Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Possibly removing oak treads to bedroom level |
|
|
-- |
-- |
Board missing in master bathroom |
|
|
-- |
-- |
Lender requests amendment with closing date |
|
|
-- |
-- |
Appliances delivered May 11 |
|
|
-- |
-- |
Drywallers need to sweep up/toss trash before paint 1 |
|
|
-- |
-- |
Vanity tops needed 5/10 |
|
|
-- |
-- |
Piece of drywall missing on the end of upstairs stairwell |
George |
|
-- |
-- |
Needs lots of lightbulbs |
Electrician. Just dining light 7/12 |
|
-- |
-- |
Confirm if there is an upgraded fridge or not |
|
|
-- |
-- |
Cover carpet |
|
|
-- |
-- |
Swap fridge - should not be French style upgraded fridge |
|
|
-- |
-- |
Rebelled needed |
|
|
-- |
-- |
Doorbell needed |
Electrician |
|
-- |
-- |
Attic cover |
After inspection |
|
-- |
-- |
Paint touchup needed around master bathroom fan |
Painter |
|
-- |
-- |
Few bulbs outdoor light needed |
Electrician |
|
-- |
-- |
Piece of trim needed on stairs |
Trim guy, George |
|
-- |
-- |
Small hole powder bath needs patching |
Painter |
|
-- |
-- |
CODED LOCKBOX 3232 |
|
|
-- |
-- |
Clean out garage and add trim |
Trim guy |
|
-- |
-- |
Install handrails |
Trim guy |
|
-- |
-- |
Patch trim holes at dormer |
Davenport |
|
-- |
-- |
HVAC drain needs lined up at drain better |
Tom |
|
-- |
-- |
Bugs in kitchen light |
Jill |
|
-- |
-- |
Glue in tub (hall) |
Jill |
|
-- |
-- |
Supports to be installed in kitchen pantry |
Joe, Paul |
|
-- |
-- |
Install window screens |
Jill |
|
-- |
-- |
Two shelves to be installed in master closet |
Joe, Paul |
|
-- |
-- |
Green wire in front yard |
Tom |
|
-- |
-- |
Few cabinet touchups needed |
Jill |
|
-- |
-- |
Raise Pendants and chandelier |
Electrician |
|
-- |
-- |
remove floors and remove paint spots |
remop - Jill |
|
-- |
-- |
repaint black treads |
Painters |
|
-- |
-- |
Box over hot/cold water valves in laundry |
Plastic valve cover needed - Tom |
|
-- |
-- |
Adjust back [atio door |
Framer |
|
-- |
-- |
tighten up exterior trim around bump out window |
Davenport |
|
-- |
-- |
wash off front door |
Jill |
|
-- |
-- |
paint touch up throughout |
Painter |
|
-- |
-- |
The walls and ceilings were scanned with a thermal camera. The scan revealed areas of misplaced or missing insulation which is evident by the bright orange/yellow color. Make corrections in the attic. (2.2) |
above attic access panel - Jill |
|
-- |
-- |
2.The dishwasher drain line did not have a high loop. Re-route the drain line and create a high loop to prevent back up water from entering the dishwasher. (3.0) |
CJ will fix this |
|
-- |
-- |
Replace dirty air filters. (5.6) |
Jill |
|
-- |
-- |
The condensation drain line is not depositing the condensation into the floor drain. Make adjustments to prevent water accumulation and damage. (5.7) |
|
|
-- |
-- |
Patio door has been adjusted but touch up paint is needed and floors need to be cleaned |
|
|
-- |
-- |
Touch up paint - patio door |
|
|
-- |
-- |
Remove stickers from dormer windows |
|
|
-- |
-- |
still needed 9/16 |
|
|
-- |
-- |
Ratified Contract? (0) 11.10.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.16.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 11.10.2022 |
|
|
-- |
-- |
Association Packet Received (0) 11.13.2022 |
|
|
-- |
-- |
Selections Meeting (0) 01.17.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0) 02.09.2023 |
2/7: sending new version to Lisa |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 02.15.2023 |
2/14: sent to Jerry for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0) 06.01.2023 |
|
|
-- |
-- |
Building Permit (30) 10.08.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 11.03.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 03.06.2023 |
|
|
-- |
-- |
Stake Out Home (1) 10.17.2022 |
|
|
-- |
-- |
Excavate (2) 10.17.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.17.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 11.10.2022 |
11/4/22 |
|
-- |
-- |
Pour Footers (1) 10.17.2022 |
|
|
-- |
-- |
Set Forms (2) 11.10.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 11.10.2022 |
|
|
-- |
-- |
Plumb Slab (2) 12.08.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.08.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 12.08.2022 |
|
|
-- |
-- |
Prepare Slab (1) 01.31.2023 |
|
|
-- |
-- |
Inspection (Slab) (1) 01.31.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 01.31.2023 |
|
|
-- |
-- |
Pour Slab (1) * 01.31.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 02.18.2023 |
|
|
-- |
-- |
Framing I (9) 01.31.2023 |
|
|
-- |
-- |
