2 sets of hardwood treads installed |
|
|
-- |
-- |
Drywalll patch needed basement door frame 12/28 |
|
|
-- |
-- |
Cover carpet floors |
|
|
-- |
-- |
Cover LVP? |
|
|
-- |
-- |
Partial credit for not so expanded driveway? |
(Scott is asking) |
|
-- |
-- |
Powder bath mirror vey low |
Joe |
|
-- |
-- |
Push oven into place |
Tom - after drywall repair |
|
-- |
-- |
Front garage framing correct? |
|
|
-- |
-- |
CODED LOCKBOX 0111 |
1111 |
|
-- |
-- |
PVC board around garage |
Davenport |
|
-- |
-- |
Black drain needed in m shower |
Plumber |
|
-- |
-- |
Needs all lightbulbs |
Electrician |
|
-- |
-- |
Weather stripping top of patio door needed |
Painter |
|
-- |
-- |
Receptacles needed kitchen island |
Electrician |
|
-- |
-- |
Final paint |
Painter - touch up |
|
-- |
-- |
Repair grade in front yard near driveway |
|
|
-- |
-- |
Post to protect transformer |
Tom, SVEC |
|
-- |
-- |
Trim needed around garage door |
Weatherstripping - Jeff, Davenport |
|
-- |
-- |
Bonus room French door lock to be adjusted |
Tom will look at it |
|
-- |
-- |
Drywall and dust on surface of range- please be careful |
|
|
-- |
-- |
Attic access needed |
Painter |
|
-- |
-- |
Weatherstripping needed back patio door off basement |
Jill |
|
-- |
-- |
Power wash patio |
and rock in front |
|
-- |
-- |
Sod behind townhouses |
|
|
-- |
-- |
Cable box covers in garage need installed |
Tom |
|
-- |
-- |
White sopport board to patio? |
Tom. Needs nailed. |
|
-- |
-- |
Repair insulation in bonus space |
Tom |
|
-- |
-- |
White board needed to deck under patio door |
Tom |
|
-- |
-- |
Scratches in master mirror |
Joe - swap out |
|
-- |
-- |
Dig out concrete around rough in plumbing |
Tom |
|
-- |
-- |
Fix yard |
Pettit |
|
-- |
-- |
bathtub repair |
Wed, Mar 22. Dent in master shower also. |
|
-- |
-- |
Screens |
Jill |
|
-- |
-- |
Fix faucet leak |
|
|
-- |
-- |
Remop garage/foyer after drywall repairs from leak |
Court |
|
-- |
-- |
Some windows looking very smudged in sunlight |
Courtney |
|
-- |
-- |
Island cabinet touch up |
Kate attempted 3/20 |
|
-- |
-- |
Add bracket to base of handrail leading to the bedroom level |
Edgar |
|
-- |
-- |
Adjust closet doors upstairs |
Jill |
|
-- |
-- |
Call bathroom caulk inside/- actually chip in side splash (repair or replace) |
Hall bath - Tom |
|
-- |
-- |
Upstairs hall bathroom toilet sounded very scary when I flushed it |
Tom |
|
-- |
-- |
Patch drywall in garage at faucet leak |
Drywallers. Needs final sanding 3/22 |
|
-- |
-- |
Clean shoe mold at front and garage for inside home |
Court |
|
-- |
-- |
Wether stripping right side of front door |
Jill |
|
-- |
-- |
remove paint from all knobs, and hinges |
Painter |
|
-- |
-- |
paint tops and bottoms of doors throughout |
Painterr |
|
-- |
-- |
repaint banister at top of first set of stairs |
and second- painter |
|
-- |
-- |
Reclean skin on island |
Court |
|
-- |
-- |
Attic access needed |
|
|
-- |
-- |
Remove ladder |
Tom |
|
-- |
-- |
Touch up paint blue tape on cabinets |
Jill |
|
-- |
-- |
Crooked middle window |
|
|
-- |
-- |
2 Chios in the kitchen counter (on island) |
Chips |
|
-- |
-- |
2 chips in kitchen island granite |
3/30 - Fenco |
|
-- |
-- |
Paint posts by transformer - black |
Painter-jill is painting second set asap |
|
-- |
-- |
Driveway discoloration - Glo Fiber |
Tom - talk to Danny Beam |
|
-- |
-- |
Ratified Contract? (0) 03.27.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 03.29.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 03.27.2022 |
|
|
-- |
-- |
Association Packet Received (0) 04.02.2022 |
|
|
-- |
-- |
Selections Meeting (0) 04.13.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 04.16.2022 |
4/12/2022: sent to Maggie for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 04.18.2022 |
4/17/2022: sent to Jerry for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0) 04.16.2022 |
|
|
-- |
-- |
Building Permit (30) 07.20.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 08.29.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 09.08.2022 |
|
|
-- |
-- |
Stake Out Home (1) 07.28.2022 |
|
|
-- |
-- |
Excavate (2) 07.28.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 07.28.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 07.28.2022 |
|
|
-- |
-- |
Set Forms (2) 09.06.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 09.06.2022 |
|
|
-- |
-- |
Plumb Slab (2) 09.01.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 09.06.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1) 09.06.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 09.06.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.08.2022 |
|
|
-- |
-- |
Pour Slab (1) * 09.06.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 10.07.2022 |
|
|
-- |
-- |
Framing I (9) 09.29.2022 |
|
|
-- |
-- |
Order Steps (0) 10.10.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 10.10.2022 |
|
|
-- |
-- |
Framing II (8) 10.09.2022 |
|
|
-- |
-- |
