One Triple Window Instead Of Two Single Windows? |
|
|
-- |
-- |
One Triple Window Instead Of Two Single Windows! |
Tom - Please order triple window - Thanks! |
|
-- |
-- |
Lots of bath tub covers in the garage of this unit |
|
|
-- |
-- |
Drywall repair basement |
In process 2/10 |
|
-- |
-- |
Bath vanity handle needs attached |
Fred - master bath |
|
-- |
-- |
Finish drywall in garage |
after appliances are out. In process 2/24 |
|
-- |
-- |
Cover countertops |
Jill |
|
-- |
-- |
This house is painted wrong color in a few spaces. Mbed and Mbath |
|
|
-- |
-- |
Door hardware is black |
should be brushed nickel - Jill |
|
-- |
-- |
Cracked laundry door frame |
Painter |
|
-- |
-- |
Missing bottom bonus tub fixture |
Plumber |
|
-- |
-- |
Electric covers in master bed and cable covers needed. Bonus bath light fixture. |
And upstairs bedroom, electrician |
|
-- |
-- |
Bonus bath accessories and doorknobs needed |
Paul |
|
-- |
-- |
Finish trimout of smoke detector in living room |
Electrician |
|
-- |
-- |
Finish electric, trim out in powder bath |
Electrician |
|
-- |
-- |
Microwave vent is not functional |
Tom |
|
-- |
-- |
Cover needed on the kitchen island outlet |
Electrician |
|
-- |
-- |
Needs all HVAC covers |
HVAC |
|
-- |
-- |
Hall bathroom, electric cover needed |
Electrician |
|
-- |
-- |
Paul bathroom is missing a few plumbing trim out pieces |
Plumber - hall bath |
|
-- |
-- |
Attic, cover needed |
Painter. Needs painted. |
|
-- |
-- |
CODED LOCKBOX 7979 |
|
|
-- |
-- |
Repaint front door |
Painter |
|
-- |
-- |
Plastic threshold is broken here |
On order |
|
-- |
-- |
Glue on the bonus bathtub wall center |
Courtney |
|
-- |
-- |
Remove plastic from light in bonus room |
Courtney- after bonus room ceiling is painted |
|
-- |
-- |
Install windows screens |
Kristen |
|
-- |
-- |
Remove extra boxes from closet under stairs |
Kenny. Where should these go? |
|
-- |
-- |
Remove trash from back deck |
Kenny |
|
-- |
-- |
Screw needed in drawer to right of sink for hardware |
Fred - kitchen |
|
-- |
-- |
Fill nail holes above and below light in powder bath |
Painter |
|
-- |
-- |
Gap and trim near landing at riser |
Painter, Trim |
|
-- |
-- |
Gap and trim near landing at riser |
|
|
-- |
-- |
Carpet to be cleaned on the stairs top of hallway |
Jill |
|
-- |
-- |
Hall, bathroom, drywall patch outside of escutcheon |
Painter |
|
-- |
-- |
Paint, attic access |
Painter |
|
-- |
-- |
Remove both sets of ladders from master bedroom |
Kenny |
|
-- |
-- |
Missing hardware center drawer, master bath |
|
|
-- |
-- |
Front door needs adjusting |
|
|
-- |
-- |
USDA loan - delayed closing |
USDA |
|
-- |
-- |
Paint drywall in garage |
|
|
-- |
-- |
Repaint hinge area on bannister |
Painter |
|
-- |
-- |
Replace bonus room light because it is damaged - not by me! |
Electrician |
|
-- |
-- |
Trim, needed, in garage |
Trim, George |
|
-- |
-- |
Black stains on quartz countertops |
Kate |
|
-- |
-- |
Owners say that guest bathroom light is crooked |
Electrician |
|
-- |
-- |
Master bathroom drawer has a very large gash in it and should probably just be replaced |
Fred - on order |
|
-- |
-- |
Remove two ladders |
Jill |
|
-- |
-- |
Touch up paint throughout |
Painters |
|
-- |
-- |
Scratches on the stairs |
Painters |
|
-- |
-- |
Remove small mud stains on the steps |
Jill |
|
-- |
-- |
Replace side panel on island |
Fred |
|
-- |
-- |
Clean blemishes in quartz countertop |
Cody taking a look at marks |
|
-- |
-- |
Paint Touch Up Throughout |
|
|
-- |
-- |
Center light over faucet in bathroom |
Electricians & painters |
|
-- |
-- |
