37 ADDR
CONGERS-2 - 40  ::  1554 Palomino Trail
[ BUILD: 20230690 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
Is electric complete? Various wires in living room
Really needs to close by mid December if at all possible
Relatively large hump at the top of the first staircase
Cover tubs
Fridge door in this unit is dented…
Appliances are here- can we cover or move them? Jill
Settlement Goal = Dec 15
Paint interior of garage
Remove siding from garage ASAP
Plumber arriving Wednesday 12/6
Cover carpets ASAP
Shower rod, needed and basement bathroom. On site but needs installed. Paul
Powder bath mirror needs installed Paul
Touchup ceiling in small bedroom Painter
Plumbing needs completed and hall bathroom
Attic, cover needed Painter
Master bathroom door does not close. Possible hinge issue? Tom
Install wire racks in master bathroom Paul
Coded lockbox 4040
The kitchen pendant lights seem abnormally high
Oven needs pushed back into place. Electrician has completed outlet.
Install hand, towel rack Just hand rack is needed. Hall bath. Paul, Savannah
Install light cover in the hall bathroom
Missing globe in master bathroom, light fixture
Powder bath light needed
Bonus bathroom needs a light
Trim utility room door as it does not open or close easily due to carpet Trim, George
Base trim, needed and garage Trim, George
Mailbox Tom
Patch master bedroom escutcheon Painter
Paint the front door frame Painter
Remove appliances from garage Jill
Send it back drywall patch in bonus room Sand and paint, painter
splash blocks needed off of gutters Tom
Bath fan repair needed Drywall, Painter
Smoke detector in upstairs hallway needs repaired Electrician
Paint attic door cover Painter
Shower dent in master bathroom Jill
Paint touch up in a few spots that are pretty large Painter
$1,000 escrow for landscaping
Paint the top and bottom of all doors Painters
Do you places to touch up with paint in the hall Bath
Paint touch up throughout Painters
The small window in the bedroom to the left does not close right Tom?
Screen doors need installed on both doors jill
There are a lot of paint drips on the force they need removed
3 screens needed in the basement bonus ring windows
Pressure wash outfront in backtown house
Landscaping needs to be finished outside
Saying the edges of all the doors that are rough feeling throughout town home
Remove the strip from the patio door threshold
Clean the frame around the patio door window
The transition strip on the top of the first set of steps needs to be replaced Denny has been notified. Friday or Tuesday to replace.
Push all hinges down
Make sure all the trim throughout the home is clean
Replace broken water supply line to the refrigerator
Pocket door on the pantry does not open or close easily it makes a noise
Silicone around The Wire coming up through the bottom of the cabinets on the island, both ends Tom
Wipe the freezer and frigerator out a little bit Jill. Fridge is done 12/20
Fred- Is it possible that we could smooth down the edges of some of the cabinets that are really sharp billing?
Sand the corners and edges of all the doors throughout the home that are rough
Pressure wash front
Lower dining room chandelier, down three links Electrician
Adjust window in living room
Adjust master bath door - add pin
Missing small front piece of gutter downspout Tom
$1,200 escrow for landscaping
Double escrow hold back?
UPGRADES - COMPLETED
    Bonus Room  
    Bonus Bathroom  
    Vent Microwave to Exterior  
    Amendment to increase price by $16,910  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  05.04.2023    
-- -- $2500 Deposit Received (0)  05.09.2023    
-- -- Association Packet Requested (0)  05.04.2023    
-- -- Association Packet Received (0)  05.06.2023    
-- -- Selections Meeting (0)  05.26.2023    
-- -- Selections Sheet Signed (0)  06.07.2023     5/26: Sent to Matt
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  10.19.2023     6/6: sent to Matt for signature
-- -- Deposit For Upgrades Received (0)  06.07.2023    
-- -- Building Permit (30) *   05.05.2023    
-- -- Order Roof & Floor Trusses (1)  06.26.2023    
-- -- Order Windows & Doors (0)  08.24.2023    
-- -- Stake Out Home (1)  05.18.2023    
-- -- Excavate (2)  05.18.2023    
-- -- Inspection (Footers) (1)  05.18.2023    
-- -- Inspection (Concrete Wall) (1)  05.18.2023    
-- -- Pour Footers (1) *   05.18.2023    
-- -- Set Forms (2)  06.12.2023    
-- -- Pour Foundation Walls (1)  06.12.2023    
-- -- Plumb Slab (2)  06.12.2023    
-- -- Inspection (Plumbing Under Slab) (1)  06.26.2023    
-- -- Inspection (Conduit Under Slab) (1)  06.26.2023    
-- -- Prepare Slab (1)  07.10.2023    
-- -- Inspection (Slab) (1)  07.10.2023    
-- -- Inspection (Drain Tile) (0)  10.05.2023    
