| Sun | Nov 2 | Verify Window & Roof Structure (0) | ||
| Sun | Nov 2 | Rough In Microwave Vent (0) | ||
| Sun | Nov 2 | Order Plumbing / Lighting Fixtures (0) | ||
| Sun | Nov 2 | Blower Door Test (1) | ||
| -- | -- | Dented tub? Ok? | Tub repair person | |
| -- | -- | Bath wall stud missing? | ||
| -- | -- | Garage door | Davenport | |
| -- | -- | Hall bathtub framing issue? | Painter | |
| -- | -- | Hall bath ceiling needs resending | Painter or Drywall | |
| -- | -- | Ryan OOT May 24-28, Jun 17-29 | ||
| -- | -- | Drywall repair near patio door | Drywall | |
| -- | -- | Black shower drain | Plumber | |
| -- | -- | HVAC covers needed throughout | HVAC | |
| -- | -- | Dented white aluminum on front porch overhang | Jeremy, Davenport | |
| -- | -- | Blemish on the front of the porch overhang | ||
| -- | -- | Tell Ryan when 10 days out (so buyer can move money) | ||
| -- | -- | Tell Ryan when 10 days out | so buyer can move money | |
| -- | -- | CODED LOCKBOX 9797 | ||
| -- | -- | Put electrical light back up in powder bath | Electrician | |
| -- | -- | Put trim in front of hall bath tub | Henry. Trim is in bedroom. | |
| -- | -- | Electric covers needed in garage | Electrician | |
| -- | -- | Weatherstripping needed | Back door, Jill | |
| -- | -- | Whiteboards needed on all back decks | Tom | |
| -- | -- | Small vinyl piece missing on deck | Jeremy, Davenport | |
| -- | -- | Weatherstripping | ||
| -- | -- | Better secure transition strip at landing- oak stairs | Denny | |
| -- | -- | Attic access, door needs paint, touchup, and to be put in place | Painter | |
| -- | -- | If touch up painting is completed, can painters put the handrails up | Painter | |
| -- | -- | Caulk, bathroom side splash in hall bath | Painter | |
| -- | -- | Sweep stairs and foyer | Lynn | |
| -- | -- | Clean off counters | Lynn | |
| -- | -- | Clean out garage | Jill | |
| -- | -- | Adjust pantry pocket door | Edgar | |
| -- | -- | Set attic access panel | Jill | |
| -- | -- | Paint touch up | Painter | |
| -- | -- | Did not access 7/1 blinds installed | ||
| -- | -- | Ratified Contract? (0) 01.11.2023 | ||
| Garage Keypad | ||||
| Expanded Driveway | ||||
| Amendment to increase price by $1,420 | ||||
| -- | -- | $2500 Deposit Received (0) 01.20.2023 | ||
| -- | -- | Association Packet Requested (0) 01.11.2023 | ||
| -- | -- | Association Packet Received (0) 01.14.2023 | ||
| -- | -- | Selections Meeting (0) 02.13.2023 | ||
| -- | -- | Selections Sheet Signed (0) 02.16.2023 | ||
| -- | -- | Amendment for Upgrades (B,S,L,T,BCP) (0) 03.07.2023 | ||
| -- | -- | Deposit For Upgrades Received (0) 03.07.2023 | ||
| -- | -- | Building Permit (30) * 10.06.2022 | ||
| -- | -- | Order Roof & Floor Trusses (1) 11.03.2022 | ||
| -- | -- | Order Windows & Doors (0) 11.03.2022 | ||
| -- | -- | Stake Out Home (1) 10.06.2022 | ||
| -- | -- | Excavate (2) 10.06.2022 | ||
| -- | -- | Inspection (Footers) (1) 10.06.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 11.10.2022 | ||
| -- | -- | Pour Footers (1) * 10.06.2022 | ||
| -- | -- | Set Forms (2) 11.10.2022 | ||
| -- | -- | Pour Foundation Walls (1) 11.10.2022 | ||
| -- | -- | Plumb Slab (2) 11.10.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 11.10.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 11.10.2022 | ||
| -- | -- | Prepare Slab (1) 11.17.2022 | ||
| -- | -- | Inspection (Slab) (1) 11.19.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 12.27.2022 | ||
| -- | -- | Pour Slab (1) * 11.19.2022 | ||
| -- | -- | Settlement Agent Confirmed (0) 01.13.2023 | ||
| -- | -- | Framing I (9) 12.05.2022 | ||
| -- | -- | Order Steps (0) 01.12.2023 | ||
| -- | -- | Order Tubs / Showers (0) 01.12.2023 | ||
| -- | -- | Framing II (8) 12.27.2022 | ||
| -- | -- | Framing III (8) * 01.02.2023 | ||
| -- | -- | Install Stairs (0) * 01.12.2023 | ||
| -- | -- | Windows & Doors (0) * 01.12.2023 | ||
| -- | -- | House Number and Status in Window (0) 02.23.2023 | ||
| -- | -- | Roofing (0) * 01.12.2023 | ||
| -- | -- | Order Cabinets (0) 02.23.2023 | ||
