CONGERS-2 - 44  ::  1438 Appaloosa Court
[ BUILD: 20230925 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
Finish drywall in garage Appears to just need to be painted
Loose trim around garage Davenport
Cover all the floors
USDA loan - delayed closing
Powder bath needs light 3/9 Electrician
More stone is going to be needed in front of townhouse Stone guys
Hall light switch cover needed in bath
Dent in refrigerator door
CODED LOCKBOX 4444
Reattach gutter hardware Davenport
Install shower bar in master bath Paul
Attic, cover needed Painters
Lots and lots of glue in hall bathtub Drywallers
Mud on bonus room carpet needs removed Jill
Few spots of glue on master bathroom floor Jill
Sweet out garage Jill
Glue on bonus room bathtub Jill
Townhouse needs touch up cleaning after paint touch up Lynn
A small bit of glue on hall bath Jill
Few spots of mud on upstairs carpet Jill
Need air filter
Remove cover from smoke detectoor
Remove cover from smoke detector Jill
Mark property line out back Tom
Pressure wash
Scrape garage floor
Siding is falling down in front of townhouse Davenport
UPGRADES - COMPLETED
    Expanded Driveway  
    Finished Bonus Room  
    Finish Bonus Bathroom  
    Microwave vented to exterior  
    Amendment to increase price by $18,270  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  09.04.2023    
-- -- $2500 Deposit Received (0)  09.07.2023    
-- -- Association Packet Requested (0)  09.04.2023    
-- -- Association Packet Received (0)  09.07.2023    
-- -- Selections Meeting (0)  09.14.2023     Tuesday 9/12 at 1:00 PM
-- -- Selections Sheet Signed (0)  09.24.2023     9/21: Sent to Tekle
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  09.27.2023     9/25: Sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  09.26.2023    
-- -- Building Permit (30) *   09.11.2023    
-- -- Order Roof & Floor Trusses (1)  11.06.2023    
-- -- Order Windows & Doors (0)  11.20.2023    
-- -- Stake Out Home (1)  08.14.2023    
-- -- Excavate (2)  08.14.2023    
-- -- Inspection (Footers) (1)  08.14.2023    
-- -- Inspection (Concrete Wall) (1)  11.27.2023    
-- -- Pour Footers (1) *   08.14.2023    
-- -- Set Forms (2)  09.11.2023    
-- -- Pour Foundation Walls (1)  09.11.2023    
-- -- Plumb Slab (2)  10.05.2023    
-- -- Inspection (Plumbing Under Slab) (1)  10.05.2023    
-- -- Inspection (Conduit Under Slab) (1)  10.05.2023    
-- -- Prepare Slab (1)  10.05.2023    
-- -- Inspection (Slab) (1)  10.05.2023    
-- -- Inspection (Drain Tile) (0)  10.05.2023    
-- -- Pour Slab (1) *   10.19.2023    
-- -- Settlement Agent Confirmed (0)  09.30.2023    
-- -- Framing I (9)  10.26.2023    
-- -- Order Steps (0)  11.20.2023    
-- -- Order Tubs / Showers (0)  11.20.2023    
-- -- Framing II (8)  10.26.2023    
-- -- Framing III (8) *   11.25.2023    
-- -- Verify Window & Roof Structure (0)  12.13.2023    
-- -- Install Stairs (0) *   11.25.2023    
-- -- Windows & Doors (0) *   12.13.2023    
-- -- House Number and Status in Window (0)  12.09.2023    
-- -- Roofing (0) *   12.13.2023    
-- -- Order Cabinets (0)  12.19.2023    
-- -- Order Appliances (0)  03.06.2024     Standard
-- -- Deck (0)  01.07.2024    
-- -- Gutters (0)  02.05.2024    
-- -- Driveway (0) *   02.21.2024    
-- -- Patio (0)  03.06.2024    
-- -- Privacy Divider / Fence (0) *   02.26.2024    
-- -- Sod / Seed / Landscaping (0)  03.30.2024    
-- -- HVAC Rough In (4)  12.20.2023     In process 12/16
