1 33 37 89 47 73 67 55 56 59 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 41  ::  1450 Appaloosa Court
[ BUILD: 20230928 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Broken dining window room, trim, can this be repaired?
--   --   Needs venting for microwave
--   --   Broken window frame. Repairable?
--   --   Make sure vinyl folks don’t forget to patch the nail holes on the whiteboard blew the top front windows Davenport - below the top front windows
--   --   Cover carpet asap
--   --   Patch drywall hole above closet door Blue taped, Painter, Drywaller
--   --   Light needed in garage
--   --   Grey glue stuck to door Jill
--   --   Powder bath light needed Electrician
--   --   Multiple light covers needed throughout. Switchplate. . In bonus room
--   --   Attic cover needed Painter. Needs painting 3/13
--   --   CODED LOCKBOX 4141
--   --   Drywall repair needed in garage painters
--   --   Drywall repair need near front door painters
--   --   Drywall patch needed on ceiling of kitchen painters
--   --   Appliances did not come with hoses for hookups. CJ is ordering Monday, will arrive Tuesday, and CJ will then install appliances. In process 3/13
--   --   Screen door needs installed Tom
--   --   Paint touch up needed Painter
--   --   Large scratch hall bath New cabinet front is in, but needs installed
--   --   Variety of drywall repair is needed in garage
--   --   Variety of the repairs needed in garage Drywall and paint
--   --   Cover cable outlet in garage Tom
--   --   Bathtub hole in bonus Tuesday, March 19
--   --   Significant gash in stair molding to bedroom level Skirt - trim, painter - on the way to bedroom level
--   --   Tighten one snap light in living room to the ceiling Electrician
--   --   Patio door to deck does not lock easily Paul or Joe or Savannah
--   --   Clean out garage Jill
--   --   Put attic, access panel in place Painter or Jill
--   --   Remove stairs from master bedroom and master bathroom Remove ladders
--   --   Upstairs closet doors to be adjusted Jill
--   --   Small area to touch up paint in living room Painter
--   --   Small area to touch up paint in living room
--   --   Need sod before closing can happen
--   --  
--   --   Paint touchup needed in garage Painter
--   --   Remove glue from master bath tub Jill
--   --   Repaint molding at front door interior Painter
--   --   Shampoo bonus room carpet Jill
--   --   Scrape garage floor
--   --   Change handrail brackets to black
--   --   Paint touch up throughout
--   --   Make sure buyers transferred utilities
--   --   Fill in the nail holes in cabinet trim in all bathrooms Jill
--   --   Fill in the nail holes in cabinet trim in all bathrooms
--   --   scrape garage floor
--   --   Remove glue master shower
--   --   gash in trim to second floor
--   --   change handrail brackets to black
--   --   Paint touch up throughout
--   --   Missing Exterior Attic Vent Jeremy - Davenport
--   --   Missing Exterior Attic Vent
-- -- Ratified Contract? (0)  10.04.2023    
-- -- $2500 Deposit Received (0)  10.10.2023    
-- -- Association Packet Requested (0)  10.04.2023    
-- -- Association Packet Received (0)  10.08.2023    
-- -- Selections Meeting (0)  10.08.2023    
-- -- Selections Sheet Signed (0)  10.10.2023     10/8: Sent to Tekle;
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  10.11.2023     10/10: Sent to Jerry
-- -- Deposit For Upgrades Received (0)  10.10.2023    
-- -- Building Permit (30)  09.11.2023    
-- -- Order Roof & Floor Trusses (1)  11.06.2023    
-- -- Order Windows & Doors (0)  11.20.2023    
-- -- Stake Out Home (1)  08.14.2023    
-- -- Excavate (2)  08.14.2023    
-- -- Inspection (Footers) (1)  08.14.2023    
-- -- Inspection (Concrete Wall) (1)  10.05.2023    
-- -- Pour Footers (1)  08.14.2023    
-- -- Set Forms (2)  09.11.2023    
-- -- Pour Foundation Walls (1)  09.11.2023    
-- -- Plumb Slab (2)  09.18.2023    
-- -- Inspection (Plumbing Under Slab) (1)  10.05.2023    
-- -- Inspection (Conduit Under Slab) (1)  10.05.2023    
-- -- Prepare Slab (1)  10.05.2023    
-- -- Inspection (Slab) (1)  10.05.2023    
-- -- Inspection (Drain Tile) (0)  10.05.2023    
-- -- Pour Slab (1) *   10.19.2023    
-- -- Settlement Agent Confirmed (0)  10.13.2023    
-- -- Framing I (9)  10.26.2023    
-- -- Order Steps (0)  11.20.2023    
-- -- Order Tubs / Showers (0)  11.20.2023    
-- -- Framing II (8)  10.26.2023    
-- -- Framing III (8) *   11.25.2023    
-- -- Verify Window & Roof Structure (0)  12.13.2023    
-- -- Install Stairs (0)  11.25.2023    
-- -- Windows & Doors (0)  12.13.2023    
-- -- House Number and Status in Window (0)  12.13.2023    
-- -- Roofing (0)  12.13.2023    
-- -- Order Cabinets (0)  12.19.2023    
-- -- Order Appliances (0)  03.07.2024     FRENCH. On site need installed.
