Broken bonus room window |
Sash on order |
|
-- |
-- |
Patch holes in concrete in utility space? |
Tom |
|
-- |
-- |
Preparing to paint trim 3/6 |
|
|
-- |
-- |
Why was trim removed in bedroom? |
|
|
-- |
-- |
Cover carpet |
|
|
-- |
-- |
Are they putting rock in between the driveways? |
|
|
-- |
-- |
I think sinks got delivered to the wrong house |
They are sitting and 75 but likely need to be installed and 74 |
|
-- |
-- |
Put trim back in smaller bedrooms |
George |
|
-- |
-- |
I don’t see the ceiling fan on site for living room |
Jill will check it out |
|
-- |
-- |
Drywall repair needed and kitchen ceiling |
In process 4/17 |
|
-- |
-- |
Drywall repair, carpet repair from water leak in master |
In process 4/10 |
|
-- |
-- |
Home inspection - Monday |
|
|
-- |
-- |
Home Inspection |
Monday, April 15 at 5PM |
|
-- |
-- |
recaulk basement patio door/boards that are missing in spots |
|
|
-- |
-- |
make sure drywall is secure on wall in basement utility space |
Drywaller |
|
-- |
-- |
structural bolts need to be extended longer/add washers |
Jeremiah |
|
-- |
-- |
add additional deck support brackets Should be every 4 feet |
|
|
-- |
-- |
fasteners are too close to the edge of the decking. Remove nails and installing fasteners properly. |
Jeremiah |
|
-- |
-- |
consider adding brackets or joist hangers on outer band connections to deck |
Jeremiah |
|
-- |
-- |
caulking where wood is exposed at front porch awning supports |
Davenport |
|
-- |
-- |
install white board below back door |
|
|
-- |
-- |
deck railing and post were not secured properly to tie the outside corner frame together. make sure post cannot seperate. |
Add 2 bolts. Tighten privacy panel that’s wobbly. |
|
-- |
-- |
kitchen window is slightly un-level |
Davenport - siding |
|
-- |
-- |
secure garage door electrical wires to wall inside of garage |
Tom |
|
-- |
-- |
install splashblocks correctly |
Tom |
|
-- |
-- |
repaint attic cover |
Painter |
|
-- |
-- |
caulk around meter base to create water barrier |
Painter |
|
-- |
-- |
ensure HVAC outdoor condensing unit is level on the pad. Inspector says its not level or in the center. |
Tom will level |
|
-- |
-- |
touch up paint |
Painter |
|
-- |
-- |
fix window in front living room. Retention clip pops out when upper sash is operated. |
|
|
-- |
-- |
Top door hinge on door leading to bonus room is loose. Tighten screws. |
Jill |
|
-- |
-- |
Door to hallway bathroom is not level. Adjust the door so it will stay open. |
Jill |
|
-- |
-- |
Install handrail on top few steps leading to upper level of home |
Not code |
|
-- |
-- |
complete drywall repairs in kitchen |
Drywaller, Painter. Needs painting 4/19 |
|
-- |
-- |
Damage to front door trim |
Painter |
|
-- |
-- |
Crack in tub |
Valley Tub Repair |
|
-- |
-- |
Squeaky floor at top of stairs |
Eagle was looking at 4/17 |
|
-- |
-- |
Attic cover needed |
Painter |
|
-- |
-- |
Patch nail holes top left window trim |
Davenport |
|
-- |
-- |
Add one more plant in front landscaping |
Pettit |
|
-- |
-- |
Titan to electrical outlets that are loose at wall in the hallway and smaller bedroom |
jill |
|
-- |
-- |
Install door, knobs, shelving, and mirrors |
Thu, Apr 25 |
|
-- |
-- |
Adjust kitchen window to the deck. It’s an eighth of an inch out of plum. |
Davenport needs to take a look 4/22 |
|
-- |
-- |
Paint touchup throughout |
Painter |
|
-- |
-- |
Vinyl box at hot water and laundry. One corner needs to be secured. |
|
|
-- |
-- |
Replace the Wright sink vanity faucet in the master bathroom |
Mazur |
|
-- |
-- |
Clean paint, overspray off all hinges |
Painter |
|
-- |
-- |
Power wash the front and the back of the home |
|
|
-- |
-- |
Plant front bush beside garage |
|
|
-- |
-- |
|
|
|
-- |
-- |
Crack in the hall bathtub |
|
|
-- |
-- |
CODED LOCKBOX 7575 |
|
|
-- |
-- |
Missing plant by front door |
Pettit |
|
-- |
-- |
Pressure wash rear of home |
Jill |
|
-- |
-- |
Ratified Contract? (0) 10.01.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 10.06.2023 |
|
|
-- |
-- |
Association Packet Requested (0) 10.01.2023 |
|
|
-- |
-- |
Association Packet Received (0) 10.08.2023 |
|
|
-- |
-- |
Selections Meeting (0) 10.12.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0) 10.14.2023 |
10/13: Sent to Courtney |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 10.19.2023 |
10/18: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 10.18.2023 |
|
|
-- |
-- |
Building Permit (30) 09.11.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 11.20.2023 |
|
|
-- |
-- |
Order Windows & Doors (0) 11.20.2023 |
|
|
-- |
-- |
Stake Out Home (1) 09.11.2023 |
|
|
-- |
-- |
Excavate (2) 09.11.2023 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.05.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 10.05.2023 |
|
|
-- |
-- |
Pour Footers (1) 09.11.2023 |
|
|
-- |
-- |
Set Forms (2) 09.11.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1) 09.11.2023 |
|
|
-- |
-- |
Plumb Slab (2) 10.05.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 10.16.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 10.16.2023 |
|
