130 ADDR
CONGERS-2 - 106  ::  1449 Palomino Trail
[ BUILD: 20221343 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
Sat    May 16      Inspection (Footers) (1)  07.28.2022    
    Finished Bonus Bath  
    Farmhouse Sink  
    White subway tile walls with white pan  
    Heavy Glass shower door with black trim  
CRITICAL PATH
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Finished Bonus Room  
    White Kitchen Cabinetry  
    Double Waste Basket ($470) Spice Rack ($310) Three Drawer Stack ($390) Crown Moulding ($630)  
    Coffee Bar (just like model) glass shelves, and crown to ceiling  
    Quartz Level 1  
    Stained Oak Treads to Bedroom Level  
    Amendment to increase price by $30,470  
CRITICAL PATH - COMPLETED
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Inspection (Plumbing Under Slab) (1)  09.08.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.08.2022    
-- -- Inspection (Slab) (1)  09.22.2022    
-- -- Inspection (Drain Tile) (0)  09.22.2022    
-- -- Inspection (Rough In HVAC) (1)  11.26.2022    
-- -- Inspection (Rough In Plumbing) (1)  12.14.2022    
-- -- Inspection (Rough In Electric) (1)  12.14.2022    
-- -- Inspection (Framing) (1) *   12.14.2022    
-- -- Inspection (Deck Piers) (0)  03.16.2023    
-- -- Inspection (Insulation) (1)  12.15.2022    
-- -- Inspection (Electric Service) (0)  04.05.2023    
-- -- Inspection (Main Sewer Line) (0)  03.16.2023    
-- -- Inspection (Main Water Line) (0)  03.16.2023    
-- -- Inspection (Final HVAC) (0)  04.08.2023    
-- -- Inspection (Final Plumbing) (0)  04.08.2023    
-- -- Inspection (Final Electric) (0)  04.08.2023    
-- -- Inspection (Final Building) (4) *   04.08.2023