-- -- Deck (0)  01.10.2024    
-- -- Gutters (0)  02.05.2024    
-- -- Driveway (0)  03.06.2024    
-- -- Patio (0)  03.06.2024     Needs poured 2/28
-- -- Privacy Divider / Fence (0)  02.24.2024     Patio privacy panels needed. In process 2/21
-- -- Sod / Seed / Landscaping (0)  03.28.2024    
-- -- HVAC Rough In (4)  12.13.2023     in process 12/3
-- -- Inspection (Rough In HVAC) (1)  12.26.2023    
-- -- Rough In Microwave Vent (0)  12.13.2023    
-- -- Plumbing Rough In (4)  12.16.2023     in process 12/3
-- -- Inspection (Rough In Plumbing) (1)  12.26.2023    
-- -- Electric Rough In (4)  12.20.2023     In process 12/16
-- -- Inspection (Rough In Electric) (1)  12.26.2023    
-- -- Inspection (Deck Piers) (0)  02.19.2024    
-- -- Inspection (Framing) (1)  12.26.2023    
-- -- Exterior Vinyl (0) *   02.05.2024     In process 1/19
-- -- Exterior Stone (0)  02.28.2024     Patio privacy panels needed. In process 2/21
-- -- Insulation (2)  01.03.2024     Ready 12/21
-- -- Inspection (Insulation) (1)  01.03.2024    
-- -- Inspection (Electric Service) (0)  02.08.2024    
-- -- Set Electric Meter (0)  03.06.2024    
-- -- Inspection (Main Sewer Line) (0)  02.05.2024    
-- -- Inspection (Main Water Line) (0)  02.05.2024    
-- -- Order Interior Doors & Trim (0)  02.05.2024    
-- -- Drywall (Hang) (4) *   01.03.2024    
-- -- Loan Approval (0)  11.10.2023    
-- -- Deed Preparation (0)  02.22.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   01.17.2024     In process 1/10
-- -- Paint 1 (1)  01.25.2024    
-- -- Garage Door (0)  02.24.2024     In process 2/21
-- -- House Numbers (0)  03.09.2024    
-- -- Mailbox (0)  03.28.2024    
-- -- Cabinet Installation (2) *   01.25.2024     Jan 24
-- -- Granite Installation (1) *   01.27.2024    
-- -- Interior Trim - Install (3)  02.07.2024     In process 2/3
-- -- Order Plumbing / Lighting Fixtures (0)  02.08.2024    
-- -- Interior Trim - Paint (1)  02.07.2024    
-- -- Luxury Vinyl Plank (3) *   02.17.2024     In process 2/14
-- -- Luxury Vinyl Tile (0)  02.17.2024     In process 2/10
-- -- Paint 2 (3)  01.27.2024    
-- -- Cover Floors (1)  02.24.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  02.15.2024    
-- -- Shoe Moulding (0)  02.21.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  02.28.2024     Shelving in 2/24
-- -- Install Coded Lockbox (add extra keys) (0)  03.07.2024    
-- -- Pay Water / Sewer Taps (0)  02.19.2024    
-- -- Set Water Meter (0)  02.26.2024    
-- -- Electric Trim Out (3)  03.09.2024     Still needs a bit done 3/2
-- -- Ceiling Fans (0)  03.02.2024    
-- -- HVAC Trim Out (1)  03.02.2024    
-- -- Blower Door Test (1)  03.14.2024     all 4 3/12
-- -- Plumbing Trim Out (2)  02.28.2024     In process 2/24
-- -- Install Appliances (0) *   03.14.2024     French. In process 3/13
-- -- Paint 3 (2) *   02.24.2024    
-- -- Carpet (2)  02.21.2024     In process 2/14
-- -- Appraiser Confirms Construction Completion (0)  04.01.2024    
-- -- Inspection (Final HVAC) (1)  03.18.2024     Anticipating final 3/13
-- -- Inspection (Final Plumbing) (1)  03.18.2024    
-- -- Inspection (Final Electric) (1)  03.18.2024    
-- -- Inspection (Final Building) (2) *   03.18.2024    
-- -- Pre Walk Through (0)  03.22.2024    
-- -- Stain Hardwood Stairs (1)  03.06.2024    
-- -- Cleaning (1)  03.30.2024     after 42
-- -- Certificate of Occupancy (1) *   03.22.2024    
-- -- C.O. to Lender (0)  03.22.2024    
-- -- Schedule Closing (0)  03.26.2024    
-- -- Buyer Walk Through (1)  04.01.2024     Monday, 1PM
-- -- Payment for Upgrades (0)  03.22.2024    
-- -- Keys to Settlement Agent (0)  03.22.2024    
-- -- Review Settlement Statement (0)  03.22.2024    
-- -- Jerry Signs Closing Documents (0)  03.22.2024    
-- -- Request Trash Tote From POA Manager (0)  03.28.2024    
-- -- Closing (1)  04.02.2024     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  04.08.2024