Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Are the oak treads to the upper level installed? |
|
|
-- |
-- |
Kate - order fridge after selections |
|
|
-- |
-- |
Dining room window needed |
|
|
-- |
-- |
Remove extra set of steps |
|
|
-- |
-- |
Relatively large crack in basement floor |
|
|
-- |
-- |
White board is bowed |
Between 2nd and 3rd floor, Davenport |
|
-- |
-- |
Patch holes and white trim board around windows and above garage |
Davenport |
|
-- |
-- |
Final siding, patched, and rear with the wrong vinyl siding color |
Davenport |
|
-- |
-- |
Paint color does not look correct |
Bedrooms - Painter |
|
-- |
-- |
Broken upstairs bedroom window. Won’t close. |
Tom |
|
-- |
-- |
Master bed electric cover needed |
Electrician and upstairs hallway |
|
-- |
-- |
More cracking than usual in this patio |
Wait to see what the buyers think |
|
-- |
-- |
Corner chipped on driveway |
|
|
-- |
-- |
Trim needed on the exterior bonus room window |
Davenport |
|
-- |
-- |
Staining on steps to upper level |
Painter |
|
-- |
-- |
Trim needed in garage |
Trim guy |
|
-- |
-- |
Install cover on snap light in hall foyer |
Electrician |
|
-- |
-- |
Fix smoke detector hall foyer |
Electrician |
|
-- |
-- |
Install light foyer closet |
Electrician |
|
-- |
-- |
Electrical cover needed at front door |
Electrician |
|
-- |
-- |
Install pendant lights |
Electrician |
|
-- |
-- |
Light needed in second bedroom |
Electrician |
|
-- |
-- |
Powder bath needs mirror |
Electrician |
|
-- |
-- |
CODED LOCKBOX 3434 |
|
|
-- |
-- |
Buyers OOT Aug 1 - 10 |
|
|
-- |
-- |
Snap light in living room needs pushed against the ceiling |
Electrician |
|
-- |
-- |
Push attic cover into place |
Jill |
|
-- |
-- |
Touch up paint |
Painters |
|
-- |
-- |
Patch screw hole beneath powder bathroom light |
Painter |
|
-- |
-- |
Install attic, access panel |
|
|
-- |
-- |
Adjust closet doors |
Jill |
|
-- |
-- |
Adjust closet doors |
|
|
-- |
-- |
install trim in front of bathtubs |
Henry |
|
-- |
-- |
Clean out back bonus room |
Jill |
|
-- |
-- |
Damp area in garage floor |
Tom |
|
-- |
-- |
Extend sidewalk and driveway so owners can use |
Tom, S&K |
|
-- |
-- |
Change battery in a smoke detector |
Tom |
|
-- |
-- |
|
|
|
-- |
-- |
Power wash back patio |
Jackson |
|
-- |
-- |
Paint, touchup throughout |
Painters |
|
-- |
-- |
Clean mud spots off carpet, and upstairs bedrooms |
Jill |
|
-- |
-- |
Clean glue off tub shower |
And master shower |
|
-- |
-- |
Reinstall insulation in bonus bath |
Jill |
|
-- |
-- |
Check fridge temp controls- freezing in fridge |
Matts Appliance, Mon, July 31 12-3 |
|
-- |
-- |
Screw coming through side panel |
Fred has ordered a new panel |
|
-- |
-- |
Clean the front of townhouse |
Jackson will pressure wash |
|
-- |
-- |
Crack in driveway- hoping they will repour? |
|
|
-- |
-- |
Piece of siding needs swapped out |
|
|
-- |
-- |
Downspout needed back side |
Tom (after landscaping) |
|
-- |
-- |
Black marks on window trim and large wide board |
Davenport. Needs cleaned 8/16 |
|
-- |
-- |
Remove extra screens |
|
|
-- |
-- |
1 window without screen. Small side window. |
|
|
-- |
-- |
Remove trash from garage |
|
|
-- |
-- |
Smoke alarm beeping |
|
|
-- |
-- |
Garage door code? |
|
|
-- |
-- |
Beeping smoke alarm |
Jill |
|
-- |
-- |
Erin King 540-421-9482 |
|
|
-- |
-- |
Needs apron on driveway |
|
|
-- |
-- |
Ratified Contract? (0) 02.08.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 02.14.2023 |
|
|
-- |
-- |
Association Packet Requested (0) 02.08.2023 |
|
|
-- |
-- |
Association Packet Received (0) 02.11.2023 |
|
|
-- |
-- |
Selections Meeting (0) 03.21.2023 |
Kate Order Fridge after selections. |
|
-- |
-- |
Selections Sheet Signed (0) 04.04.2023 |
3/21: sent to Mattias |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 04.13.2023 |
4/12: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 04.12.2023 |
|
|
-- |
-- |
Building Permit (30) 10.08.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 11.03.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 03.06.2023 |
|
|
-- |
-- |
Stake Out Home (1) 10.17.2022 |
|
|
-- |
-- |
Excavate (2) 10.17.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.17.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 11.10.2022 |
11/4/22 |
|
-- |
-- |
Pour Footers (1) 10.17.2022 |
|
|
-- |
-- |
Set Forms (2) 11.10.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 11.10.2022 |
|
|
-- |
-- |
Plumb Slab (2) 12.08.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.08.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 12.08.2022 |
|
|
-- |
-- |
Prepare Slab (1) 01.31.2023 |
|
|
-- |
-- |
Inspection (Slab) (1) 01.31.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 01.31.2023 |
|
|
-- |
-- |
Pour Slab (1) * 01.31.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 05.17.2023 |
|
|
-- |