Framing III (8) * 10.20.2022 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 12.11.2023 |
|
|
-- |
-- |
Install Stairs (0) 10.29.2022 |
|
|
-- |
-- |
Windows & Doors (0) 10.29.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 12.10.2022 |
|
|
-- |
-- |
Roofing (0) 10.29.2022 |
|
|
-- |
-- |
Order Cabinets (0) 10.11.2022 |
|
|
-- |
-- |
Order Appliances (0) 08.30.2022 |
Standard |
|
-- |
-- |
Deck (0) 10.29.2022 |
Expanded 12 x 12 Deck |
|
-- |
-- |
Gutters (0) 02.01.2023 |
|
|
-- |
-- |
Driveway (0) 12.28.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 12.07.2022 |
Standard |
|
-- |
-- |
Privacy Divider / Fence (0) 02.04.2023 |
Needs deck railings 2/1 |
|
-- |
-- |
Sod / Seed / Landscaping (0) 03.01.2023 |
|
|
-- |
-- |
HVAC Rough In (4) 10.29.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 11.07.2022 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 12.11.2023 |
|
|
-- |
-- |
Plumbing Rough In (4) 11.02.2022 |
In process 10/29 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 11.10.2022 |
|
|
-- |
-- |
Electric Rough In (4) 11.10.2022 |
In process almost completed 11/5 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 11.10.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 11.10.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 11.10.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 01.28.2023 |
In process 1/18 |
|
-- |
-- |
Exterior Stone (0) 02.08.2023 |
in process 2/4 |
|
-- |
-- |
Insulation (2) 11.12.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 11.17.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 03.08.2023 |
Tue, Mar 7 |
|
-- |
-- |
Set Electric Meter (0) 04.06.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 01.09.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 01.09.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 12.08.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 11.21.2022 |
Stocked 11/19 |
|
-- |
-- |
Loan Approval (0) 01.31.2023 |
|
|
-- |
-- |
Deed Preparation (0) 01.31.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 12.10.2022 |
Final sanding taking place 12/7 |
|
-- |
-- |
Paint 1 (1) 12.10.2022 |
|
|
-- |
-- |
Garage Door (0) 02.15.2023 |
Clean out garage |
|
-- |
-- |
House Numbers (0) 02.15.2023 |
|
|
-- |
-- |
Mailbox (0) 02.08.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 12.14.2022 |
Dec 14 |
|
-- |
-- |
Granite Installation (1) * 12.27.2022 |
|
|
-- |
-- |
Interior Trim - Install (3) 01.01.2023 |
In process 12/28 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 09.05.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 01.01.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 01.18.2023 |
In process 1/11 |
|
-- |
-- |
Luxury Vinyl Tile (0) 01.18.2023 |
In process 1/11 |
|
-- |
-- |
Paint 2 (3) 01.04.2023 |
|
|
-- |
-- |
Cover Floors (1) 01.26.2023 |
Carpet needs covered asap |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 01.16.2023 |
|
|
-- |
-- |
Shoe Moulding (0) 01.21.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 02.01.2023 |
Black accessories. In process. Needs mirrors and some shelving 1/28 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 02.01.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 01.10.2023 |
|
|
-- |
-- |
Set Water Meter (0) 01.23.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 02.11.2023 |
Black Standard- started 2/8 Neds a few outlets and al bulbs. |
|
-- |
-- |
Ceiling Fans (0) 02.04.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 02.22.2023 |
|
|
-- |
-- |
Blower Door Test (1) 10.27.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 01.18.2023 |
Black Standard |
|
-- |
-- |
Install Appliances (0) * 02.04.2023 |
Delivery 10/31- Schedule install with CJ |
|
-- |
-- |
Paint 3 (2) * 01.04.2023 |
|
|
-- |
-- |
Carpet (2) 01.18.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 03.23.2023 |
David, Valley Appraisal, Tues, Mar 21 |
|
-- |
-- |
Inspection (Final HVAC) (1) 03.22.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 03.22.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 03.22.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 03.22.2023 |
|
|
-- |
-- |
Pre Walk Through (0) 02.27.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 02.08.2023 |
In process 2/4 |
|
-- |
-- |
Cleaning (1) 03.18.2023 |
In process 3/1 |
|
-- |
-- |
Certificate of Occupancy (1) * 03.22.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 03.22.2023 |
|
|
-- |
-- |
Schedule Closing (0) 03.23.2023 |
|
|
-- |
-- |
Buyer Walk Through (1) 03.22.2023 |
Mon, Mar 20, 5:30 PM |
|
-- |
-- |
Payment for Upgrades (0) 03.05.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 02.27.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 03.23.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 12.20.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 03.18.2023 |
|
|
-- |
-- |
Closing (1) 03.23.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 03.27.2023 |
|
|