Blemish on side panel k. Island |
Fred |
|
-- |
-- |
Cover carpet ASAP |
Jill |
|
-- |
-- |
Carpet transition strip needed to the hallway bathroom |
Eric, Denny |
|
-- |
-- |
Tint ding in fridge. Not sure anyone will notice but me-but making note of it. 1/10 |
|
|
-- |
-- |
Drywall repair needed outside of master bedroom |
Painter. In process 1/25. Needs finished 1/27 |
|
-- |
-- |
Lots of lightbulbs needed in 85 and 84 |
Jill, Electrician |
|
-- |
-- |
Microwave vent not functioning |
Tom, CJ |
|
-- |
-- |
With lights on 1/13 there are a few dings in fridge doors |
2/21: should arrive Mon, Feb 26 |
|
-- |
-- |
Attic cover needed |
|
|
-- |
-- |
Hall, bathroom, electric cover needed |
Electrician |
|
-- |
-- |
Powder bath light needed |
Electrician |
|
-- |
-- |
Can we get gray outlet covers for the kitchen island? |
Jill |
|
-- |
-- |
HVAC covers needed |
HVAC |
|
-- |
-- |
CODED LOCKBOX 8484 |
|
|
-- |
-- |
Mirrors needed |
Paul |
|
-- |
-- |
Screens |
Jill |
|
-- |
-- |
Grey receptacle covers neeed at kitchen island |
Electrician |
|
-- |
-- |
Whiteboard needed below front porch |
|
|
-- |
-- |
Touchup, screw holes in powder bath near light fixture |
Painter |
|
-- |
-- |
Adjust deadbolt patio doors to deck |
Paul, Joe |
|
-- |
-- |
Fill and paint screw holes by light and powder bath |
Painter |
|
-- |
-- |
Adjust closet doors upstairs |
Jill |
|
-- |
-- |
Missing, screw switch plate cover upstairs hall bathroom |
Electrician |
|
-- |
-- |
Repaint attic, access store |
Painter |
|
-- |
-- |
Clean mud off of carpet in master closet |
Jill |
|
-- |
-- |
Mud to be cleaned off carpet all over the upstairs around the plastic |
Jill |
|
-- |
-- |
Missing piece of shoe mold, on island, closest to pantry |
George |
|
-- |
-- |
Actually missing shoe mold on both sides of island |
George - on site |
|
-- |
-- |
Sod |
|
|
-- |
-- |
The patio screen door is badly stained and doesn’t seem to close correctly |
Jill |
|
-- |
-- |
Touch up paint |
Painter |
|
-- |
-- |
Missing screw at the front door hinge |
Jill |
|
-- |
-- |
Repair two nicks in hall bath shower wall |
Jill will check |
|
-- |
-- |
Remove glue from master bath shower |
Jill |
|
-- |
-- |
Adjust closet doors in bedrooms |
Jill |
|
-- |
-- |
Paint shoe mold at the front door |
Painter |
|
-- |
-- |
Re-clean floors before closing? |
Kristen 2/28 |
|
-- |
-- |
New refrigerator is inside the front door |
as of Feb 27, per Leisa |
|
-- |
-- |
Piece of siding has fallen down in the front |
Davenport |
|
-- |
-- |
New Amendment |
4/4: sent to Jerry for signatures |
|
-- |
-- |
Loose siding above main level front windows |
|
|
-- |
-- |
Loose siding above main level front window roof |
Davenport |
|
-- |
-- |
Damaged siding at back of townhouse by heat pump |
Davenport |
|
-- |
-- |
Water entry into basement below back basement windows |
Tom |
|
-- |
-- |
Remove insulation next to air handler electrical wiring |
Tom |
|
-- |
-- |
Finish the taping at the HVAC plenum |
Tom |
|
-- |
-- |
Repair cracked truss |
Tom |
|
-- |
-- |
Need 1 piece of weather stripping in front door |
Jill |
|
-- |
-- |
Living room window trim needs paint touch ups |
|
|
-- |
-- |
Clean around the window of the deck door on inside |
Jill |
|
-- |
-- |
Change white receptacles to grey ones |
Allen |
|
-- |
-- |
Both sides of the kitchen window |
|
|
-- |
-- |
Paint touch ups throughout home |
