- -- Order Tubs / Showers (0)  10.10.2022    
-- -- Framing II (8)  10.09.2022    
-- -- Framing III (8) *   10.20.2022    
-- -- Verify Window & Roof Structure (0)  12.11.2023    
-- -- Install Stairs (0) *   10.29.2022    
-- -- Windows & Doors (0) *   10.29.2022    
-- -- House Number and Status in Window (0)  12.10.2022    
-- -- Roofing (0) *   10.29.2022    
-- -- Order Cabinets (0)  10.11.2022    
-- -- Order Appliances (0)  08.30.2022     Standard
-- -- Deck (0)  10.29.2022     Expanded 12 x 12 Deck
-- -- Gutters (0)  02.01.2023    
-- -- Driveway (0) *   12.28.2022     Expanded Driveway
-- -- Patio (0)  12.07.2022     Standard
-- -- Privacy Divider / Fence (0) *   02.04.2023     Needs deck railings 2/1
-- -- Sod / Seed / Landscaping (0)  03.01.2023    
-- -- HVAC Rough In (4)  10.29.2022    
-- -- Rough In Microwave Vent (0)  12.11.2023    
-- -- Plumbing Rough In (4)  11.02.2022     In process 10/29
-- -- Electric Rough In (4)  11.10.2022     In process almost completed 11/5
-- -- Inspection (Rough In HVAC) (1)  11.07.2022    
-- -- Inspection (Rough In Plumbing) (1)  11.10.2022    
-- -- Inspection (Rough In Electric) (1)  11.10.2022    
-- -- Inspection (Framing) (1) *   11.10.2022    
-- -- Inspection (Deck Piers) (0)  11.10.2022    
-- -- Exterior Vinyl (0) *   01.28.2023     In process 1/18
-- -- Exterior Stone (0)  02.08.2023     in process 2/4
-- -- Insulation (2) *   11.12.2022    
-- -- Inspection (Insulation) (1)  11.17.2022    
-- -- Inspection (Electric Service) (0)  03.08.2023     Tue, Mar 7
-- -- Set Electric Meter (0) *   04.06.2023    
-- -- Inspection (Main Sewer Line) (0)  01.09.2023    
-- -- Inspection (Main Water Line) (0)  01.09.2023    
-- -- Order Interior Doors & Trim (0)  12.08.2022    
-- -- Drywall (Hang) (4) *   11.21.2022     Stocked 11/19
-- -- Loan Approval (0)  01.31.2023    
-- -- Deed Preparation (0)  01.31.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   12.10.2022     Final sanding taking place 12/7
-- -- Paint 1 (1)  12.10.2022    
-- -- Garage Door (0)  02.15.2023     Clean out garage
-- -- House Numbers (0)  02.15.2023    
-- -- Mailbox (0)  02.08.2023    
-- -- Cabinet Installation (2) *   12.14.2022     Dec 14
-- -- Granite Installation (1) *   12.27.2022    
-- -- Interior Trim - Install (3) *   01.01.2023     In process 12/28
-- -- Order Plumbing / Lighting Fixtures (0)  09.05.2023    
-- -- Interior Trim - Paint (1)  01.01.2023    
-- -- Luxury Vinyl Plank (3) *   01.18.2023     In process 1/11
-- -- Luxury Vinyl Tile (0)  01.18.2023     In process 1/11
-- -- Paint 2 (3)  01.04.2023    
-- -- Cover Floors (0)  01.26.2023     Carpet needs covered asap
-- -- Deliver Plumbing / Lighting Fixtures (0)  01.16.2023    
-- -- Shoe Moulding (0)  01.21.2023    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   02.01.2023     Black accessories. In process. Needs mirrors and some shelving 1/28
-- -- Install Coded Lockbox (add extra keys) (0)  02.01.2023    
-- -- Pay Water / Sewer Taps (0)  01.10.2023    
-- -- Set Water Meter (1) *   01.23.2023    
-- -- Electric Trim Out (3) *   02.11.2023     Black Standard- started 2/8 Neds a few outlets and al bulbs.
-- -- Ceiling Fans (0)  02.04.2023    
-- -- HVAC Trim Out (1) *   02.22.2023    
-- -- Blower Door Test (1)  10.27.2023    
-- -- Plumbing Trim Out (2) *   01.18.2023     Black Standard
-- -- Install Appliances (0) *   02.04.2023     Delivery 10/31- Schedule install with CJ
-- -- Paint 3 (2) *   01.04.2023    
-- -- Carpet (2)  01.18.2023    
-- -- Appraiser Confirms Construction Completion (0)  03.23.2023     David, Valley Appraisal, Tues, Mar 21
-- -- Inspection (Final HVAC) (0)  03.22.2023    
-- -- Inspection (Final Plumbing) (0)  03.22.2023    
-- -- Inspection (Final Electric) (0)  03.22.2023    
-- -- Inspection (Final Building) (4) *   03.22.2023    
-- -- Pre Walk Through (0)  02.27.2023    
-- -- Stain Hardwood Stairs (1) *   02.08.2023     In process 2/4
-- -- Cleaning (1)  03.18.2023     In process 3/1
-- -- Certificate of Occupancy (1) *   03.22.2023    
-- -- C.O. to Lender (0)  03.22.2023    
-- -- Schedule Closing (0)  03.23.2023    
-- -- Buyer Walk Through (1) *   03.22.2023     Mon, Mar 20, 5:30 PM
-- -- Payment for Upgrades (0)  03.05.2023    
-- -- Keys to Settlement Agent (0)  02.27.2023    
-- -- Review Settlement Statement (0)  03.23.2023    
-- -- Jerry Signs Closing Documents (0)  12.20.2022    
-- -- Request Trash Tote From POA Manager (0)  03.18.2023    
-- -- Closing (1)  03.23.2023     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  03.27.2023