-- -- Pour Slab (1) *   07.10.2023    
-- -- Settlement Agent Confirmed (0)  10.21.2023    
-- -- Framing I (9)  08.03.2023    
-- -- Order Steps (0)  09.18.2023    
-- -- Order Tubs / Showers (0)  09.18.2023    
-- -- Framing II (8)  08.10.2023    
-- -- Framing III (8) *   08.23.2023    
-- -- Verify Window & Roof Structure (0)  12.11.2023    
-- -- Install Stairs (0) *   09.18.2023    
-- -- Windows & Doors (0) *   10.04.2023    
-- -- House Number and Status in Window (0)  09.20.2023    
-- -- Roofing (0) *   08.31.2023    
-- -- Order Cabinets (0)  09.07.2023    
-- -- Order Appliances (0)  09.14.2023     STANDARD SS
-- -- Deck (0)  10.21.2023     In process 10/7
-- -- Gutters (0)  12.06.2023    
-- -- Driveway (0) *   12.03.2023     NO UPGRADE
-- -- Patio (0)  11.15.2023     NO UPGRADE
-- -- Privacy Divider / Fence (0) *   12.03.2023    
-- -- Sod / Seed / Landscaping (0)  11.06.2023    
-- -- HVAC Rough In (4)  09.16.2023    
-- -- Rough In Microwave Vent (0)  12.11.2023    
-- -- Plumbing Rough In (4)  09.30.2023    
-- -- Electric Rough In (4)  09.30.2023    
-- -- Inspection (Rough In HVAC) (1)  10.04.2023    
-- -- Inspection (Rough In Plumbing) (1)  10.04.2023    
-- -- Inspection (Rough In Electric) (1)  10.04.2023    
-- -- Inspection (Framing) (1) *   10.04.2023    
-- -- Inspection (Deck Piers) (0)  10.30.2023    
-- -- Exterior Vinyl (0) *   11.30.2023     Almost completed 11/25
-- -- Exterior Stone (0)  12.06.2023     In process December 3
-- -- Insulation (2) *   10.07.2023    
-- -- Inspection (Insulation) (1)  10.09.2023    
-- -- Inspection (Electric Service) (0)  10.30.2023    
-- -- Set Electric Meter (0) *   12.11.2023    
-- -- Inspection (Main Sewer Line) (0)  11.09.2023    
-- -- Inspection (Main Water Line) (0)  11.09.2023    
-- -- Order Interior Doors & Trim (0)  11.09.2023    
-- -- Drywall (Hang) (4) *   10.14.2023     Bonus Room, Bonus Bath
-- -- Loan Approval (0)  12.06.2023    
-- -- Deed Preparation (0)  11.09.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   10.28.2023     In process 10/25
-- -- Paint 1 (1)  11.01.2023     In process 10/28
-- -- Garage Door (0)  11.25.2023    
-- -- House Numbers (0)  12.14.2023     Jill
-- -- Mailbox (0)  12.21.2023     in process 12/20
-- -- Cabinet Installation (2) *   11.04.2023     In process 11/1
-- -- Granite Installation (1) *   11.08.2023    
-- -- Interior Trim - Install (3) *   11.25.2023     In process 11/15
-- -- Order Plumbing / Lighting Fixtures (0)  11.16.2023    
-- -- Interior Trim - Paint (1)  11.29.2023    
-- -- Luxury Vinyl Plank (3) *   12.03.2023     Was ready November 28, but Denny is on another job. Starting as soon as he’s finished.
-- -- Luxury Vinyl Tile (0)  12.03.2023    
-- -- Paint 2 (3)  12.09.2023     In process 12/6
-- -- Cover Floors (0)  12.13.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  11.30.2023    
-- -- Shoe Moulding (0)  12.06.2023    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   12.09.2023     BRUSHED NICKEL, BONUS. In process 12/6
-- -- Install Coded Lockbox (add extra keys) (0)  12.09.2023    
-- -- Pay Water / Sewer Taps (0)  12.06.2023    
-- -- Set Water Meter (1) *   12.06.2023    
-- -- Electric Trim Out (3) *   12.15.2023     BRUSHED NICKEL. In process. Mostly basement needs completed
-- -- Ceiling Fans (0)  12.13.2023     NO UPGRADE
-- -- HVAC Trim Out (1) *   12.06.2023    
-- -- Blower Door Test (1)  12.15.2023     Mon, Dec 11 or Tue, Dec 12
-- -- Plumbing Trim Out (2) *   12.09.2023     BRUSHED NICKEL. In process 12/6
-- -- Install Appliances (0) *   12.09.2023    
-- -- Paint 3 (2) *   12.09.2023    
-- -- Carpet (2)  12.06.2023     being installed 12/4
-- -- Appraiser Confirms Construction Completion (0)  12.19.2023    
-- -- Inspection (Final HVAC) (0)  12.18.2023    
-- -- Inspection (Final Plumbing) (0)  12.18.2023    
-- -- Inspection (Final Electric) (0)  12.18.2023    
-- -- Inspection (Final Building) (4) *   12.18.2023     Mon, Dec 18
-- -- Pre Walk Through (0)  12.19.2023    
-- -- Stain Hardwood Stairs (1) *   12.16.2023     In process 12/13
-- -- Cleaning (1)  12.20.2023    
-- -- Certificate of Occupancy (1) *   12.19.2023    
-- -- C.O. to Lender (0)  12.19.2023    
-- -- Schedule Closing (0)  12.20.2023    
-- -- Buyer Walk Through (1) *   12.20.2023     Tuesday, Dec 19, 9AM
-- -- Payment for Upgrades (0)  12.11.2023    
-- -- Keys to Settlement Agent (0)  12.19.2023    
-- -- Review Settlement Statement (0)  12.20.2023    
-- -- Jerry Signs Closing Documents (0)  11.28.2023    
-- -- Request Trash Tote From POA Manager (0)  12.11.2023     We have one extra already!
-- -- Closing (1)  12.26.2023     Brittany @ West View Title - Fri, Dec 22
-- -- Remove Coded Lockbox (0)  01.15.2024     Leaving for repairs