| Sun | Nov 2 | Verify Window & Roof Structure (0) | ||
| Sun | Nov 2 | Rough In Microwave Vent (0) | ||
| Sun | Nov 2 | Order Plumbing / Lighting Fixtures (0) | ||
| Sun | Nov 2 | Blower Door Test (1) | ||
| -- | -- | Replace broken bedroom window 12/28 | ||
| -- | -- | REUSING THE CULTURED MARBLE FROM LOT 112 WHICH HAS BEEN STORED | ||
| -- | -- | Side splash needed master vanity | Tom, Fred | |
| -- | -- | Rate lock expires 4/15 | ||
| -- | -- | Very large creak in floor at top of third floor staircase | Tom | |
| -- | -- | Patch hole in garage floor | Tom | |
| -- | -- | Black shower drain | Plumber | |
| -- | -- | Needs lots of lightbulbs | Electrician | |
| -- | -- | Needs bonus room, light fixture | Electrician | |
| -- | -- | Hall bath receptacle needed cover | Electrician | |
| -- | -- | Mirrors needed throughout | Joe | |
| -- | -- | Living room ceiling fan needed | Electrician | |
| -- | -- | Can we get other color receptacles for the side of the kitchen island? | Electrician | |
| -- | -- | Snap play needed above master tub | ||
| -- | -- | Snap light needed above master tub | Electrician | |
| -- | -- | Lots of appliance trash in the garage | ||
| -- | -- | Light switch cover needed in garage | Electrician | |
| -- | -- | CODED LOCKBOX 0100 | ||
| -- | -- | Door plugs | Jill | |
| -- | -- | Trim, bonus room door | Trim | |
| -- | -- | Clean off basement back deck | Tom | |
| -- | -- | Move patio door out of kitchen | ||
| -- | -- | Basement mirror needed | Mon, Apr 24 | |
| -- | -- | Paint touchup garage | Painter | |
| -- | -- | Change out the bonus room light | Electrician | |
| -- | -- | Sweep off deck | ||
| -- | -- | Get a new screen door bonus room | ||
| -- | -- | Caulk inside splashes in upstairs bathroom | Painter | |
| -- | -- | Paint touchup throughout | Painter | |
| -- | -- | Power wash front and back | Jill will coordinate | |
| -- | -- | Ratified Contract? (0) 05.26.2022 | ||
| Amendment to increase price by $22,220 | ||||
| -- | -- | $2500 Deposit Received (0) 05.28.2022 | ||
| -- | -- | Association Packet Requested (0) 05.26.2022 | ||
| -- | -- | Association Packet Received (0) 06.03.2022 | ||
| -- | -- | Selections Meeting (0) 07.16.2022 | ||
| -- | -- | Selections Sheet Signed (0) 07.27.2022 | 7/25: sent to Pam for signatures | |
| -- | -- | Amendment for Upgrades (B,S,L,T,BCP) (0) 08.05.2022 | 7/27: sent to Pam for signatures | |
| -- | -- | Deposit For Upgrades Received (0) 08.04.2022 | ||
| -- | -- | Building Permit (30) * 08.15.2022 | ||
| -- | -- | Order Roof & Floor Trusses (1) 11.03.2022 | ||
| -- | -- | Order Windows & Doors (0) 11.03.2022 | ||
| -- | -- | Stake Out Home (1) 09.22.2022 | ||
| -- | -- | Excavate (2) 09.29.2022 | ||
| -- | -- | Inspection (Footers) (1) 09.29.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 10.31.2022 | ||
| -- | -- | Pour Footers (1) * 09.29.2022 | ||
| -- | -- | Set Forms (2) 10.31.2022 | ||
| -- | -- | Pour Foundation Walls (1) 10.31.2022 | ||
| -- | -- | Plumb Slab (2) 10.31.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 10.31.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 10.31.2022 | ||
| -- | -- | Prepare Slab (1) 10.31.2022 | ||
| -- | -- | Inspection (Slab) (1) 10.31.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 10.10.2022 | ||
| -- | -- | Pour Slab (1) * 10.31.2022 | ||
| -- | -- | Settlement Agent Confirmed (0) 05.28.2022 | ||
| -- | -- | Framing I (9) 11.17.2022 | ||
| -- | -- | Order Steps (0) 12.08.2022 | ||
| -- | -- | Order Tubs / Showers (0) 10.10.2022 | ||
| -- | -- | Framing II (8) 12.05.2022 | ||
| -- | -- | Framing III (8) * 12.07.2022 | ||
| -- | -- | Install Stairs (0) * 12.28.2022 | ||
| -- | -- | Windows & Doors (0) * 12.28.2022 | ||
| -- | -- | House Number and Status in Window (0) 01.02.2023 | ||
| -- | -- | Roofing (0) * 12.28.2022 | ||
| -- | -- | Order Cabinets (0) 12.30.2022 | ||
| -- | -- | Order Appliances (0) 08.30.2022 | Standard SS | |
| -- | -- | Deck (0) 01.07.2023 | Expanded 12 x 18 Deck | |
| 12x18 Deck | ||||
| -- | -- | Gutters (0) 03.01.2023 | ||
| -- | -- | Driveway (0) * 03.15.2023 | Expanded Driveway | |
| Expanded Driveway | ||||
| -- | -- | Patio (0) 01.21.2023 | Expanded 10 x 10 Patio Below Deck | |
