Fri |
Sep 20 |
Verify Window & Roof Structure (0)
|
|
|
Fri |
Sep 20 |
Rough In Microwave Vent (0)
|
|
|
Fri |
Sep 20 |
Order Plumbing / Lighting Fixtures (0)
|
|
|
Fri |
Sep 20 |
Blower Door Test (1)
|
|
|
|
-- |
-- |
One handle missing on kitchen island |
Fred |
|
-- |
-- |
Kitchen island door with hinge on wrong side |
Fred |
|
-- |
-- |
Replace mailbox board that someone appears to have backed into |
Tom |
|
-- |
-- |
Patch large crack in basement bonus room |
Tom. In process of repair 5/10 |
|
-- |
-- |
Remove drywall boards from back deck to prevent staining |
Jill |
|
-- |
-- |
Cover carpet |
Jill |
|
-- |
-- |
Ryan OOT May 24-28, Jun 17-29 |
|
|
-- |
-- |
Drywall repair near patio doors |
Drywaller |
|
-- |
-- |
Unable to access upstairs due to step staining 5/10 |
|
|
-- |
-- |
Patch screw holes in powder bath |
Painter |
|
-- |
-- |
Exterior electrical trim out |
Electrician. Exterior needs completed 5/17 |
|
-- |
-- |
Outlet covers needed in garage |
Electrician |
|
-- |
-- |
A lot of paint all over the hardwood staircase |
Painter |
|
-- |
-- |
Weatherstripping |
Jill |
|
-- |
-- |
Whiteboard needed below patio doors in basement. All units |
Tom |
|
-- |
-- |
White board back deck |
Tom |
|
-- |
-- |
Vinyl missing electrical outlet on deck |
Jeremy, Davenport |
|
-- |
-- |
Sing hvac covers living room |
|
|
-- |
-- |
Missing hvac covers living room |
HVAC |
|
-- |
-- |
Weatherstripping, needed patio door |
Sorry- deck door |
|
-- |
-- |
Paint, Push attic cover into place |
Painter, Jill |
|
-- |
-- |
CODED LOCKBOX 9696 |
|
|
-- |
-- |
Side landscaping needed |
Pettit |
|
-- |
-- |
Side landscaping needed |
|
|
-- |
-- |
Driveway staining |
|
|
-- |
-- |
Clean front trim around garage and front door |
Jill |
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Clean off deck |
Lynn |
|
-- |
-- |
Remove drywall mud from hall tub |
Jill |
|
-- |
-- |
Paint touch up at front door |
Painter |
|
-- |
-- |
Touch up cabinet door |
Painter |
|
-- |
-- |
Ratified Contract? (0)
01.11.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0)
01.20.2023 |
|
|
-- |
-- |
Association Packet Requested (0)
01.11.2023 |
|
|
-- |
-- |
Association Packet Received (0)
01.14.2023 |
|
|
-- |
-- |
Selections Meeting (0)
02.13.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0)
02.16.2023 |
2/12: sent to Ryan for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
03.07.2023 |
|
|
-- |
-- |
Deposit For Upgrades Received (0)
03.07.2023 |
|
|
-- |
-- |
Building Permit (30)
10.06.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
11.03.2022 |
|
|
-- |
-- |
Order Windows & Doors (0)
11.03.2022 |
|
|
-- |
-- |
Stake Out Home (1)
10.06.2022 |
|
|
-- |
-- |
Excavate (2)
10.06.2022 |
|
|
-- |
-- |
Inspection (Footers) (1)
10.06.2022 |
9/30/22 |
|
-- |
-- |
Inspection (Concrete Wall) (1)
11.10.2022 |
|
|
-- |
-- |
Pour Footers (1)
10.06.2022 |
|
|
-- |
-- |
Set Forms (2)
11.10.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1)
11.10.2022 |
|
|
-- |
-- |
Plumb Slab (2)
11.10.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
11.10.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
11.10.2022 |
|
|
-- |
-- |
Prepare Slab (1)
11.17.2022 |
|
|
-- |
-- |
Inspection (Slab) (1)
11.19.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
12.27.2022 |
|
|
-- |
-- |
Pour Slab (1)
11.19.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
01.13.2023 |
|
|
-- |
-- |
Framing I (9)
12.05.2022 |
|
|
-- |
-- |
Order Steps (0)
01.12.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0)
01.12.2023 |
|
|
-- |
-- |
Framing II (8)
12.27.2022 |
|
|
-- |
-- |
Framing III (8)
01.02.2023 |
|
|
-- |
-- |
Install Stairs (0)
01.12.2023 |
|
|
-- |
-- |
Windows & Doors (0)
01.12.2023 |
|
|
-- |
-- |
House Number and Status in Window (0)
02.23.2023 |
|
|
-- |
-- |
Roofing (0)
01.12.2023 |
|
|
-- |
-- |
Order Cabinets (0)
02.23.2023 |
|
|
-- |
-- |
Order Appliances (0)
05.06.2023 |
Standard SS |
|
