Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Dented tub? Ok? |
Tub repair person |
|
-- |
-- |
Bath wall stud missing? |
|
|
-- |
-- |
Garage door |
Davenport |
|
-- |
-- |
Hall bathtub framing issue? |
Painter |
|
-- |
-- |
Hall bath ceiling needs resending |
Painter or Drywall |
|
-- |
-- |
Ryan OOT May 24-28, Jun 17-29 |
|
|
-- |
-- |
Drywall repair near patio door |
Drywall |
|
-- |
-- |
Black shower drain |
Plumber |
|
-- |
-- |
HVAC covers needed throughout |
HVAC |
|
-- |
-- |
Dented white aluminum on front porch overhang |
Jeremy, Davenport |
|
-- |
-- |
Blemish on the front of the porch overhang |
|
|
-- |
-- |
Tell Ryan when 10 days out (so buyer can move money) |
|
|
-- |
-- |
Tell Ryan when 10 days out |
so buyer can move money |
|
-- |
-- |
CODED LOCKBOX 9797 |
|
|
-- |
-- |
Put electrical light back up in powder bath |
Electrician |
|
-- |
-- |
Put trim in front of hall bath tub |
Henry. Trim is in bedroom. |
|
-- |
-- |
Electric covers needed in garage |
Electrician |
|
-- |
-- |
Weatherstripping needed |
Back door, Jill |
|
-- |
-- |
Whiteboards needed on all back decks |
Tom |
|
-- |
-- |
Small vinyl piece missing on deck |
Jeremy, Davenport |
|
-- |
-- |
Weatherstripping |
|
|
-- |
-- |
Better secure transition strip at landing- oak stairs |
Denny |
|
-- |
-- |
Attic access, door needs paint, touchup, and to be put in place |
Painter |
|
-- |
-- |
If touch up painting is completed, can painters put the handrails up |
Painter |
|
-- |
-- |
Caulk, bathroom side splash in hall bath |
Painter |
|
-- |
-- |
Sweep stairs and foyer |
Lynn |
|
-- |
-- |
Clean off counters |
Lynn |
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Adjust pantry pocket door |
Edgar |
|
-- |
-- |
Set attic access panel |
Jill |
|
-- |
-- |
Paint touch up |
Painter |
|
-- |
-- |
Did not access 7/1 blinds installed |
|
|
-- |
-- |
Ratified Contract? (0) 01.11.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 01.20.2023 |
|
|
-- |
-- |
Association Packet Requested (0) 01.11.2023 |
|
|
-- |
-- |
Association Packet Received (0) 01.14.2023 |
|
|
-- |
-- |
Selections Meeting (0) 02.13.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0) 02.16.2023 |
|
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 03.07.2023 |
|
|
-- |
-- |
Deposit For Upgrades Received (0) 03.07.2023 |
|
|
-- |
-- |
Building Permit (30) 10.06.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 11.03.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 11.03.2022 |
|
|
-- |
-- |
Stake Out Home (1) 10.06.2022 |
|
|
-- |
-- |
Excavate (2) 10.06.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.06.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 11.10.2022 |
|
|
-- |
-- |
Pour Footers (1) 10.06.2022 |
|
|
-- |
-- |
Set Forms (2) 11.10.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 11.10.2022 |
|
|
-- |
-- |
Plumb Slab (2) 11.10.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 11.10.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 11.10.2022 |
|
|
-- |
-- |
Prepare Slab (1) 11.17.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 11.19.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 12.27.2022 |
|
|
-- |
-- |
Pour Slab (1) * 11.19.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.13.2023 |
|
|
-- |
-- |
Framing I (9) 12.05.2022 |
|
|
-- |
-- |
Order Steps (0) 01.12.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 01.12.2023 |
|
|
-- |
-- |
Framing II (8) 12.27.2022 |
|
|
-- |
-- |
Framing III (8) * 01.02.2023 |
|
|
-- |
-- |
Install Stairs (0) 01.12.2023 |
|
|
-- |
-- |
Windows & Doors (0) 01.12.2023 |
|
|
-- |
-- |
House Number and Status in Window (0) 02.23.2023 |
|
|
-- |
-- |
Roofing (0) 01.12.2023 |
|
|
-- |
-- |
Order Cabinets (0) 02.23.2023 |
|
|
-- |
-- |
Order Appliances (0) 05.06.2023 |
Standard SS |
|
-- |
-- |
Deck (0) 04.12.2023 |
|
|
-- |
-- |
Gutters (0) 03.22.2023 |
|
|
-- |