Painters |
|
-- |
-- |
Master bathroom cabinets need some touch ups |
Jill |
|
-- |
-- |
Kitchen cabinets need some touch ups |
Jill |
|
-- |
-- |
Frame around the basement window on the inside needs replaced, it’s really knocked up bad |
George or Tom |
|
-- |
-- |
Caulk the basement window on the outside |
Tom |
|
-- |
-- |
Fill and paint inside of basement window frame |
Painter |
|
-- |
-- |
Ratified Contract? (0)
07.02.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0)
07.06.2023 |
|
|
-- |
-- |
Association Packet Requested (0)
07.02.2023 |
|
|
-- |
-- |
Association Packet Received (0)
07.08.2023 |
|
|
-- |
-- |
Selections Meeting (0)
07.22.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0)
09.13.2023 |
9/7: Sent to Kozhin; 9/11: Reminded Kozhin; |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
09.14.2023 |
9/13: Sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0)
09.13.2023 |
|
|
-- |
-- |
Building Permit (30)
06.01.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
09.25.2023 |
|
|
-- |
-- |
Order Windows & Doors (0)
10.28.2023 |
|
|
-- |
-- |
Stake Out Home (1)
06.01.2023 |
|
|
-- |
-- |
Excavate (2)
06.01.2023 |
|
|
-- |
-- |
Inspection (Footers) (1)
06.01.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
06.01.2023 |
|
|
-- |
-- |
Pour Footers (1)
06.01.2023 |
|
|
-- |
-- |
Set Forms (2)
06.12.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1)
06.12.2023 |
|
|
-- |
-- |
Plumb Slab (2)
06.26.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
06.26.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
07.24.2023 |
|
|
-- |
-- |
Prepare Slab (1)
07.24.2023 |
|
|
-- |
-- |
Inspection (Slab) (1)
07.24.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
07.24.2023 |
|
|
-- |
-- |
Pour Slab (1)
07.24.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
09.15.2023 |
|
|
-- |
-- |
Framing I (9)
09.11.2023 |
in process 8/30 |
|
-- |
-- |
Order Steps (0)
10.12.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0)
10.28.2023 |
|
|
-- |
-- |
Framing II (8)
09.11.2023 |
|
|
-- |
-- |
Framing III (8)
10.05.2023 |
|
|
-- |
-- |
Verify Window & Roof Structure (0)
12.11.2023 |
|
|
-- |
-- |
Install Stairs (0)
10.12.2023 |
|
|
-- |
-- |
Windows & Doors (0)
11.01.2023 |
|
|
-- |
-- |
House Number and Status in Window (0)
11.02.2023 |
|
|
-- |
-- |
Roofing (0)
10.30.2023 |
|
|
-- |
-- |
Order Cabinets (0)
10.30.2023 |
|
|
-- |
-- |
Order Appliances (0)
09.14.2023 |
STANDARD SS |
|
-- |
-- |
Deck (0)
10.28.2023 |
12 x 18 DECK |
|
-- |
-- |
Gutters (0)
12.20.2023 |
|
|
-- |
-- |
Driveway (0)
01.31.2024 |
NO UPGRADE - Tuesday, Jan 30 |
|
-- |
-- |
Patio (0)
11.15.2023 |
NO UPGRADE |
|
-- |
-- |
Privacy Divider / Fence (0)
01.19.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
02.10.2024 |
|
|
-- |
-- |
HVAC Rough In (4)
10.26.2023 |
in process 10/14 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
11.12.2023 |
|
|
-- |
-- |
Rough In Microwave Vent (0)
12.11.2023 |
|
|
-- |
-- |
Plumbing Rough In (4)
10.28.2023 |
in process 10/25 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
11.12.2023 |
|
|
-- |
-- |
Electric Rough In (4)
11.08.2023 |
In process 11/4 |
|
-- |
-- |
Inspection (Rough In Electric) (1)
11.12.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
12.28.2023 |
|
|
-- |
-- |
Inspection (Framing) (1)
11.12.2023 |
|
|
-- |
-- |
Exterior Vinyl (0)