| 10 x 10 Patio under Deck | ||||
| -- | -- | Privacy Divider / Fence (0) * 03.01.2023 | ||
| -- | -- | Sod / Seed / Landscaping (0) 04.23.2023 | ||
| -- | -- | HVAC Rough In (4) 01.04.2023 | ||
| -- | -- | Plumbing Rough In (4) 01.11.2023 | In process 1/7 | |
| -- | -- | Electric Rough In (4) 01.21.2023 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 01.12.2023 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 01.12.2023 | ||
| -- | -- | Inspection (Rough In Electric) (1) 01.26.2023 | ||
| -- | -- | Inspection (Framing) (1) * 01.26.2023 | ||
| -- | -- | Inspection (Deck Piers) (0) 03.16.2023 | ||
| -- | -- | Exterior Vinyl (0) * 03.01.2023 | in process 3/1 | |
| -- | -- | Exterior Stone (0) 04.01.2023 | ||
| -- | -- | Insulation (2) * 01.26.2023 | ||
| -- | -- | Inspection (Insulation) (1) 02.01.2023 | ||
| -- | -- | Inspection (Electric Service) (0) 04.06.2023 | ||
| -- | -- | Set Electric Meter (0) * 04.20.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 03.20.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 03.20.2023 | ||
| -- | -- | Order Interior Doors & Trim (0) 03.16.2023 | ||
| -- | -- | Drywall (Hang) (4) * 02.01.2023 | Finish Bonus Room, Bonus Bath | |
| Finish Bonus Room | ||||
| Finish Bonus Bath | ||||
| -- | -- | Loan Approval (0) 06.14.2022 | Erin Chiles | |
| -- | -- | Deed Preparation (0) 03.18.2023 | ||
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * 02.11.2023 | In process 2/8 | |
| -- | -- | Paint 1 (1) 02.11.2023 | ||
| -- | -- | Garage Door (0) 03.18.2023 | ||
| -- | -- | House Numbers (0) 04.05.2023 | ||
| -- | -- | Mailbox (0) 04.03.2023 | ||
| -- | -- | Cabinet Installation (2) * 02.15.2023 | In process 2/11 | |
| White Kitchen Cabinetry | ||||
| -- | -- | Granite Installation (1) * 02.22.2023 | ||
| -- | -- | Interior Trim - Install (3) * 03.15.2023 | In process 3/8 | |
| -- | -- | Interior Trim - Paint (1) 03.15.2023 | ||
| -- | -- | Luxury Vinyl Plank (3) * 03.29.2023 | In process 3/25 | |
| -- | -- | Luxury Vinyl Tile (0) 03.29.2023 | In process 3/25 | |
| -- | -- | Paint 2 (3) 03.18.2023 | ||
| -- | -- | Cover Floors (1) 04.01.2023 | ||
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) 03.20.2023 | ||
| -- | -- | Shoe Moulding (0) 04.01.2023 | ||
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * 04.12.2023 | Black accessories, Bonus bath. In process 4/10 | |
| -- | -- | Install Coded Lockbox (add extra keys) (0) 04.20.2023 | ||
| -- | -- | Pay Water / Sewer Taps (0) 03.16.2023 | ||
| -- | -- | Set Water Meter (0) * 03.27.2023 | ||
| -- | -- | Electric Trim Out (3) * 04.12.2023 | Black lighting. In process 4/10 | |
| -- | -- | Ceiling Fans (0) 04.12.2023 | ||
| Living Room Ceiling Fan | ||||
| -- | -- | HVAC Trim Out (1) * 03.25.2023 | ||
| -- | -- | Plumbing Trim Out (2) * 04.05.2023 | Black plumbingg. In process 4/1 | |
| -- | -- | Install Appliances (0) * 04.19.2023 | Delivery 10/31- Schedule install with CJ | |
| -- | -- | Paint 3 (2) * 03.22.2023 | ||
| -- | -- | Carpet (2) 03.29.2023 | In process 3/25 | |
| -- | -- | Appraiser Confirms Construction Completion (0) 04.28.2023 | ||
| -- | -- | Inspection (Final HVAC) (1) 04.26.2023 | Reinspect Tues, Apr 25 | |
| -- | -- | Inspection (Final Plumbing) (1) 04.26.2023 | ||
| -- | -- | Inspection (Final Electric) (1) 04.26.2023 | ||
| -- | -- | Inspection (Final Building) (2) * 04.26.2023 | ||
| -- | -- | Pre Walk Through (0) 04.23.2023 | ||
| -- | -- | Stain Hardwood Stairs (1) * 04.05.2023 | ||
| -- | -- | Cleaning (1) 04.23.2023 | ||
| -- | -- | Certificate of Occupancy (1) * 04.28.2023 | ||
| -- | -- | C.O. to Lender (0) 04.28.2023 | ||
| -- | -- | Schedule Closing (0) 04.28.2023 | ||
| -- | -- | Buyer Walk Through (1) * 04.25.2023 | Mon, Apr 24 at 1:00 PM | |
| -- | -- | Payment for Upgrades (0) 04.28.2023 | ||
| -- | -- | Keys to Settlement Agent (0) 04.28.2023 | ||
| -- | -- | Review Settlement Statement (0) 04.28.2023 | ||
| -- | -- | Jerry Signs Closing Documents (0) 12.20.2022 | ||
| -- | -- | Request Trash Tote From POA Manager (0) 04.20.2023 | ||
| -- | -- | Closing (1) 04.28.2023 | Brittany @ West View Title | |
| -- | -- | Remove Coded Lockbox (0) 05.01.2023 | ||