|
-- |
-- |
Prepare Slab (1) 10.16.2023 |
|
|
-- |
-- |
Inspection (Slab) (1) 10.16.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 02.19.2024 |
|
|
-- |
-- |
Pour Slab (1) * 10.16.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 10.26.2023 |
|
|
-- |
-- |
Framing I (9) 11.27.2023 |
|
|
-- |
-- |
Order Steps (0) 11.27.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 11.27.2023 |
|
|
-- |
-- |
Framing II (8) 11.27.2023 |
|
|
-- |
-- |
Framing III (8) * 11.27.2023 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 01.04.2024 |
|
|
-- |
-- |
Install Stairs (0) 01.04.2024 |
|
|
-- |
-- |
Windows & Doors (0) 01.04.2024 |
|
|
-- |
-- |
House Number and Status in Window (0) 01.31.2024 |
|
|
-- |
-- |
Roofing (0) 01.04.2024 |
|
|
-- |
-- |
Order Cabinets (0) 01.16.2024 |
|
|
-- |
-- |
Order Appliances (0) 03.11.2024 |
Standard |
|
-- |
-- |
Deck (0) 01.04.2024 |
|
|
-- |
-- |
Gutters (0) 03.09.2024 |
|
|
-- |
-- |
Driveway (0) 04.06.2024 |
|
|
-- |
-- |
Patio (0) 04.01.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 04.10.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 04.19.2024 |
|
|
-- |
-- |
HVAC Rough In (4) 01.10.2024 |
In process 1/6 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 01.25.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 01.10.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 01.13.2024 |
In process 1/10 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 01.25.2024 |
|
|
-- |
-- |
Electric Rough In (4) 01.27.2024 |
In process 1/25 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 01.31.2024 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 03.28.2024 |
|
|
-- |
-- |
Inspection (Framing) (1) 01.31.2024 |
|
|
-- |
-- |
Exterior Vinyl (0) * 03.07.2024 |
|
|
-- |
-- |
Exterior Stone (0) 03.28.2024 |
|
|
-- |
-- |
Insulation (2) 01.31.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1) 02.03.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 03.07.2024 |
|
|
-- |
-- |
Set Electric Meter (0) 03.29.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 02.15.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 02.15.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 03.11.2024 |
|
|
-- |
-- |
Drywall (Hang) (4) * 02.03.2024 |
|
|
-- |
-- |
Loan Approval (0) 10.13.2023 |
JoDee (90% LTV) |
|
-- |
-- |
Deed Preparation (0) 03.28.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 02.17.2024 |
In process 2/14 |
|
-- |
-- |
Paint 1 (1) 02.28.2024 |
|
|
-- |
-- |
Garage Door (0) 03.30.2024 |
|
|
-- |
-- |
House Numbers (0) 04.06.2024 |
|
|
-- |
-- |
Mailbox (0) 03.28.2024 |
|
|
-- |
-- |
Cabinet Installation (2) * 02.28.2024 |
On site 2/17 |
|
-- |
-- |
Granite Installation (1) * 02.28.2024 |
|
|
-- |
-- |
Interior Trim - Install (3) 03.02.2024 |
In process 2/28 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 03.11.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 03.09.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 03.20.2024 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 03.20.2024 |
|
|
-- |
-- |
Paint 2 (3) 03.13.2024 |
|
|
-- |
-- |
Cover Floors (1) 03.25.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 03.14.2024 |
|
|
-- |
-- |
Shoe Moulding (0) 04.06.2024 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 04.24.2024 |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 04.18.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 03.28.2024 |
|
|
-- |
-- |
Set Water Meter (0) 03.28.2024 |
|
|
-- |
-- |
Electric Trim Out (3) 04.03.2024 |
In process 3/30 |
|
-- |
-- |
Ceiling Fans (0) 03.30.2024 |
|
|
-- |
-- |
HVAC Trim Out (1) 03.30.2024 |
|
|
-- |
-- |
Blower Door Test (1) 04.08.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2) 04.03.2024 |
In process 3/30 |
|
-- |
-- |
Install Appliances (0) * 04.03.2024 |
Standard DELIVERY 3/18 |
|
-- |
-- |
Paint 3 (2) * 04.03.2024 |
|
|
-- |
-- |
Carpet (2) 03.20.2024 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 04.22.2024 |
Johnny Hensley - Apr 15 |
|
-- |
-- |
Inspection (Final HVAC) (1) 04.11.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 04.11.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 04.11.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 04.12.2024 |
|
|
-- |
-- |
Pre Walk Through (0) 04.18.2024 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 04.14.2024 |
In process 4/12 |
|
-- |
-- |
Cleaning (1) 04.19.2024 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 04.19.2024 |
|
|
-- |
-- |
C.O. to Lender (0) 04.19.2024 |
|
|
-- |
-- |
Schedule Closing (0) 04.16.2024 |
Friday, April 19th |
|
-- |
-- |
Buyer Walk Through (1) 04.19.2024 |
Thursday, April 18th at 6:45pm |
|
-- |
-- |
Payment for Upgrades (0) 04.16.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 04.15.2024 |
|
|
-- |
-- |
Review Settlement Statement (0) 04.16.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 03.22.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 04.15.2024 |
|
|
-- |
-- |
Closing (1) 04.22.2024 |
Brittany @ West View Title, Friday, April 19th |
|
-- |
-- |
Remove Coded Lockbox (0) 05.02.2024 |
|
|