12.16.2023 |
In process 12/13 |
|
-- |
-- |
Exterior Stone (0)
12.20.2023 |
|
|
-- |
-- |
Insulation (2)
11.12.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1)
11.16.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
12.18.2023 |
|
|
-- |
-- |
Set Electric Meter (0)
01.08.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
12.18.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
12.18.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
12.18.2023 |
|
|
-- |
-- |
Drywall (Hang) (4)
11.20.2023 |
NO UPGRADE |
|
-- |
-- |
Loan Approval (0)
05.07.2024 |
USDA |
|
-- |
-- |
Deed Preparation (0)
01.18.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
11.29.2023 |
In process 11/25 |
|
-- |
-- |
Paint 1 (1)
12.03.2023 |
In process 11/29 |
|
-- |
-- |
Garage Door (0)
12.04.2023 |
|
|
-- |
-- |
House Numbers (0)
01.29.2024 |
|
|
-- |
-- |
Mailbox (0)
12.23.2023 |
|
|
-- |
-- |
Cabinet Installation (2)
12.03.2023 |
|
|
-- |
-- |
Granite Installation (1)
12.13.2023 |
|
|
-- |
-- |
Interior Trim - Install (3)
12.09.2023 |
In process 12/6 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
12.18.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1)
12.13.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
12.16.2023 |
In process 12/13 |
|
-- |
-- |
Luxury Vinyl Tile (0)
12.16.2023 |
In process 12/13 |
|
-- |
-- |
Paint 2 (3)
12.16.2023 |
|
|
-- |
-- |
Cover Floors (1)
12.23.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
01.10.2024 |
|
|
-- |
-- |
Shoe Moulding (0)
12.23.2023 |
In process 12/20 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
01.27.2024 |
All mirrors needed 1/19 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
01.25.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
12.28.2023 |
|
|
-- |
-- |
Set Water Meter (0)
01.11.2024 |
|
|
-- |
-- |
Electric Trim Out (3)
01.13.2024 |
Black. Almost completed 1/13 |
|
-- |
-- |
Ceiling Fans (0)
01.10.2024 |
NO UPGRADE |
|
-- |
-- |
HVAC Trim Out (1)
01.17.2024 |
|
|
-- |
-- |
Blower Door Test (1)
01.22.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2)
01.03.2024 |
Black. In process 12/23 |
|
-- |
-- |
Install Appliances (0)
01.10.2024 |
On site 12/20 |
|
-- |
-- |
Paint 3 (2)
12.20.2023 |
|
|
-- |
-- |
Carpet (2)
12.16.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
02.29.2024 |
Wed, Feb 28 |
|
-- |
-- |
Inspection (Final HVAC) (1)
02.01.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1)
02.01.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
02.01.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2)
02.05.2024 |
Reinspect, Fri, Feb 2 |
|
-- |
-- |
Pre Walk Through (0)
02.12.2024 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
12.23.2023 |
|
|
-- |
-- |
Cleaning (1)
02.14.2024 |
In process 2/10 |
|
-- |
-- |
Certificate of Occupancy (1)
02.10.2024 |
|
|
-- |
-- |
C.O. to Lender (0)
02.10.2024 |
|
|
-- |
-- |
Schedule Closing (0)
05.07.2024 |
|
|
-- |
-- |
Buyer Walk Through (1)
02.15.2024 |
Tues, Feb 13, 2PM |
|
-- |
-- |
Payment for Upgrades (0)
01.25.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
01.25.2024 |
|
|
-- |
-- |
Review Settlement Statement (0)
05.07.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
05.07.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
02.02.2024 |
|
|
-- |
-- |
Closing (1)
05.13.2024 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0)
05.16.2024 |
|
|