| -- | -- | Order Appliances (0) 05.06.2023 | Standard SS | |
| -- | -- | Deck (0) 04.12.2023 | ||
| -- | -- | Gutters (0) 03.22.2023 | ||
| -- | -- | Driveway (0) * 04.05.2023 | ||
| -- | -- | Patio (0) 04.05.2023 | ||
| -- | -- | Privacy Divider / Fence (0) * 05.06.2023 | ||
| -- | -- | Sod / Seed / Landscaping (0) 06.03.2023 | ||
| -- | -- | HVAC Rough In (4) 01.14.2023 | In process 1/7 | |
| -- | -- | Plumbing Rough In (4) 02.01.2023 | In process 1/25 | |
| -- | -- | Electric Rough In (4) 02.04.2023 | In process 2/1 | |
| -- | -- | Inspection (Rough In HVAC) (1) 02.10.2023 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 02.10.2023 | ||
| -- | -- | Inspection (Rough In Electric) (1) 02.10.2023 | ||
| -- | -- | Inspection (Framing) (1) * 02.10.2023 | ||
| -- | -- | Inspection (Deck Piers) (0) 04.11.2023 | ||
| -- | -- | Exterior Vinyl (0) * 03.22.2023 | ||
| -- | -- | Exterior Stone (0) 03.22.2023 | ||
| -- | -- | Insulation (2) * 02.11.2023 | ||
| -- | -- | Inspection (Insulation) (1) 02.13.2023 | ||
| -- | -- | Inspection (Electric Service) (0) 06.01.2023 | ||
| -- | -- | Set Electric Meter (0) * 06.14.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 03.20.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 03.20.2023 | ||
| -- | -- | Order Interior Doors & Trim (0) 04.11.2023 | ||
| -- | -- | Drywall (Hang) (4) * 02.15.2023 | ||
| -- | -- | Loan Approval (0) 05.04.2023 | ||
| -- | -- | Deed Preparation (0) 05.04.2023 | ||
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * 03.01.2023 | In process 2/22 | |
| -- | -- | Paint 1 (1) 03.05.2023 | ||
| -- | -- | Garage Door (0) 04.05.2023 | ||
| -- | -- | House Numbers (0) 05.06.2023 | ||
| -- | -- | Mailbox (0) 05.03.2023 | ||
| -- | -- | Cabinet Installation (2) * 04.01.2023 | Sat, April 1 | |
| -- | -- | Granite Installation (1) * 04.19.2023 | ||
| -- | -- | Interior Trim - Install (3) * 04.05.2023 | On site 3/29 | |
| -- | -- | Interior Trim - Paint (1) 04.10.2023 | In process 4/5 | |
| -- | -- | Luxury Vinyl Plank (3) * 04.15.2023 | ||
| -- | -- | Luxury Vinyl Tile (0) 04.15.2023 | ||
| -- | -- | Paint 2 (3) 03.15.2023 | ||
| -- | -- | Cover Floors (1) 04.23.2023 | ||
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) 04.11.2023 | ||
| -- | -- | Shoe Moulding (0) 04.19.2023 | ||
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * 05.10.2023 | In process 5/6 | |
| -- | -- | Install Coded Lockbox (add extra keys) (0) 05.17.2023 | ||
| -- | -- | Pay Water / Sewer Taps (0) 05.01.2023 | ||
| -- | -- | Set Water Meter (0) * 05.08.2023 | ||
| -- | -- | Electric Trim Out (3) * 05.06.2023 | In process 5/3. Needs a few smoke detectors installed | |
| -- | -- | Ceiling Fans (0) 05.03.2023 | ||
| -- | -- | HVAC Trim Out (1) * 04.10.2023 | ||
| -- | -- | Plumbing Trim Out (2) * 04.23.2023 | In process 4/19 | |
| -- | -- | Install Appliances (0) * 05.10.2023 | ||
| -- | -- | Paint 3 (2) * 04.10.2023 | ||
| -- | -- | Carpet (2) 04.15.2023 | ||
| -- | -- | Appraiser Confirms Construction Completion (0) 06.14.2023 | ||
| -- | -- | Inspection (Final HVAC) (1) 06.21.2023 | ||
| -- | -- | Inspection (Final Plumbing) (1) 06.21.2023 | ||
| -- | -- | Inspection (Final Electric) (1) 06.21.2023 | ||
| -- | -- | Inspection (Final Building) (2) * 06.21.2023 | June 22 | |
| -- | -- | Pre Walk Through (0) 06.22.2023 | ||
| -- | -- | Stain Hardwood Stairs (1) * 04.26.2023 | In process 4/23 | |
| -- | -- | Cleaning (1) 06.26.2023 | ||
| -- | -- | Certificate of Occupancy (1) * 06.23.2023 | ||
| -- | -- | C.O. to Lender (0) 06.23.2023 | ||
| -- | -- | Schedule Closing (0) 06.16.2023 | ||
| -- | -- | Buyer Walk Through (1) * 06.26.2023 | Friday, June 23 at 9AM | |
| -- | -- | Payment for Upgrades (0) 06.16.2023 | ||
| -- | -- | Keys to Settlement Agent (0) 06.21.2023 | ||
| -- | -- | Review Settlement Statement (0) 06.16.2023 | ||
| -- | -- | Jerry Signs Closing Documents (0) 05.11.2023 | ||
| -- | -- | Request Trash Tote From POA Manager (0) 06.22.2023 | ||
| -- | -- | Closing (1) 06.26.2023 | Brittany @ West View Title | |
| -- | -- | Remove Coded Lockbox (0) 07.10.2023 | ||