CONGERS-2 - 39  ::  1550 Palomino Trail
[ BUILD: 20230689 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   7/12: Kate is waiting for buyer to review selections;
--   --   7/12: Kate is waiting for buyer to review selections
--   --   Remove large amount of drywall in small bedroom so room can be finished?
--   --   Fridge in front hallway
--   --   Silver door hinges throughout? A mix of black and silver
--   --   This house only has an oven on site
--   --   I am assuming that bonus room has luxury vinyl plank, but it does not appear to be noted in changes or upgrades
--   --   Base trim needed in garage Trim, George
--   --   Painting pantry? Let’s fix so shelving can be installed
--   --   Large dent master shower Jill, Wed, Dec 27
--   --   CODED LOCKBOX 3939
--   --   Install attic cover
--   --   Cable covers needed in garage
--   --   Install screens Jill
--   --  
--   --   Paint touch up Painter
--   --   Clean guest bath tub Lynn
--   --   Repair scratch on cabinet by refrigerator Jill
--   --   Adjust door to the deck where it rubs Tom
--   --   Replace transition strip to stop of first set of steps Denny
--   --   Sand near transition strip Painter
--   --   Paint attic access cover Painter
--   --   Add bracket to each hand rail George
--   --   Push down door hinge pins Jill
--   --   Patio door screen - instal
--   --   Install patio door screen Jill
--   --   Replace broken J channel above front porch Davenport
--   --   Clean out garage Jill
--   --   Pressure wash Jill
--   --   Add additional 2x8 under deck Tom
--   --   Add ceiling fan in living room Electrician. Needs installed 1/10
--   --   Re-clean high traffic areas after fan installation In process 1/10
--   --   Pressure washing
--   --   Repair or replace screen door latch Contact is Zilda (3/12)
-- -- Ratified Contract? (0)  05.08.2023    
-- -- $2500 Deposit Received (0)  05.16.2023    
-- -- Association Packet Requested (0)  05.08.2023    
-- -- Association Packet Received (0)  05.11.2023    
-- -- Selections Meeting (0)  07.22.2023    
-- -- Selections Sheet Signed (0)  08.03.2023     8/1: Sent to the buyer for signatures;
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  08.26.2023     8/25: sent to Jerry to sign
-- -- Deposit For Upgrades Received (0)  08.25.2023    
-- -- Building Permit (30)  05.05.2023    
-- -- Order Roof & Floor Trusses (1)  06.26.2023    
-- -- Order Windows & Doors (0)  08.24.2023    
-- -- Stake Out Home (1)  05.18.2023    
-- -- Excavate (2)  05.18.2023    
-- -- Inspection (Footers) (1)  05.18.2023    
-- -- Inspection (Concrete Wall) (1)  05.18.2023    
-- -- Pour Footers (1)  05.18.2023    
-- -- Set Forms (2)  06.12.2023    
-- -- Pour Foundation Walls (1)  06.12.2023    
-- -- Plumb Slab (2)  06.12.2023    
-- -- Inspection (Plumbing Under Slab) (1)  06.26.2023    
-- -- Inspection (Conduit Under Slab) (1)  06.26.2023    
-- -- Prepare Slab (1)  07.10.2023    
-- -- Inspection (Slab) (1)  07.10.2023    
-- -- Inspection (Drain Tile) (0)  10.05.2023    
-- -- Pour Slab (1) *   07.10.2023    
-- -- Settlement Agent Confirmed (0)  09.01.2023    
-- -- Framing I (9)  08.03.2023    
-- -- Order Steps (0)  09.18.2023    
-- -- Order Tubs / Showers (0)  09.18.2023    
-- -- Framing II (8)  08.10.2023    
-- -- Framing III (8) *   08.23.2023    
-- -- Verify Window & Roof Structure (0)  12.11.2023    
-- -- Install Stairs (0)  09.18.2023    
-- -- Windows & Doors (0)  10.11.2023    
-- -- House Number and Status in Window (0)  09.20.2023    
-- -- Roofing (0)  08.31.2023    
-- -- Order Cabinets (0)  09.07.2023    
-- -- Order Appliances (0)  09.11.2023     STANDARD SS
-- -- Deck (0)  10.18.2023     12 x 18 DECK
-- -- Gutters (0)  12.06.2023    
