37 ADDR
CONGERS-2 - 106  ::  1449 Palomino Trail
[ BUILD: 20221343 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Finished Bonus Room  
    Finished Bonus Bath  
    White Kitchen Cabinetry  
    Double Waste Basket ($470) Spice Rack ($310) Three Drawer Stack ($390) Crown Moulding ($630)  
    Coffee Bar (just like model) glass shelves, and crown to ceiling  
    Quartz Level 1  
    Farmhouse Sink  
    Stained Oak Treads to Bedroom Level  
    White subway tile walls with white pan  
    Heavy Glass shower door with black trim  
    Amendment to increase price by $30,470  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  07.28.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Inspection (Plumbing Under Slab) (1)  09.08.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.08.2022    
-- -- Inspection (Slab) (1)  09.22.2022    
-- -- Inspection (Drain Tile) (0)  09.22.2022    
-- -- Inspection (Rough In HVAC) (1)  11.26.2022    
-- -- Inspection (Rough In Plumbing) (1)  12.14.2022    
-- -- Inspection (Rough In Electric) (1)  12.14.2022    
-- -- Inspection (Framing) (1) *   12.14.2022    
-- -- Inspection (Deck Piers) (0)  03.16.2023    
-- -- Inspection (Insulation) (1)  12.15.2022    
-- -- Inspection (Electric Service) (0)  04.05.2023    
-- -- Inspection (Main Sewer Line) (0)  03.16.2023    
-- -- Inspection (Main Water Line) (0)  03.16.2023    
-- -- Inspection (Final HVAC) (0)  04.08.2023    
-- -- Inspection (Final Plumbing) (0)  04.08.2023    
-- -- Inspection (Final Electric) (0)  04.08.2023    
-- -- Inspection (Final Building) (4) *   04.08.2023