-- -- Rough In Microwave Vent (0)  12.20.2023    
-- -- Plumbing Rough In (4)  12.13.2023     In process 12/9
-- -- Electric Rough In (4)  01.03.2024    
-- -- Inspection (Rough In HVAC) (1)  12.26.2023    
-- -- Inspection (Rough In Plumbing) (1)  12.26.2023    
-- -- Inspection (Rough In Electric) (1)  01.03.2024    
-- -- Inspection (Framing) (1) *   01.03.2024    
-- -- Inspection (Deck Piers) (0)  02.19.2024    
-- -- Exterior Vinyl (0) *   01.27.2024     In process 1/19
-- -- Exterior Stone (0)  03.02.2024    
-- -- Insulation (2) *   01.03.2024    
-- -- Inspection (Insulation) (1)  01.06.2024    
-- -- Inspection (Electric Service) (0)  02.08.2024    
-- -- Set Electric Meter (0) *   03.06.2024    
-- -- Inspection (Main Sewer Line) (0)  02.05.2024    
-- -- Inspection (Main Water Line) (0)  02.05.2024    
-- -- Order Interior Doors & Trim (0)  02.05.2024    
-- -- Drywall (Hang) (4) *   01.10.2024     In process 1/6
-- -- Loan Approval (0)  04.11.2024     USDA
-- -- Deed Preparation (0)  03.07.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   01.25.2024     In process 1/17
-- -- Paint 1 (1)  01.27.2024    
-- -- Garage Door (0)  02.07.2024    
-- -- House Numbers (0)  03.09.2024    
-- -- Mailbox (0)  03.28.2024    
-- -- Cabinet Installation (2) *   01.27.2024    
-- -- Granite Installation (1) *   02.10.2024    
-- -- Interior Trim - Install (3) *   02.10.2024     In process 2/7
-- -- Order Plumbing / Lighting Fixtures (0)  02.08.2024    
-- -- Interior Trim - Paint (1)  02.14.2024    
-- -- Luxury Vinyl Plank (3) *   02.28.2024    
-- -- Luxury Vinyl Tile (0)  03.02.2024    
-- -- Paint 2 (3)  02.28.2024    
-- -- Cover Floors (0)  03.06.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  02.15.2024    
-- -- Shoe Moulding (0)  03.06.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   04.01.2024     shelving week of 3/18. In process 3/13
-- -- Install Coded Lockbox (add extra keys) (0)  03.20.2024    
-- -- Pay Water / Sewer Taps (0)  02.19.2024    
-- -- Set Water Meter (1) *   02.26.2024    
-- -- Electric Trim Out (3) *   03.09.2024     In process 3/6
-- -- Ceiling Fans (0)  03.06.2024    
-- -- HVAC Trim Out (1) *   03.06.2024     Thermostat being installed 2/28
-- -- Blower Door Test (1)  03.14.2024    
-- -- Plumbing Trim Out (2) *   03.16.2024    
-- -- Install Appliances (0) *   03.16.2024     DELIVERY 2/26 STANDARD
-- -- Paint 3 (2) *   03.13.2024    
-- -- Carpet (2)  03.02.2024    
-- -- Appraiser Confirms Construction Completion (0)  04.11.2024    
-- -- Inspection (Final HVAC) (0)  03.23.2024    
-- -- Inspection (Final Plumbing) (0)  03.23.2024    
-- -- Inspection (Final Electric) (0)  03.23.2024    
-- -- Inspection (Final Building) (4) *   03.23.2024    
-- -- Pre Walk Through (0)  04.04.2024    
-- -- Stain Hardwood Stairs (1) *   03.28.2024    
-- -- Cleaning (1)  04.03.2024     Started 3/30
-- -- Certificate of Occupancy (1) *   03.29.2024    
-- -- C.O. to Lender (0)  03.29.2024    
-- -- Schedule Closing (0)  04.11.2024    
-- -- Buyer Walk Through (1) *   04.08.2024    
-- -- Payment for Upgrades (0)  03.29.2024    
-- -- Keys to Settlement Agent (0)  03.22.2024    
-- -- Review Settlement Statement (0)  04.11.2024    
-- -- Jerry Signs Closing Documents (0)  04.18.2024    
-- -- Request Trash Tote From POA Manager (0)  03.28.2024    
-- -- Closing (1)  04.20.2024     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  04.22.2024