7/12: Kate is waiting for buyer to review selections; |
|
|
-- |
-- |
7/12: Kate is waiting for buyer to review selections |
|
|
-- |
-- |
Remove large amount of drywall in small bedroom so room can be finished? |
|
|
-- |
-- |
Fridge in front hallway |
|
|
-- |
-- |
Silver door hinges throughout? |
A mix of black and silver |
|
-- |
-- |
This house only has an oven on site |
|
|
-- |
-- |
I am assuming that bonus room has luxury vinyl plank, but it does not appear to be noted in changes or upgrades |
|
|
-- |
-- |
Base trim needed in garage |
Trim, George |
|
-- |
-- |
Painting pantry? |
Let’s fix so shelving can be installed |
|
-- |
-- |
Large dent master shower |
Jill, Wed, Dec 27 |
|
-- |
-- |
CODED LOCKBOX 3939 |
|
|
-- |
-- |
Install attic cover |
|
|
-- |
-- |
Cable covers needed in garage |
|
|
-- |
-- |
Install screens |
Jill |
|
-- |
-- |
|
|
|
-- |
-- |
Paint touch up |
Painter |
|
-- |
-- |
Clean guest bath tub |
Lynn |
|
-- |
-- |
Repair scratch on cabinet by refrigerator |
Jill |
|
-- |
-- |
Adjust door to the deck where it rubs |
Tom |
|
-- |
-- |
Replace transition strip to stop of first set of steps |
Denny |
|
-- |
-- |
Sand near transition strip |
Painter |
|
-- |
-- |
Paint attic access cover |
Painter |
|
-- |
-- |
Add bracket to each hand rail |
George |
|
-- |
-- |
Push down door hinge pins |
Jill |
|
-- |
-- |
Patio door screen - instal |
|
|
-- |
-- |
Install patio door screen |
Jill |
|
-- |
-- |
Replace broken J channel above front porch |
Davenport |
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Pressure wash |
Jill |
|
-- |
-- |
Add additional 2x8 under deck |
Tom |
|
-- |
-- |
Add ceiling fan in living room |
Electrician. Needs installed 1/10 |
|
-- |
-- |
Re-clean high traffic areas after fan installation |
In process 1/10 |
|
-- |
-- |
Pressure washing |
|
|
-- |
-- |
Repair or replace screen door latch |
Contact is Zilda (3/12) |
|
-- |
-- |
Ratified Contract? (0) 05.08.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 05.16.2023 |
|
|
-- |
-- |
Association Packet Requested (0) 05.08.2023 |
|
|
-- |
-- |
Association Packet Received (0) 05.11.2023 |
|
|
-- |
-- |
Selections Meeting (0) 07.22.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0) 08.03.2023 |
8/1: Sent to the buyer for signatures; |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 08.26.2023 |
8/25: sent to Jerry to sign |
|
-- |
-- |
Deposit For Upgrades Received (0) 08.25.2023 |
|
|
-- |
-- |
Building Permit (30) 05.05.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 06.26.2023 |
|
|
-- |
-- |
Order Windows & Doors (0) 08.24.2023 |
|
|
-- |
-- |
Stake Out Home (1) 05.18.2023 |
|
|
-- |
-- |
Excavate (2) 05.18.2023 |
|
|
-- |
-- |
Inspection (Footers) (1) 05.18.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 05.18.2023 |
|
|
-- |
-- |
Pour Footers (1) 05.18.2023 |
|
|
-- |
-- |
Set Forms (2) 06.12.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1) 06.12.2023 |
|
|
-- |
-- |
Plumb Slab (2) 06.12.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 06.26.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 06.26.2023 |
|
|
-- |
-- |
Prepare Slab (1) 07.10.2023 |
|
|
-- |
-- |
Inspection (Slab) (1) 07.10.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 10.05.2023 |
|
|
-- |
-- |
Pour Slab (1) * 07.10.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 09.01.2023 |
|
|
-- |
-- |
Framing I (9) 08.03.2023 |
|
|
-- |
-- |
Order Steps (0) 09.18.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 09.18.2023 |
|
|
-- |
-- |
Framing II (8) 08.10.2023 |
|
|
-- |
-- |
Framing III (8) * 08.23.2023 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 12.11.2023 |
|
|
-- |
-- |
Install Stairs (0) 09.18.2023 |
|
|
-- |
-- |
Windows & Doors (0) 10.11.2023 |
|
|
-- |
-- |
House Number and Status in Window (0) 09.20.2023 |
|
|
-- |
-- |
Roofing (0) 08.31.2023 |
|
|
-- |
-- |
Order Cabinets (0) 09.07.2023 |
|
|
-- |
-- |
Order Appliances (0) 09.11.2023 |
STANDARD SS |
|
-- |
-- |
Deck (0) 10.18.2023 |
12 x 18 DECK |
|
-- |
-- |
Gutters (0) 12.06.2023 |
|
|
-- |
-- |
Driveway (0) 12.03.2023 |
EXPANDED |
|
-- |