Need cabinet touch up pen - White |
Fred |
|
-- |
-- |
Clean powder bath mirror |
Jill |
|
-- |
-- |
push snaplights close to ceiling throughout |
electricians |
|
-- |
-- |
straighten fan remote in living room |
electricians |
|
-- |
-- |
touch up cabinet trim at top of cabinet (blur taped) |
fred |
|
-- |
-- |
straighten the crooked electric covers throughout |
electricians |
|
-- |
-- |
Restraining steps 3/20 |
Restaining |
|
-- |
-- |
Clean townhouse |
|
|
-- |
-- |
Moulding at front door - extra material? |
|
|
-- |
-- |
Mark on side of kitchen island cabinet on window side |
|
|
-- |
-- |
Replace drawer front on primary bathroom center cabinet |
Fred - on order in this week or next (6/3) |
|
-- |
-- |
Bottom of left side bedroom closet door is damaged |
|
|
-- |
-- |
Sweep driveway |
|
|
-- |
-- |
Water leak |
|
|
-- |
-- |
Water leak in basement bonus room |
|
|
-- |
-- |
Ratified Contract? (0) 08.22.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 08.26.2023 |
|
|
-- |
-- |
Association Packet Requested (0) 08.22.2023 |
|
|
-- |
-- |
Association Packet Received (0) 08.23.2023 |
|
|
-- |
-- |
Selections Meeting (0) 09.26.2023 |
Thursday 9/21 @ 5:30 AM |
|
-- |
-- |
Selections Sheet Signed (0) 11.05.2023 |
10/4: Sent to Asma; |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 11.08.2023 |
11/6: Sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 11.07.2023 |
|
|
-- |
-- |
Building Permit (30) 06.22.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 10.05.2023 |
|
|
-- |
-- |
Order Windows & Doors (0) 10.26.2023 |
|
|
-- |
-- |
Stake Out Home (1) 07.02.2023 |
|
|
-- |
-- |
Excavate (2) 08.03.2023 |
|
|
-- |
-- |
Inspection (Footers) (1) 09.25.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.25.2023 |
|
|
-- |
-- |
Pour Footers (1) 09.11.2023 |
|
|
-- |
-- |
Set Forms (2) 09.11.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1) 09.11.2023 |
|
|
-- |
-- |
Plumb Slab (2) 09.11.2023 |
in process 8/30 |
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 09.25.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.25.2023 |
|
|
-- |
-- |
Prepare Slab (1) 09.18.2023 |
|
|
-- |
-- |
Inspection (Slab) (1) 09.25.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.25.2023 |
|
|
-- |
-- |
Pour Slab (1) * 09.21.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 11.15.2023 |
11/8: sent to Brittany |
|
-- |
-- |
Framing I (9) 10.05.2023 |
|
|
-- |
-- |
Order Steps (0) 10.26.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 10.26.2023 |
|
|
-- |
-- |
Framing II (8) 10.16.2023 |
|
|
-- |
-- |
Framing III (8) * 10.16.2023 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 12.13.2023 |
|
|
-- |
-- |
Install Stairs (0) 10.26.2023 |
|
|
-- |
-- |
Windows & Doors (0) 11.06.2023 |
|
|
-- |
-- |
House Number and Status in Window (0) 11.13.2023 |
|
|
-- |
-- |
Roofing (0) 10.30.2023 |
|
|
-- |
-- |
Order Cabinets (0) 12.06.2023 |
|
|
-- |
-- |
Order Appliances (0) 09.14.2023 |
STANDARD SS |
|
-- |
-- |
Deck (0) 10.28.2023 |
|
|
-- |
-- |
Gutters (0) 01.27.2024 |
|
|
-- |
-- |
Driveway (0) 02.08.2024 |
|
|
-- |
-- |
Patio (0) 01.03.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 02.24.2024 |
Patio privacy panels needed. In process 2/21 |
|
-- |
-- |
Sod / Seed / Landscaping (0) 03.30.2024 |
|
|
-- |
-- |
HVAC Rough In (4) 11.04.2023 |
In process 10/28 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 12.20.2023 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 12.20.2023 |
|
|
-- |
-- |
Plumbing Rough In (4) 12.03.2023 |
In process 11/15 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 12.20.2023 |
|
|