Order Steps (0) 03.06.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 03.22.2023 |
|
|
-- |
-- |
Framing II (8) 02.23.2023 |
|
|
-- |
-- |
Framing III (8) * 03.06.2023 |
|
|
-- |
-- |
Install Stairs (0) 03.22.2023 |
|
|
-- |
-- |
Windows & Doors (0) 03.06.2023 |
|
|
-- |
-- |
House Number and Status in Window (0) 04.05.2023 |
|
|
-- |
-- |
Roofing (0) 03.06.2023 |
|
|
-- |
-- |
Order Cabinets (0) 04.04.2023 |
|
|
-- |
-- |
Order Appliances (0) 06.11.2023 |
Standard SS |
|
-- |
-- |
Deck (0) 04.11.2023 |
|
|
-- |
-- |
Gutters (0) 05.20.2023 |
|
|
-- |
-- |
Driveway (0) 06.07.2023 |
|
|
-- |
-- |
Patio (0) 05.17.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 07.12.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 07.19.2023 |
|
|
-- |
-- |
HVAC Rough In (4) 03.22.2023 |
In process. 3/18 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 04.06.2023 |
|
|
-- |
-- |
Plumbing Rough In (4) 04.01.2023 |
In process 3/25 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 04.06.2023 |
|
|
-- |
-- |
Electric Rough In (4) 04.01.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 04.06.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 06.11.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 04.06.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 05.20.2023 |
In process 4/26 |
|
-- |
-- |
Exterior Stone (0) 05.31.2023 |
|
|
-- |
-- |
Insulation (2) 04.10.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1) 04.13.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 06.28.2023 |
Tuesday, June 27 |
|
-- |
-- |
Set Electric Meter (0) 07.08.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 03.20.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 03.20.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 05.17.2023 |
|
|
-- |
-- |
Drywall (Hang) (4) * 04.15.2023 |
|
|
-- |
-- |
Loan Approval (0) 06.19.2023 |
|
|
-- |
-- |
Deed Preparation (0) 06.19.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 04.26.2023 |
In process 4/23 |
|
-- |
-- |
Paint 1 (1) 04.29.2023 |
|
|
-- |
-- |
Garage Door (0) 05.06.2023 |
|
|
-- |
-- |
House Numbers (0) 05.25.2023 |
|
|
-- |
-- |
Mailbox (0) 06.12.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 05.10.2023 |
Cabinets on site 4/26 |
|
-- |
-- |
Granite Installation (1) * 05.10.2023 |
|
|
-- |
-- |
Interior Trim - Install (3) 05.20.2023 |
In process 5/17 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 07.26.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 05.24.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 06.07.2023 |
In process 6/3 |
|
-- |
-- |
Luxury Vinyl Tile (0) 06.03.2023 |
|
|
-- |
-- |
Paint 2 (3) 05.24.2023 |
In process 5/20 |
|
-- |
-- |
Cover Floors (1) 06.22.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 06.01.2023 |
|
|
-- |
-- |
Shoe Moulding (0) 06.07.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 06.26.2023 |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 07.01.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 06.19.2023 |
|
|
-- |
-- |
Set Water Meter (0) 07.12.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 07.01.2023 |
Needs bulbs. Outdoor trim out. |
|
-- |
-- |
Ceiling Fans (0) 06.07.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 06.28.2023 |
Needs thermostat |
|
-- |
-- |
Plumbing Trim Out (2) 06.28.2023 |
|
|
-- |
-- |
Install Appliances (0) * 06.15.2023 |
Delivery 5/23 |
|
-- |
-- |
Paint 3 (2) * 05.31.2023 |
In process 5/24 |
|
-- |
-- |
Carpet (2) 06.07.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 08.07.2023 |
Mike Shirfey, Monday, July 31 |
|
-- |
-- |
Inspection (Final HVAC) (1) 07.19.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 07.19.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 07.19.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 07.19.2023 |
Reinspect - Tue, Jul 18 |
|
-- |
-- |
Pre Walk Through (0) 07.17.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 06.28.2023 |
|
|
-- |
-- |
Cleaning (1) 07.19.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 07.20.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 07.20.2023 |
|
|
-- |
-- |
Schedule Closing (0) 09.05.2023 |
|
|
-- |
-- |
Buyer Walk Through (1) 07.27.2023 |
Kate awaiting response |
|
-- |
-- |
Payment for Upgrades (0) 07.17.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 07.17.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 09.05.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 08.16.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 07.17.2023 |
|
|
-- |
-- |
Closing (1) 09.07.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 09.07.2023 |
|
|