1 33 37 89 47 73 67 55 56 59 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 26  ::  1444 Palomino Trail
[ BUILD: 20221382 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Thu    Nov 28      Verify Window & Roof Structure (0)      
Thu    Nov 28      Rough In Microwave Vent (0)      
Thu    Nov 28      Order Plumbing / Lighting Fixtures (0)      
Thu    Nov 28      Blower Door Test (1)      
--   --   Add egress window to selection sheet?
--   --   H/w treads to second level installed
--   --   H/w treads to 2nd level
--   --   Fix upper stairs cover
--   --   CODED LOCKBOX 2626
--   --   Was rough in plumbing tub location adjusted? Tom. Does it have to be patched?
--   --   Roof vinyl piece needed Davenport
--   --   Mirrors Joe
--   --   Outlet cover needed kitchen Electrician
--   --   Ceiling fan needed in master Electrician
--   --   Stair transition is knocked Knicked, Denny. It appears that somebody tried to patch it?
--   --   repaint stairs painter
--   --   Fascia on side bump out Davenport
--   --   Cable covers needed in all garages Electrician
--   --   Final touch up needed at stairs Painter
--   --   Black shower drain needed Plumber. Still needs done 3/15
--   --   Stain on stairs Jill
--   --   Missing aluminum behind gutter at back corner of townhouse Davenport
--   --   Outdoor electric trim out missing Electrician
--   --   Remove siding from garage Davenport
--   --   Stair railings needed Trim guys? Painter
--   --   Final touch up? Painter
--   --   Three single electric meters Waiting on trough
--   --   Right side of vertical trim on island needs to be cleaned or replaced. May 9
--   --   Escutcheon behind pedestal sink is wonkie Plumber - not level on base
--   --   Drywall patch next to vanity light in powder bath In process. Needs painting. 4/5
--   --   Should the bowl on the pedestal sink because opt to the bottom part? Looks like there’s a gap
--   --   Gap between bowl of pedestal sink and stand. Should this be caulked? Painter
--   --   clean
--   --   Does something need to be hooked up at the garage door opener? Lots of wires. Jeff - Davenport
--   --   Trim out basement window PVC trim - Jeremy, Davenport
--   --   Stain on the steps Painter
--   --   Electric cover, needed and foyer. A few electric covers needed and foyer and light switch as well. Electrician
--   --   Powder bath touch up light Painter
--   --   Clean out garage and the bonus room Jill
--   --   Install window screens Jill
--   --   Remove paint from kitchen cabinetry Painter
--   --   Remove black paper from the back patio Jill
--   --   Address kitchen miters where the shoe in the cabinet trim meet on both the right and left hand side of perimeter cabinets Trim guy
--   --   Cock inside splashes in master and hall bath vanity
--   --   Install window screens
--   --   Several cabinet touchups on master vanity Jill
--   --   Paint the ceiling in bedroom number two Painter
--   --   Adjust closet doors in bedroom number two Jill
--   --   Fix crack in upstairs hall bath tub Repair scheduled for Monday may 1st
--   --   Replace island right side trim and side panel for island May 9
--   --   Pocket door adjustment in pantry Edgar
--   --   Finish installing the drainage pipe in the back/side yard Bub
--   --   Pressure wash front and back Tom will coordinate
--   --   Remove black plastic from under the siding at the back patio Jill
--   --   Reclean services in floors after punch out complete Jill or Lynn
--   --   Fridge panel too short on the kitchen perimeter. Does this need to be replaced or can it be covered by shoe mold? Edgar
--   --   Caulk inside splashes in master and hall bath vanity Painter
--   --   Clean paint off of base of cabinets in kitchen Jill
--   --   Paint exposed exterior concrete wall Painter
--   --   Trim metallic tape on basement bonus window Jill
--   --   Paint touch up
--   --   Paint outside of foundation
--   --   Final grading and sod
--   --   Window AC unit
-- -- Ratified Contract? (0)  04.08.2022    
-- -- $2500 Deposit Received (0)  04.13.2022    
-- -- Association Packet Requested (0)  04.08.2022    
-- -- Association Packet Received (0)  04.13.2022    
-- -- Selections Meeting (0)  04.28.2022    
-- -- Selections Sheet Signed (0)  04.30.2022     4/28/2022: Sent to Kristo for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  05.12.2022     4/30/2022: sent to Kristo for signature
-- -- Deposit For Upgrades Received (0)  05.12.2022    
-- -- Building Permit (30)  07.22.2022    
-- -- Order Roof & Floor Trusses (1)  09.08.2022    
-- -- Order Windows & Doors (0)  09.08.2022    
-- -- Stake Out Home (1)  07.28.2022    
-- -- Excavate (2)  08.08.2022    
-- -- Inspection (Footers) (1)  08.08.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1)  08.08.2022    