-- |
-- |
Deck (0)
04.15.2023 |
|
|
-- |
-- |
Gutters (0)
04.11.2023 |
|
|
-- |
-- |
Driveway (0)
04.10.2023 |
|
|
-- |
-- |
Patio (0)
04.10.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0)
05.06.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
06.07.2023 |
|
|
-- |
-- |
HVAC Rough In (4)
01.14.2023 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
02.10.2023 |
|
|
-- |
-- |
Plumbing Rough In (4)
02.01.2023 |
In process 1/28 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
02.10.2023 |
|
|
-- |
-- |
Electric Rough In (4)
02.04.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1)
02.10.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
04.11.2023 |
|
|
-- |
-- |
Inspection (Framing) (1)
02.10.2023 |
|
|
-- |
-- |
Exterior Vinyl (0)
04.10.2023 |
|
|
-- |
-- |
Exterior Stone (0)
05.13.2023 |
In process 5/6 |
|
-- |
-- |
Insulation (2)
02.11.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1)
02.13.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
06.01.2023 |
|
|
-- |
-- |
Set Electric Meter (0)
06.14.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
03.20.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
03.20.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
04.10.2023 |
|
|
-- |
-- |
Drywall (Hang) (4)
02.22.2023 |
In process 2/15 |
|
-- |
-- |
Loan Approval (0)
05.04.2023 |
|
|
-- |
-- |
Deed Preparation (0)
05.04.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
03.05.2023 |
In process 3/1. Needs sanding. |
|
-- |
-- |
Paint 1 (1)
03.05.2023 |
|
|
-- |
-- |
Garage Door (0)
04.11.2023 |
|
|
-- |
-- |
House Numbers (0)
05.06.2023 |
|
|
-- |
-- |
Mailbox (0)
05.06.2023 |
|
|
-- |
-- |
Cabinet Installation (2)
04.01.2023 |
Sat, April 1 |
|
-- |
-- |
Granite Installation (1)
04.10.2023 |
|
|
-- |
-- |
Interior Trim - Install (3)
04.10.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1)
04.10.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
04.19.2023 |
|
|
-- |
-- |
Luxury Vinyl Tile (0)
04.19.2023 |
|
|
-- |
-- |
Paint 2 (3)
03.15.2023 |
|
|
-- |
-- |
Cover Floors (1)
05.06.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
04.11.2023 |
|
|
-- |
-- |
Shoe Moulding (0)
04.23.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
05.20.2023 |
Just needs shelving 5/17 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
05.29.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
05.01.2023 |
|
|
-- |
-- |
Set Water Meter (0)
05.08.2023 |
|
|
-- |
-- |
Electric Trim Out (3)
05.06.2023 |
Started 5/3 |
|
-- |
-- |
Ceiling Fans (0)
05.03.2023 |
|
|
-- |
-- |
HVAC Trim Out (1)
05.06.2023 |
Needs Al floor covers 5/3 |
|
-- |
-- |
Plumbing Trim Out (2)
04.26.2023 |
In process 4/23 |
|
-- |
-- |
Install Appliances (0)
05.13.2023 |
|
|
-- |
-- |
Paint 3 (2)
04.15.2023 |
|
|
-- |
-- |
Carpet (2)
04.23.2023 |
In process 4/19 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
06.14.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1)
06.19.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1)
06.19.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
06.19.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2)
06.21.2023 |
Reinspect June 21 |
|
-- |
-- |
Pre Walk Through (0)
05.29.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
05.13.2023 |
In process 5/10 |
|
-- |
-- |
Cleaning (1)
06.26.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1)
06.22.2023 |
|
|
-- |
-- |
C.O. to Lender (0)
06.22.2023 |
|
|
-- |
-- |
Schedule Closing (0)
06.23.2023 |
|
|
-- |
-- |
Buyer Walk Through (1)
06.26.2023 |
Friday, June 23 at 9AM |
|
-- |
-- |
Payment for Upgrades (0)
06.16.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
06.21.2023 |
|
|
-- |
-- |
Review Settlement Statement (0)
06.16.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
05.11.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
06.22.2023 |
|
|
-- |
-- |
Closing (1)
06.26.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0)
07.10.2023 |
|
|