-- |
-- |
Electric Rough In (4) 12.03.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 12.20.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 01.18.2024 |
|
|
-- |
-- |
Inspection (Framing) (1) 12.20.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 01.18.2024 |
|
|
-- |
-- |
Exterior Stone (0) 01.29.2024 |
|
|
-- |
-- |
Insulation (2) 12.20.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1) 12.20.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 01.15.2024 |
|
|
-- |
-- |
Set Electric Meter (0) 01.18.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 01.18.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 01.18.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 01.17.2024 |
|
|
-- |
-- |
Drywall (Hang) (4) * 12.20.2023 |
|
|
-- |
-- |
Loan Approval (0) 05.20.2024 |
USDA |
|
-- |
-- |
Deed Preparation (0) 02.12.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 01.10.2024 |
In process 1/3 |
|
-- |
-- |
Paint 1 (1) 01.17.2024 |
In process 1/10 |
|
-- |
-- |
Garage Door (0) 02.21.2024 |
|
|
-- |
-- |
House Numbers (0) 02.17.2024 |
|
|
-- |
-- |
Mailbox (0) 02.24.2024 |
Patio privacy panels needed. In process 2/21 |
|
-- |
-- |
Cabinet Installation (2) * 01.06.2024 |
Dec 4 |
|
-- |
-- |
Granite Installation (1) * 01.19.2024 |
|
|
-- |
-- |
Interior Trim - Install (3) 01.25.2024 |
In process 1/19 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 01.25.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 01.27.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 02.03.2024 |
In process 1/31 |
|
-- |
-- |
Luxury Vinyl Tile (0) 02.03.2024 |
|
|
-- |
-- |
Paint 2 (3) 02.03.2024 |
|
|
-- |
-- |
Cover Floors (1) 02.03.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 02.05.2024 |
|
|
-- |
-- |
Shoe Moulding (0) 02.14.2024 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 02.14.2024 |
Needs mirrors and few door knobs |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 02.21.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 02.05.2024 |
|
|
-- |
-- |
Set Water Meter (0) 02.19.2024 |
|
|
-- |
-- |
Electric Trim Out (3) 02.14.2024 |
Started 2/10 |
|
-- |
-- |
Ceiling Fans (0) 02.14.2024 |
|
|
-- |
-- |
HVAC Trim Out (1) 02.17.2024 |
|
|
-- |
-- |
Blower Door Test (1) 02.21.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2) 02.17.2024 |
Almost com0lete 2/14 |
|
-- |
-- |
Install Appliances (0) * 02.17.2024 |
|
|
-- |
-- |
Paint 3 (2) * 02.17.2024 |
|
|
-- |
-- |
Carpet (2) 02.03.2024 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 03.07.2024 |
Appraisal - Tue, Feb 27 |
|
-- |
-- |
Inspection (Final HVAC) (1) 02.22.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 02.22.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 02.22.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 02.22.2024 |
|
|
-- |
-- |
Pre Walk Through (0) 03.07.2024 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 02.17.2024 |
In process 2/14 |
|
-- |
-- |
Cleaning (1) 03.04.2024 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 02.24.2024 |
|
|
-- |
-- |
C.O. to Lender (0) 02.24.2024 |
|
|
-- |
-- |
Schedule Closing (0) 05.20.2024 |
|
|
-- |
-- |
Buyer Walk Through (1) 03.09.2024 |
Friday, March 8 at 1PM |
|
-- |
-- |
Payment for Upgrades (0) 02.22.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 02.24.2024 |
|
|
-- |
-- |
Review Settlement Statement (0) 05.29.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 03.22.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 02.22.2024 |
|
|
-- |
-- |
Closing (1) 05.29.2024 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 06.06.2024 |
|
|