Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Add egress window to selection sheet? |
|
|
-- |
-- |
H/w treads to second level installed |
|
|
-- |
-- |
H/w treads to 2nd level |
|
|
-- |
-- |
Fix upper stairs cover |
|
|
-- |
-- |
CODED LOCKBOX 2626 |
|
|
-- |
-- |
Was rough in plumbing tub location adjusted? |
Tom. Does it have to be patched? |
|
-- |
-- |
Roof vinyl piece needed |
Davenport |
|
-- |
-- |
Mirrors |
Joe |
|
-- |
-- |
Outlet cover needed kitchen |
Electrician |
|
-- |
-- |
Ceiling fan needed in master |
Electrician |
|
-- |
-- |
Stair transition is knocked |
Knicked, Denny. It appears that somebody tried to patch it? |
|
-- |
-- |
repaint stairs |
painter |
|
-- |
-- |
Fascia on side bump out |
Davenport |
|
-- |
-- |
Cable covers needed in all garages |
Electrician |
|
-- |
-- |
Final touch up needed at stairs |
Painter |
|
-- |
-- |
Black shower drain needed |
Plumber. Still needs done 3/15 |
|
-- |
-- |
Stain on stairs |
Jill |
|
-- |
-- |
Missing aluminum behind gutter at back corner of townhouse |
Davenport |
|
-- |
-- |
Outdoor electric trim out missing |
Electrician |
|
-- |
-- |
Remove siding from garage |
Davenport |
|
-- |
-- |
Stair railings needed |
Trim guys? Painter |
|
-- |
-- |
Final touch up? |
Painter |
|
-- |
-- |
Three single electric meters |
Waiting on trough |
|
-- |
-- |
Right side of vertical trim on island needs to be cleaned or replaced. |
May 9 |
|
-- |
-- |
Escutcheon behind pedestal sink is wonkie |
Plumber - not level on base |
|
-- |
-- |
Drywall patch next to vanity light in powder bath |
In process. Needs painting. 4/5 |
|
-- |
-- |
Should the bowl on the pedestal sink because opt to the bottom part? Looks like there’s a gap |
|
|
-- |
-- |
Gap between bowl of pedestal sink and stand. Should this be caulked? |
Painter |
|
-- |
-- |
clean |
|
|
-- |
-- |
Does something need to be hooked up at the garage door opener? Lots of wires. |
Jeff - Davenport |
|
-- |
-- |
Trim out basement window |
PVC trim - Jeremy, Davenport |
|
-- |
-- |
Stain on the steps |
Painter |
|
-- |
-- |
Electric cover, needed and foyer. A few electric covers needed and foyer and light switch as well. |
Electrician |
|
-- |
-- |
Powder bath touch up light |
Painter |
|
-- |
-- |
Clean out garage and the bonus room |
Jill |
|
-- |
-- |
Install window screens |
Jill |
|
-- |
-- |
Remove paint from kitchen cabinetry |
Painter |
|
-- |
-- |
Remove black paper from the back patio |
Jill |
|
-- |
-- |
Address kitchen miters where the shoe in the cabinet trim meet on both the right and left hand side of perimeter cabinets |
Trim guy |
|
-- |
-- |
Cock inside splashes in master and hall bath vanity |
|
|
-- |
-- |
Install window screens |
|
|
-- |
-- |
Several cabinet touchups on master vanity |
Jill |
|
-- |
-- |
Paint the ceiling in bedroom number two |
Painter |
|
-- |
-- |
Adjust closet doors in bedroom number two |
Jill |
|
-- |
-- |
Fix crack in upstairs hall bath tub |
Repair scheduled for Monday may 1st |
|
-- |
-- |
Replace island right side trim and side panel for island |
May 9 |
|
-- |
-- |
Pocket door adjustment in pantry |
Edgar |
|
-- |
-- |
Finish installing the drainage pipe in the back/side yard |
Bub |
|
-- |
-- |
Pressure wash front and back |
Tom will coordinate |
|
-- |
-- |
Remove black plastic from under the siding at the back patio |
Jill |
|
-- |
-- |
Reclean services in floors after punch out complete |
Jill or Lynn |
|
-- |
-- |
Fridge panel too short on the kitchen perimeter. Does this need to be replaced or can it be covered by shoe mold? |
Edgar |
|
-- |
-- |
Caulk inside splashes in master and hall bath vanity |
Painter |
|
-- |
-- |
Clean paint off of base of cabinets in kitchen |
Jill |
|
-- |
-- |
Paint exposed exterior concrete wall |
Painter |
|
-- |
-- |
Trim metallic tape on basement bonus window |
Jill |
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Paint outside of foundation |
|
|
-- |
-- |
Final grading and sod |
|
|
-- |
-- |
Window AC unit |
|
|
-- |
-- |
Ratified Contract? (0) 04.08.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 04.13.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 04.08.2022 |
|
|
-- |
-- |
Association Packet Received (0) 04.13.2022 |
|
|
-- |
-- |
Selections Meeting (0) 04.28.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 04.30.2022 |
4/28/2022: Sent to Kristo for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 05.12.2022 |
4/30/2022: sent to Kristo for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 05.12.2022 |
|
|
-- |
-- |
Building Permit (30) 07.22.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 09.08.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 09.08.2022 |
|
|
-- |
-- |
Stake Out Home (1) 07.28.2022 |
|
|
-- |
-- |
Excavate (2) 08.08.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 08.08.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 08.08.2022 |
|
|
-- |
-- |
Set Forms (2) 08.08.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 08.15.2022 |
|
|
-- |
-- |
Plumb Slab (2) 09.06.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 09.06.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.08.2022 |