-- -- Driveway (0)  12.03.2023     EXPANDED
-- -- Patio (0)  11.15.2023     10 x 10 PATIO
-- -- Privacy Divider / Fence (0)  12.03.2023    
-- -- Sod / Seed / Landscaping (0)  01.03.2024    
-- -- HVAC Rough In (4)  10.18.2023    
-- -- Inspection (Rough In HVAC) (1)  09.30.2023    
-- -- Rough In Microwave Vent (0)  12.11.2023    
-- -- Plumbing Rough In (4)  09.23.2023     in process 9-17
-- -- Inspection (Rough In Plumbing) (1)  09.30.2023    
-- -- Electric Rough In (4)  09.27.2023    
-- -- Inspection (Rough In Electric) (1)  09.30.2023    
-- -- Inspection (Deck Piers) (0)  10.30.2023    
-- -- Inspection (Framing) (1)  10.04.2023    
-- -- Exterior Vinyl (0) *   12.03.2023     in process 11/25
-- -- Exterior Stone (0)  12.03.2023    
-- -- Insulation (2)  09.30.2023    
-- -- Inspection (Insulation) (1)  10.04.2023    
-- -- Inspection (Electric Service) (0)  10.30.2023    
-- -- Set Electric Meter (0)  12.11.2023    
-- -- Inspection (Main Sewer Line) (0)  11.09.2023    
-- -- Inspection (Main Water Line) (0)  11.09.2023    
-- -- Order Interior Doors & Trim (0)  11.09.2023    
-- -- Drywall (Hang) (4) *   10.11.2023     In process 10/7
-- -- Loan Approval (0)  12.26.2023    
-- -- Deed Preparation (0)  11.09.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   10.28.2023     In process 10/25
-- -- Paint 1 (1)  10.28.2023    
-- -- Garage Door (0)  11.25.2023    
-- -- House Numbers (0)  12.13.2023    
-- -- Mailbox (0)  12.21.2023    
-- -- Cabinet Installation (2) *   10.25.2023    
-- -- Granite Installation (1) *   11.08.2023    
-- -- Interior Trim - Install (3)  11.12.2023     In process 11/8
-- -- Order Plumbing / Lighting Fixtures (0)  11.16.2023    
-- -- Interior Trim - Paint (1)  11.25.2023    
-- -- Luxury Vinyl Plank (3) *   12.09.2023     In process 12/6
-- -- Luxury Vinyl Tile (0)  12.06.2023    
-- -- Paint 2 (3)  12.03.2023    
-- -- Cover Floors (1)  12.16.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  11.30.2023    
-- -- Shoe Moulding (0)  12.16.2023     In process 12/13
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  12.23.2023     Black accessories, Bonus. In process 12/16
-- -- Install Coded Lockbox (add extra keys) (0)  12.19.2023    
-- -- Pay Water / Sewer Taps (0)  12.06.2023    
-- -- Set Water Meter (0)  12.06.2023    
-- -- Electric Trim Out (3)  12.23.2023     Black. In process 12/16
-- -- Ceiling Fans (0)  12.23.2023     NO UPGRADE
-- -- HVAC Trim Out (1)  12.03.2023    
-- -- Blower Door Test (1)  12.21.2023    
-- -- Plumbing Trim Out (2)  12.16.2023     Black
-- -- Install Appliances (0) *   12.23.2023     One oven on site. Fridge in garage 12/20
-- -- Paint 3 (2) *   12.03.2023    
-- -- Carpet (2)  12.09.2023    
-- -- Appraiser Confirms Construction Completion (0)  12.26.2023    
-- -- Inspection (Final HVAC) (1)  12.28.2023    
-- -- Inspection (Final Plumbing) (1)  12.28.2023    
-- -- Inspection (Final Electric) (1)  12.28.2023     12/27/23
-- -- Inspection (Final Building) (2) *   12.28.2023     Wed, Dec 27
-- -- Pre Walk Through (0)  12.26.2023    
-- -- Stain Hardwood Stairs (1)  12.20.2023     In process 12/16
-- -- Cleaning (1)  12.28.2023    
-- -- Certificate of Occupancy (1) *   12.30.2023    
-- -- C.O. to Lender (0)  12.30.2023    
-- -- Schedule Closing (0)  01.02.2024    
-- -- Buyer Walk Through (1)  12.28.2023    
-- -- Payment for Upgrades (0)  12.26.2023    
-- -- Keys to Settlement Agent (0)  12.19.2023    
-- -- Review Settlement Statement (0)  01.02.2024    
-- -- Jerry Signs Closing Documents (0)  01.04.2024    
-- -- Request Trash Tote From POA Manager (0)  12.11.2023    
-- -- Closing (1)  01.03.2024     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  01.11.2024