-- |
Patio (0) 11.15.2023 |
10 x 10 PATIO |
|
-- |
-- |
Privacy Divider / Fence (0) 12.03.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 01.03.2024 |
|
|
-- |
-- |
HVAC Rough In (4) 10.18.2023 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 09.30.2023 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 12.11.2023 |
|
|
-- |
-- |
Plumbing Rough In (4) 09.23.2023 |
in process 9-17 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.30.2023 |
|
|
-- |
-- |
Electric Rough In (4) 09.27.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.30.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 10.30.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 10.04.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 12.03.2023 |
in process 11/25 |
|
-- |
-- |
Exterior Stone (0) 12.03.2023 |
|
|
-- |
-- |
Insulation (2) 09.30.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1) 10.04.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 10.30.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 12.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 11.09.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 11.09.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 11.09.2023 |
|
|
-- |
-- |
Drywall (Hang) (4) * 10.11.2023 |
In process 10/7 |
|
-- |
-- |
Loan Approval (0) 12.26.2023 |
|
|
-- |
-- |
Deed Preparation (0) 11.09.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 10.28.2023 |
In process 10/25 |
|
-- |
-- |
Paint 1 (1) 10.28.2023 |
|
|
-- |
-- |
Garage Door (0) 11.25.2023 |
|
|
-- |
-- |
House Numbers (0) 12.13.2023 |
|
|
-- |
-- |
Mailbox (0) 12.21.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 10.25.2023 |
|
|
-- |
-- |
Granite Installation (1) * 11.08.2023 |
|
|
-- |
-- |
Interior Trim - Install (3) 11.12.2023 |
In process 11/8 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 11.16.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 11.25.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 12.09.2023 |
In process 12/6 |
|
-- |
-- |
Luxury Vinyl Tile (0) 12.06.2023 |
|
|
-- |
-- |
Paint 2 (3) 12.03.2023 |
|
|
-- |
-- |
Cover Floors (1) 12.16.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 11.30.2023 |
|
|
-- |
-- |
Shoe Moulding (0) 12.16.2023 |
In process 12/13 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 12.23.2023 |
Black accessories, Bonus. In process 12/16 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 12.19.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 12.06.2023 |
|
|
-- |
-- |
Set Water Meter (0) 12.06.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 12.23.2023 |
Black. In process 12/16 |
|
-- |
-- |
Ceiling Fans (0) 12.23.2023 |
NO UPGRADE |
|
-- |
-- |
HVAC Trim Out (1) 12.03.2023 |
|
|
-- |
-- |
Blower Door Test (1) 12.21.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 12.16.2023 |
Black |
|
-- |
-- |
Install Appliances (0) * 12.23.2023 |
One oven on site. Fridge in garage 12/20 |
|
-- |
-- |
Paint 3 (2) * 12.03.2023 |
|
|
-- |
-- |
Carpet (2) 12.09.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 12.26.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 12.28.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 12.28.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 12.28.2023 |
12/27/23 |
|
-- |
-- |
Inspection (Final Building) (2) * 12.28.2023 |
Wed, Dec 27 |
|
-- |
-- |
Pre Walk Through (0) 12.26.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 12.20.2023 |
In process 12/16 |
|
-- |
-- |
Cleaning (1) 12.28.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 12.30.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 12.30.2023 |
|
|
-- |
-- |
Schedule Closing (0) 01.02.2024 |
|
|
-- |
-- |
Buyer Walk Through (1) 12.28.2023 |
|
|
-- |
-- |
Payment for Upgrades (0) 12.26.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 12.19.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 01.02.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 01.04.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 12.11.2023 |
|
|
-- |
-- |
Closing (1) 01.03.2024 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 01.11.2024 |
|
|