|
|
-- |
-- |
Prepare Slab (1) 09.06.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 09.08.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 10.10.2022 |
|
|
-- |
-- |
Pour Slab (1) * 09.12.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 02.01.2023 |
|
|
-- |
-- |
Framing I (9) 09.29.2022 |
|
|
-- |
-- |
Order Steps (0) 10.10.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 10.10.2022 |
|
|
-- |
-- |
Framing II (8) 10.09.2022 |
|
|
-- |
-- |
Framing III (8) * 10.17.2022 |
|
|
-- |
-- |
Install Stairs (0) 11.19.2022 |
|
|
-- |
-- |
Windows & Doors (0) 11.19.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 01.07.2023 |
|
|
-- |
-- |
Roofing (0) 11.19.2022 |
|
|
-- |
-- |
Order Cabinets (0) 11.22.2022 |
|
|
-- |
-- |
Order Appliances (0) 08.30.2022 |
Standard |
|
-- |
-- |
Deck (0) 11.19.2022 |
Standard |
|
-- |
-- |
Gutters (0) 03.06.2023 |
|
|
-- |
-- |
Driveway (0) 02.08.2023 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 01.01.2023 |
Standard |
|
-- |
-- |
Privacy Divider / Fence (0) 02.08.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 04.23.2023 |
In process 4/12 |
|
-- |
-- |
HVAC Rough In (4) 11.09.2022 |
In process 11/2 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 12.07.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 11.19.2022 |
In process 11/16 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 12.07.2022 |
11/17 |
|
-- |
-- |
Electric Rough In (4) 11.30.2022 |
almost completed 11/26 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 12.07.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 02.13.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 12.07.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 02.15.2023 |
almost completed 2/11 |
|
-- |
-- |
Exterior Stone (0) 03.15.2023 |
in process 2/25 |
|
-- |
-- |
Insulation (2) 12.07.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 12.17.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 04.06.2023 |
Hopefully Tuesday, Mar 28 |
|
-- |
-- |
Set Electric Meter (0) 04.20.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 02.13.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 02.13.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 12.08.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 12.17.2022 |
NONE |
|
-- |
-- |
Loan Approval (0) 03.05.2023 |
|
|
-- |
-- |
Deed Preparation (0) 03.05.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 01.07.2023 |
In process 1/1 |
|
-- |
-- |
Paint 1 (1) 01.07.2023 |
|
|
-- |
-- |
Garage Door (0) 03.15.2023 |
|
|
-- |
-- |
House Numbers (0) 03.01.2023 |
|
|
-- |
-- |
Mailbox (0) 02.20.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 01.07.2023 |
Jan 6 |
|
-- |
-- |
Granite Installation (1) * 01.14.2023 |
|
|
-- |
-- |
Interior Trim - Install (3) 01.18.2023 |
1/14 |
|
-- |
-- |
Interior Trim - Paint (1) 01.21.2023 |
In process 1/18 |
|
-- |
-- |
Luxury Vinyl Plank (3) * 02.01.2023 |
In process 1/28 |
|
-- |
-- |
Luxury Vinyl Tile (0) 02.01.2023 |
In process 1/28 |
|
-- |
-- |
Paint 2 (3) 01.25.2023 |
|
|
-- |
-- |
Cover Floors (1) 02.06.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 02.13.2023 |
|
|
-- |
-- |
Shoe Moulding (0) 02.08.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 02.15.2023 |
Black accessories. In process 2/11. Needs mirrors. |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 02.15.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 02.16.2023 |
|
|
-- |
-- |
Set Water Meter (0) 03.16.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 02.15.2023 |
Black Standard. In process 2/11 |
|
-- |
-- |
Ceiling Fans (0) 03.15.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 02.18.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 02.08.2023 |
Black standard. In process 2/4 |
|
-- |
-- |
Install Appliances (0) * 03.15.2023 |
Delivery 10/31- Schedule install with CJ |
|
-- |
-- |
Paint 3 (2) * 01.25.2023 |
|
|
-- |
-- |
Carpet (2) 02.01.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 03.05.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 04.22.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 04.22.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 04.22.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 04.22.2023 |
|
|
-- |
-- |
Pre Walk Through (0) 04.20.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 03.15.2023 |
In process 2/25 |
|
-- |
-- |
Cleaning (1) 04.23.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 04.25.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 04.25.2023 |
|
|
-- |
-- |
Schedule Closing (0) 05.01.2023 |
|
|
-- |
-- |
Buyer Walk Through (1) 04.25.2023 |
Monday, April 24, 11:45 AM |
|
-- |
-- |
Payment for Upgrades (0) 03.05.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 04.20.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 05.04.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 05.04.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 04.20.2023 |
|
|
-- |
-- |
Closing (1) 05.04.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 05.22.2023 |
|
|