Micro vented here too |
|
|
-- |
-- |
Is this bonus room supposed to be finished? It mentions flooring, but I see the bathroom and bonus room deleted. |
|
|
-- |
-- |
Shower walls need installed in master bath |
Drywall up 3/13 |
|
-- |
-- |
To farmhouse, sinks in garage |
|
|
-- |
-- |
Pretty big scratches on master vanity |
Jill |
|
-- |
-- |
Finish covering carpets |
|
|
-- |
-- |
Can we use another color that’s not white on the kitchen island receptacles |
|
|
-- |
-- |
Install floor trim in master bathroom |
George |
|
-- |
-- |
A few small drywall patches needed on stairwell |
|
|
-- |
-- |
Master bathroom toilet needs installed. Perhaps it’s not installed because this bathroom is missing trim? |
|
|
-- |
-- |
Lock is missing paint. Replace? |
|
|
-- |
-- |
CODED LOCKBOX 4646 |
|
|
-- |
-- |
Mirrors need installed in all bathrooms |
Being installed on Friday the 10th |
|
-- |
-- |
Final paint needs done |
Being done on Friday the 10th |
|
-- |
-- |
Shelving needed throughout the townhome |
Being installed on Friday the 10th |
|
-- |
-- |
Put handrails back up |
|
|
-- |
-- |
Screens need installed throughout |
Jill |
|
-- |
-- |
Caulk in the sink in all bathrooms |
|
|
-- |
-- |
Light bulb needed in the garage door opener |
|
|
-- |
-- |
Trim needs painted/caulked in I |
|
|
-- |
-- |
Trim needs painted /caulked in the master bathroom |
|
|
-- |
-- |
Add stone to side area were concrete exposed in front of townhouse |
Rock guys |
|
-- |
-- |
Main level door to closet under stairs, rubs when you close it |
George |
|
-- |
-- |
Scratch left sided master vanity. Will this come off or does it need to be filled? |
Jill |
|
-- |
-- |
Left side of tile shower wall, bottom corner to be secured to wall |
Caulk, Painter |
|
-- |
-- |
Left side of tile shower wall, bottom corner to be secured to wall |
|
|
-- |
-- |
Left side of tile shower wall, bottom corner to be secured to wall |
|
|
-- |
-- |
Garage door trim is messed up, and it’s missing the handles |
Jeff, Davenport |
|
-- |
-- |
Remove items from garage |
Jill |
|
-- |
-- |
Install screen |
Bonus room needs one - Jill |
|
-- |
-- |
Pressure wash front and back |
|
|
-- |
-- |
Clean Master shower |
Jill |
|
-- |
-- |
caulking attic access panel |
Painter |
|
-- |
-- |
small dent fridge door |
Freezer door - waiting on access |
|
-- |
-- |
switch two light switches bottom of stairs to bedroom level |
Electrician |
|
-- |
-- |
Scratch left sided master vanity. Will this come off or does it need to be filled? |
|
|
-- |
-- |
Left side of tile shower wall, bottom corner to be secured to wall |
Wes |
|
-- |
-- |
Notified Kirill that we will no longer replace refrigerator |
October 14, 2024 |
|
-- |
-- |
Ratified Contract? (0) 11.10.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.13.2023 |
$5,000 |
|
-- |
-- |
Association Packet Requested (0) 11.10.2023 |
|
|
-- |
-- |
Association Packet Received (0) 11.15.2023 |
|
|
-- |
-- |
Selections Meeting (0) 11.10.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0) 11.10.2023 |
|
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 11.10.2023 |
|
|
-- |
-- |
Deposit For Upgrades Received (0) 11.10.2023 |
|
|
-- |
-- |
Building Permit (30) 11.06.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 01.04.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 01.25.2024 |
|
|
-- |
-- |
Stake Out Home (1) 11.09.2023 |
|
|
-- |
-- |
Excavate (2) 11.09.2023 |
|
|
-- |
-- |
Inspection (Footers) (1) 11.09.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 12.18.2023 |
|
|
-- |
-- |
Pour Footers (1) 11.09.2023 |
|
|
-- |
-- |
Set Forms (2) 12.18.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1) 12.18.2023 |
|
|
-- |
-- |
Plumb Slab (2) 12.18.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.18.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 12.18.2023 |
|
|
-- |
-- |
Prepare Slab (1) 12.18.2023 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.18.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 12.18.2023 |
|
|
-- |
-- |
Pour Slab (1) * 12.18.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 03.27.2024 |
|
|
-- |
-- |
Framing I (9) 01.04.2024 |
|
|
-- |
-- |
Order Steps (0) 02.07.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0) 02.07.2024 |
|
|
-- |
-- |
Framing II (8) 01.07.2024 |
|
|
-- |
-- |
Framing III (8) * 01.29.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 02.07.2024 |
|
|
-- |
-- |
Install Stairs (0) 01.29.2024 |
|
|
-- |
-- |
Windows & Doors (0) 02.07.2024 |
|
|
-- |