-- -- Set Forms (2)  08.08.2022    
-- -- Pour Foundation Walls (1)  08.15.2022    
-- -- Plumb Slab (2)  09.06.2022    
-- -- Inspection (Plumbing Under Slab) (1)  09.06.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.08.2022    
-- -- Prepare Slab (1)  09.06.2022    
-- -- Inspection (Slab) (1)  09.08.2022    
-- -- Inspection (Drain Tile) (0)  10.10.2022    
-- -- Pour Slab (1) *   09.12.2022    
-- -- Settlement Agent Confirmed (0)  02.01.2023    
-- -- Framing I (9)  09.29.2022    
-- -- Order Steps (0)  10.10.2022    
-- -- Order Tubs / Showers (0)  10.10.2022    
-- -- Framing II (8)  10.09.2022    
-- -- Framing III (8) *   10.17.2022    
-- -- Install Stairs (0)  11.19.2022    
-- -- Windows & Doors (0)  11.19.2022    
-- -- House Number and Status in Window (0)  01.07.2023    
-- -- Roofing (0)  11.19.2022    
-- -- Order Cabinets (0)  11.22.2022    
-- -- Order Appliances (0)  08.30.2022     Standard
-- -- Deck (0)  11.19.2022     Standard
-- -- Gutters (0)  03.06.2023    
-- -- Driveway (0)  02.08.2023     Expanded Driveway
-- -- Patio (0)  01.01.2023     Standard
-- -- Privacy Divider / Fence (0)  02.08.2023    
-- -- Sod / Seed / Landscaping (0)  04.23.2023     In process 4/12
-- -- HVAC Rough In (4)  11.09.2022     In process 11/2
-- -- Inspection (Rough In HVAC) (1)  12.07.2022    
-- -- Plumbing Rough In (4)  11.19.2022     In process 11/16
-- -- Inspection (Rough In Plumbing) (1)  12.07.2022     11/17
-- -- Electric Rough In (4)  11.30.2022     almost completed 11/26
-- -- Inspection (Rough In Electric) (1)  12.07.2022    
-- -- Inspection (Deck Piers) (0)  02.13.2023    
-- -- Inspection (Framing) (1)  12.07.2022    
-- -- Exterior Vinyl (0) *   02.15.2023     almost completed 2/11
-- -- Exterior Stone (0)  03.15.2023     in process 2/25
-- -- Insulation (2)  12.07.2022    
-- -- Inspection (Insulation) (1)  12.17.2022    
-- -- Inspection (Electric Service) (0)  04.06.2023     Hopefully Tuesday, Mar 28
-- -- Set Electric Meter (0)  04.20.2023    
-- -- Inspection (Main Sewer Line) (0)  02.13.2023    
-- -- Inspection (Main Water Line) (0)  02.13.2023    
-- -- Order Interior Doors & Trim (0)  12.08.2022    
-- -- Drywall (Hang) (4) *   12.17.2022     NONE
-- -- Loan Approval (0)  03.05.2023    
-- -- Deed Preparation (0)  03.05.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   01.07.2023     In process 1/1
-- -- Paint 1 (1)  01.07.2023    
-- -- Garage Door (0)  03.15.2023    
-- -- House Numbers (0)  03.01.2023    
-- -- Mailbox (0)  02.20.2023    
-- -- Cabinet Installation (2) *   01.07.2023     Jan 6
-- -- Granite Installation (1) *   01.14.2023    
-- -- Interior Trim - Install (3)  01.18.2023     1/14
-- -- Interior Trim - Paint (1)  01.21.2023     In process 1/18
-- -- Luxury Vinyl Plank (3) *   02.01.2023     In process 1/28
-- -- Luxury Vinyl Tile (0)  02.01.2023     In process 1/28
-- -- Paint 2 (3)  01.25.2023    
-- -- Cover Floors (1)  02.06.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  02.13.2023    
-- -- Shoe Moulding (0)  02.08.2023    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  02.15.2023     Black accessories. In process 2/11. Needs mirrors.
-- -- Install Coded Lockbox (add extra keys) (0)  02.15.2023    
-- -- Pay Water / Sewer Taps (0)  02.16.2023    
-- -- Set Water Meter (0)  03.16.2023    
-- -- Electric Trim Out (3)  02.15.2023     Black Standard. In process 2/11
-- -- Ceiling Fans (0)  03.15.2023    
-- -- HVAC Trim Out (1)  02.18.2023    
-- -- Plumbing Trim Out (2)  02.08.2023     Black standard. In process 2/4
-- -- Install Appliances (0) *   03.15.2023     Delivery 10/31- Schedule install with CJ
-- -- Paint 3 (2) *   01.25.2023    
-- -- Carpet (2)  02.01.2023    
-- -- Appraiser Confirms Construction Completion (0)  03.05.2023    
-- -- Inspection (Final HVAC) (1)  04.22.2023    
-- -- Inspection (Final Plumbing) (1)  04.22.2023    
-- -- Inspection (Final Electric) (1)  04.22.2023    
-- -- Inspection (Final Building) (2) *   04.22.2023    
-- -- Pre Walk Through (0)  04.20.2023    
-- -- Stain Hardwood Stairs (1)  03.15.2023     In process 2/25
-- -- Cleaning (1)  04.23.2023    
-- -- Certificate of Occupancy (1) *   04.25.2023    
-- -- C.O. to Lender (0)  04.25.2023    
-- -- Schedule Closing (0)  05.01.2023    
-- -- Buyer Walk Through (1)  04.25.2023     Monday, April 24, 11:45 AM
-- -- Payment for Upgrades (0)  03.05.2023    
-- -- Keys to Settlement Agent (0)  04.20.2023    
-- -- Review Settlement Statement (0)  05.04.2023    
-- -- Jerry Signs Closing Documents (0)  05.04.2023    
-- -- Request Trash Tote From POA Manager (0)  04.20.2023    
-- -- Closing (1)  05.04.2023     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  05.22.2023