| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room | ||||
| Finished Bonus Bath | ||||
| White Kitchen Cabinetry | ||||
| Double Waste Basket ($470) Spice Rack ($310) Three Drawer Stack ($390) Crown Moulding ($630) | ||||
| Coffee Bar (just like model) glass shelves, and crown to ceiling | ||||
| Quartz Level 1 | ||||
| Farmhouse Sink | ||||
| Stained Oak Treads to Bedroom Level | ||||
| White subway tile walls with white pan | ||||
| Heavy Glass shower door with black trim | ||||
| Amendment to increase price by $30,470 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 07.28.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 09.08.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.08.2022 | ||
| -- | -- | Inspection (Slab) (1) 09.22.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.22.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 11.26.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 12.14.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 12.14.2022 | ||
| -- | -- | Inspection (Framing) (1) * 12.14.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 03.16.2023 | ||
| -- | -- | Inspection (Insulation) (1) 12.15.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 04.05.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 03.16.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 03.16.2023 | ||
| -- | -- | Inspection (Final HVAC) (0) 04.08.2023 | ||
| -- | -- | Inspection (Final Plumbing) (0) 04.08.2023 | ||
| -- | -- | Inspection (Final Electric) (0) 04.08.2023 | ||
| -- | -- | Inspection (Final Building) (4) * 04.08.2023 | ||