-- |
House Number and Status in Window (0) 02.19.2024 |
|
|
-- |
-- |
Roofing (0) 02.07.2024 |
|
|
-- |
-- |
Order Cabinets (0) 03.25.2024 |
|
|
-- |
-- |
Order Appliances (0) 04.25.2024 |
FRENCH |
|
-- |
-- |
Deck (0) 02.03.2024 |
|
|
-- |
-- |
Gutters (0) 04.04.2024 |
|
|
-- |
-- |
Driveway (0) 04.19.2024 |
|
|
-- |
-- |
Patio (0) 03.13.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 04.18.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 05.11.2024 |
|
|
-- |
-- |
HVAC Rough In (4) 02.07.2024 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 02.21.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 02.10.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 02.17.2024 |
In process 2/14. Almost completed. |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 02.21.2024 |
|
|
-- |
-- |
Electric Rough In (4) 02.21.2024 |
In process 2/17 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 02.21.2024 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 04.22.2024 |
|
|
-- |
-- |
Inspection (Framing) (1) 02.21.2024 |
|
|
-- |
-- |
Exterior Vinyl (0) * 04.03.2024 |
|
|
-- |
-- |
Exterior Stone (0) 04.10.2024 |
|
|
-- |
-- |
Insulation (2) 02.21.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1) 02.28.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 03.28.2024 |
|
|
-- |
-- |
Set Electric Meter (0) 05.01.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 04.04.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 04.04.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 04.10.2024 |
|
|
-- |
-- |
Drywall (Hang) (4) * 02.28.2024 |
Stocked 2/24 |
|
-- |
-- |
Loan Approval (0) 04.22.2024 |
Annie King @ PVFCU (70% LTV) |
|
-- |
-- |
Deed Preparation (0) 04.22.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 03.13.2024 |
In process 3/9 |
|
-- |
-- |
Paint 1 (1) 03.13.2024 |
|
|
-- |
-- |
Garage Door (0) 03.30.2024 |
|
|
-- |
-- |
House Numbers (0) 04.27.2024 |
|
|
-- |
-- |
Mailbox (0) 04.27.2024 |
|
|
-- |
-- |
Cabinet Installation (2) * 04.19.2024 |
Delivery April 16, Install April 18 |
|
-- |
-- |
Granite Installation (1) * 04.27.2024 |
|
|
-- |
-- |
Interior Trim - Install (3) 03.30.2024 |
In process 3/20 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 04.25.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 04.03.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 04.17.2024 |
In process 4/17 |
|
-- |
-- |
Luxury Vinyl Tile (0) 04.17.2024 |
|
|
-- |
-- |
Paint 2 (3) 04.03.2024 |
|
|
-- |
-- |
Cover Floors (1) 04.27.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 04.25.2024 |
|
|
-- |
-- |
Shoe Moulding (0) 04.27.2024 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 05.11.2024 |
Needs shelving/mirrors 5/8 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 05.09.2024 |
Needs shelving/mirrors 5/4 |
|
-- |
-- |
Pay Water / Sewer Taps (0) 04.22.2024 |
|
|
-- |
-- |
Set Water Meter (0) 04.23.2024 |
|
|
-- |
-- |
Electric Trim Out (3) 05.04.2024 |
In process 4/27 |
|
-- |
-- |
Ceiling Fans (0) 05.04.2024 |
|
|
-- |
-- |
HVAC Trim Out (1) 04.27.2024 |
|
|
-- |
-- |
Blower Door Test (1) 05.09.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2) 05.08.2024 |
In process 5/4. Needs master bathroom toilet. |
|
-- |
-- |
Install Appliances (0) * 05.08.2024 |
FRENCH- DELIVERY 3/18 |
|
-- |
-- |
Paint 3 (2) * 04.27.2024 |
|
|
-- |
-- |
Carpet (2) 04.19.2024 |
In process 4/17 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 05.23.2024 |
Tell Bill Dudley after CO exists |
|
-- |
-- |
Inspection (Final HVAC) (1) 05.13.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 05.13.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 05.13.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 05.13.2024 |
|
|
-- |
-- |
Pre Walk Through (0) 05.16.2024 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 05.04.2024 |
In process 5/1 |
|
-- |
-- |
Cleaning (1) 05.18.2024 |
In process 5/15 |
|
-- |
-- |
Certificate of Occupancy (1) * 05.15.2024 |
|
|
-- |
-- |
C.O. to Lender (0) 05.15.2024 |
|
|
-- |
-- |
Schedule Closing (0) 05.23.2024 |
|
|
-- |
-- |
Buyer Walk Through (1) 05.18.2024 |
|
|
-- |
-- |
Payment for Upgrades (0) 05.13.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 05.13.2024 |
|
|
-- |
-- |
Review Settlement Statement (0) 05.14.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 05.14.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 05.13.2024 |
|
|
-- |
-- |
Closing (1) 05.29.2024 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 06.01.2024 |
|
|