37 ADDR
CONGERS-2 - 101  ::  1475 Palomino Trail
[ BUILD: 20221539 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Finish Bonus Room  
    Expanded Driveway  
    Expanded Deck 12 x 12  
    Painted white perimeter cabinetry in kitchen  
    Level III Quartz Countertop in Kitchen  
    Coffee bar (just like model) glass shelves, and crown to ceiling (in Burlap stain)  
    Farmhouse Sink  
    French Model Refrigerator  
    Three Drawer Stack  
    Spice Rack in Base 9  
    Microwave vented to exterior  
    Ship Lap Living Room Wall  
    White subway tile walls Master Bathroom  
    Heavy Glass Shower Door For Master  
    Painted Steps to bedroom level  
    LVP in Upstairs Hall and Bedrooms  
    LVP in Bonus Room  
    Finish Bonus Bathroom  
    Eggshell Paint  
    Roll Out Trays (4) in Pantry  
    Roll Out Trays (2) in B 36  
    Amendment to increase price by $41,270  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  09.29.2022    
-- -- Inspection (Concrete Wall) (1)  10.31.2022    
-- -- Inspection (Plumbing Under Slab) (1)  10.31.2022    
-- -- Inspection (Conduit Under Slab) (1)  10.31.2022    
-- -- Inspection (Slab) (1)  10.31.2022    
-- -- Inspection (Drain Tile) (0)  10.10.2022    
-- -- Inspection (Rough In HVAC) (1)  12.28.2022    
-- -- Inspection (Rough In Plumbing) (1)  01.12.2023    
-- -- Inspection (Rough In Electric) (1)  01.21.2023    
-- -- Inspection (Framing) (1) *   01.21.2023    
-- -- Inspection (Deck Piers) (0)  03.16.2023    
-- -- Inspection (Insulation) (1)  01.26.2023    
-- -- Inspection (Electric Service) (0)  04.06.2023    
-- -- Inspection (Main Sewer Line) (0)  03.20.2023    
-- -- Inspection (Main Water Line) (0)  03.20.2023    
-- -- Inspection (Final HVAC) (0)  04.26.2023     Mon, Apr 24
-- -- Inspection (Final Plumbing) (0)  04.26.2023    
-- -- Inspection (Final Electric) (0)  04.26.2023    
-- -- Inspection (Final Building) (4) *   04.26.2023