-- |
Framing I (9) 01.31.2023 |
|
|
-- |
-- |
Order Steps (0) 03.06.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 03.06.2023 |
|
|
-- |
-- |
Framing II (8) 02.23.2023 |
|
|
-- |
-- |
Framing III (8) * 03.06.2023 |
|
|
-- |
-- |
Install Stairs (0) 03.06.2023 |
|
|
-- |
-- |
Windows & Doors (0) 03.06.2023 |
|
|
-- |
-- |
House Number and Status in Window (0) 04.05.2023 |
|
|
-- |
-- |
Roofing (0) 03.06.2023 |
|
|
-- |
-- |
Order Cabinets (0) 04.25.2023 |
|
|
-- |
-- |
Order Appliances (0) 06.12.2023 |
Standard |
|
-- |
-- |
Deck (0) 04.11.2023 |
|
|
-- |
-- |
Gutters (0) 05.20.2023 |
|
|
-- |
-- |
Driveway (0) 06.03.2023 |
|
|
-- |
-- |
Patio (0) 05.24.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 07.12.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 08.31.2023 |
Side landscaping needed |
|
-- |
-- |
HVAC Rough In (4) 03.22.2023 |
In process 3/18 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 04.06.2023 |
|
|
-- |
-- |
Plumbing Rough In (4) 04.01.2023 |
In process 3/25 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 04.06.2023 |
|
|
-- |
-- |
Electric Rough In (4) 04.15.2023 |
In process 4/12 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 04.29.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 04.29.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 04.29.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 05.20.2023 |
|
|
-- |
-- |
Exterior Stone (0) 06.12.2023 |
5/31 in process |
|
-- |
-- |
Insulation (2) 04.23.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1) 05.06.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 06.28.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 07.08.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 03.20.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 03.20.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 05.18.2023 |
|
|
-- |
-- |
Drywall (Hang) (4) * 04.29.2023 |
In process 4/26 |
|
-- |
-- |
Loan Approval (0) 02.17.2023 |
|
|
-- |
-- |
Deed Preparation (0) 06.19.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 05.13.2023 |
Almost complete 5/10 |
|
-- |
-- |
Paint 1 (1) 05.13.2023 |
|
|
-- |
-- |
Garage Door (0) 06.26.2023 |
|
|
-- |
-- |
House Numbers (0) 05.29.2023 |
|
|
-- |
-- |
Mailbox (0) 06.12.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 05.17.2023 |
|
|
-- |
-- |
Granite Installation (1) * 05.24.2023 |
|
|
-- |
-- |
Interior Trim - Install (3) 05.31.2023 |
In process 5/28 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 07.26.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 06.07.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 06.14.2023 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 06.14.2023 |
|
|
-- |
-- |
Paint 2 (3) 06.07.2023 |
|
|
-- |
-- |
Cover Floors (1) 07.01.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 06.01.2023 |
|
|
-- |
-- |
Shoe Moulding (0) 06.28.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 07.12.2023 |
In process 6/28 still needs shelving and mirrors 7/5. And some handles 7/9 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 07.13.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 06.19.2023 |
|
|
-- |
-- |
Set Water Meter (0) 07.12.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 07.12.2023 |
In process 7/5. Needs few items. |
|
-- |
-- |
Ceiling Fans (0) 07.01.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 06.28.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 06.28.2023 |
|
|
-- |
-- |
Install Appliances (0) * 07.12.2023 |
Standard Delivery 6/2. Range and micro in garage 7/1 |
|
-- |
-- |
Paint 3 (2) * 06.28.2023 |
|
|
-- |
-- |
Carpet (2) 06.14.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 07.27.2023 |
Diane Hirsch, Fri, July 21 |
|
-- |
-- |
Inspection (Final HVAC) (1) 07.19.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 07.19.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 07.19.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 07.19.2023 |
Tuesday, July 18 |
|
-- |
-- |
Pre Walk Through (0) 07.17.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 07.05.2023 |
In process 7/1 |
|
-- |
-- |
Cleaning (1) 07.22.2023 |
Thu, Jul 20 |
|
-- |
-- |
Certificate of Occupancy (1) * 07.20.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 07.20.2023 |
|
|
-- |
-- |
Schedule Closing (0) 07.27.2023 |
Thinking Thursday, 27th |
|
-- |
-- |
Buyer Walk Through (1) 07.22.2023 |
Fri, Jul 21, 4:30 PM |
|
-- |
-- |
Payment for Upgrades (0) 07.17.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 07.17.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 07.11.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 07.19.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 07.17.2023 |
|
|
-- |
-- |
Closing (1) 07.27.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 08.03.2023 |
Owners have removed key 7/30 |
|