-- |
Driveway (0) 04.05.2023 |
|
|
-- |
-- |
Patio (0) 04.05.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 05.06.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 06.03.2023 |
|
|
-- |
-- |
HVAC Rough In (4) 01.14.2023 |
In process 1/7 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 02.10.2023 |
|
|
-- |
-- |
Plumbing Rough In (4) 02.01.2023 |
In process 1/25 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 02.10.2023 |
|
|
-- |
-- |
Electric Rough In (4) 02.04.2023 |
In process 2/1 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 02.10.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 02.10.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 03.22.2023 |
|
|
-- |
-- |
Exterior Stone (0) 03.22.2023 |
|
|
-- |
-- |
Insulation (2) 02.11.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1) 02.13.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 06.01.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 06.14.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 03.20.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 03.20.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 04.11.2023 |
|
|
-- |
-- |
Drywall (Hang) (4) * 02.15.2023 |
|
|
-- |
-- |
Loan Approval (0) 05.04.2023 |
|
|
-- |
-- |
Deed Preparation (0) 05.04.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 03.01.2023 |
In process 2/22 |
|
-- |
-- |
Paint 1 (1) 03.05.2023 |
|
|
-- |
-- |
Garage Door (0) 04.05.2023 |
|
|
-- |
-- |
House Numbers (0) 05.06.2023 |
|
|
-- |
-- |
Mailbox (0) 05.03.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 04.01.2023 |
Sat, April 1 |
|
-- |
-- |
Granite Installation (1) * 04.19.2023 |
|
|
-- |
-- |
Interior Trim - Install (3) 04.05.2023 |
On site 3/29 |
|
-- |
-- |
Interior Trim - Paint (1) 04.10.2023 |
In process 4/5 |
|
-- |
-- |
Luxury Vinyl Plank (3) * 04.15.2023 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 04.15.2023 |
|
|
-- |
-- |
Paint 2 (3) 03.15.2023 |
|
|
-- |
-- |
Cover Floors (1) 04.23.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 04.11.2023 |
|
|
-- |
-- |
Shoe Moulding (0) 04.19.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 05.10.2023 |
In process 5/6 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 05.17.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 05.01.2023 |
|
|
-- |
-- |
Set Water Meter (0) 05.08.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 05.06.2023 |
In process 5/3. Needs a few smoke detectors installed |
|
-- |
-- |
Ceiling Fans (0) 05.03.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 04.10.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 04.23.2023 |
In process 4/19 |
|
-- |
-- |
Install Appliances (0) * 05.10.2023 |
|
|
-- |
-- |
Paint 3 (2) * 04.10.2023 |
|
|
-- |
-- |
Carpet (2) 04.15.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 06.14.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 06.21.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 06.21.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 06.21.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 06.21.2023 |
June 22 |
|
-- |
-- |
Pre Walk Through (0) 06.22.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 04.26.2023 |
In process 4/23 |
|
-- |
-- |
Cleaning (1) 06.26.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 06.23.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 06.23.2023 |
|
|
-- |
-- |
Schedule Closing (0) 06.16.2023 |
|
|
-- |
-- |
Buyer Walk Through (1) 06.26.2023 |
Friday, June 23 at 9AM |
|
-- |
-- |
Payment for Upgrades (0) 06.16.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 06.21.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 06.16.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 05.11.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 06.22.2023 |
|
|
-- |
-- |
Closing (1) 06.26.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 07.10.2023 |
|
|