| -- | -- | Micro vented here too | ||
| -- | -- | Is this bonus room supposed to be finished? It mentions flooring, but I see the bathroom and bonus room deleted. | ||
| -- | -- | Shower walls need installed in master bath | Drywall up 3/13 | |
| -- | -- | To farmhouse, sinks in garage | ||
| -- | -- | Pretty big scratches on master vanity | Jill | |
| -- | -- | Finish covering carpets | ||
| -- | -- | Can we use another color that’s not white on the kitchen island receptacles | ||
| -- | -- | Install floor trim in master bathroom | George | |
| -- | -- | A few small drywall patches needed on stairwell | ||
| -- | -- | Master bathroom toilet needs installed. Perhaps it’s not installed because this bathroom is missing trim? | ||
| -- | -- | Lock is missing paint. Replace? | ||
| -- | -- | CODED LOCKBOX 4646 | ||
| -- | -- | Mirrors need installed in all bathrooms | Being installed on Friday the 10th | |
| -- | -- | Final paint needs done | Being done on Friday the 10th | |
| -- | -- | Shelving needed throughout the townhome | Being installed on Friday the 10th | |
| -- | -- | Put handrails back up | ||
| -- | -- | Screens need installed throughout | Jill | |
| -- | -- | Caulk in the sink in all bathrooms | ||
| -- | -- | Light bulb needed in the garage door opener | ||
| -- | -- | Trim needs painted/caulked in I | ||
| -- | -- | Trim needs painted /caulked in the master bathroom | ||
| -- | -- | Add stone to side area were concrete exposed in front of townhouse | Rock guys | |
| -- | -- | Main level door to closet under stairs, rubs when you close it | George | |
| -- | -- | Scratch left sided master vanity. Will this come off or does it need to be filled? | Jill | |
| -- | -- | Left side of tile shower wall, bottom corner to be secured to wall | Caulk, Painter | |
| -- | -- | Left side of tile shower wall, bottom corner to be secured to wall | ||
| -- | -- | Left side of tile shower wall, bottom corner to be secured to wall | ||
| -- | -- | Garage door trim is messed up, and it’s missing the handles | Jeff, Davenport | |
| -- | -- | Remove items from garage | Jill | |
| -- | -- | Install screen | Bonus room needs one - Jill | |
| -- | -- | Pressure wash front and back | ||
| -- | -- | Clean Master shower | Jill | |
| -- | -- | caulking attic access panel | Painter | |
| -- | -- | small dent fridge door | Freezer door - waiting on access | |
| -- | -- | switch two light switches bottom of stairs to bedroom level | Electrician | |
| -- | -- | Scratch left sided master vanity. Will this come off or does it need to be filled? | ||
| -- | -- | Left side of tile shower wall, bottom corner to be secured to wall | Wes | |
| -- | -- | Notified Kirill that we will no longer replace refrigerator | October 14, 2024 | |
| -- | -- | Ratified Contract? (0) 11.10.2023 | ||
| Expanded Driveway | ||||
| Microwave vented to Exterior | ||||
| Farmhouse Sink | ||||
| French Model Refrigerator | ||||
| Subway Tile Shower Walls | ||||
| Shower Door with Brushed Nickel Trim | ||||
| Builder Credit Towards Upgrade Costs | ||||
| Upgrade cost included in contract price | ||||
| Check to Kirill for overpayment of LVP upgrade | ||||
| -- | -- | $2500 Deposit Received (0) 11.13.2023 | $5,000 | |
| -- | -- | Association Packet Requested (0) 11.10.2023 | ||
| -- | -- | Association Packet Received (0) 11.15.2023 | ||
| -- | -- | Selections Meeting (0) 11.10.2023 | ||
| -- | -- | Selections Sheet Signed (0) 11.10.2023 | ||
| -- | -- | Amendment for Upgrades (B,S,L,T,BCP) (0) 11.10.2023 | ||
| -- | -- | Deposit For Upgrades Received (0) 11.10.2023 | ||
| -- | -- | Building Permit (30) * 11.06.2023 | ||
| -- | -- | Order Roof & Floor Trusses (1) 01.04.2024 | ||
| -- | -- | Order Windows & Doors (0) 01.25.2024 | ||
| -- | -- | Stake Out Home (1) 11.09.2023 | ||
| -- | -- | Excavate (2) 11.09.2023 | ||
| -- | -- | Inspection (Footers) (1) 11.09.2023 | ||
| -- | -- | Inspection (Concrete Wall) (1) 12.18.2023 | ||
| -- | -- | Pour Footers (1) * 11.09.2023 | ||
| -- | -- | Set Forms (2) 12.18.2023 | ||
| -- | -- | Pour Foundation Walls (1) 12.18.2023 | ||
| -- | -- | Plumb Slab (2) 12.18.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 12.18.2023 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 12.18.2023 | ||
| -- | -- | Prepare Slab (1) 12.18.2023 | ||
| -- | -- | Inspection (Slab) (1) 12.18.2023 | ||
| -- | -- | Inspection (Drain Tile) (0) 12.18.2023 | ||
| -- | -- | Pour Slab (1) * 12.18.2023 | ||
| -- | -- | Settlement Agent Confirmed (0) 03.27.2024 | ||
| -- | -- | Framing I (9) 01.04.2024 | ||
| -- | -- | Order Steps (0) 02.07.2024 | ||
| -- | -- | Order Tubs / Showers (0) 02.07.2024 | ||
| -- | -- | Framing II (8) 01.07.2024 | ||
| -- | -- | Framing III (8) * 01.29.2024 | ||
| -- | -- | Verify Window & Roof Structure (0) 02.07.2024 | ||
| -- | -- | Install Stairs (0) * 01.29.2024 | ||
| -- | -- | Windows & Doors (0) * 02.07.2024 | ||
| -- | -- | House Number and Status in Window (0) 02.19.2024 | ||
| -- | -- | Roofing (0) * 02.07.2024 | ||
| -- | -- | Order Cabinets (0) 03.25.2024 | ||
| -- | -- | Order Appliances (0) 04.25.2024 | FRENCH | |
| -- | -- | Deck (0) 02.03.2024 | ||
| -- | -- | Gutters (0) 04.04.2024 | ||
| -- | -- | Driveway (0) * 04.19.2024 | ||
| -- | -- | Patio (0) 03.13.2024 | ||
| -- | -- | Privacy Divider / Fence (0) * 04.18.2024 | ||
| -- | -- | Sod / Seed / Landscaping (0) 05.11.2024 | ||
| -- | -- | HVAC Rough In (4) 02.07.2024 | ||
| -- | -- | Rough In Microwave Vent (0) 02.10.2024 | ||
| -- | -- | Plumbing Rough In (4) 02.17.2024 | In process 2/14. Almost completed. | |
| -- | -- | Electric Rough In (4) 02.21.2024 | In process 2/17 | |
| -- | -- | Inspection (Rough In HVAC) (1) 02.21.2024 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 02.21.2024 | ||
| -- | -- | Inspection (Rough In Electric) (1) 02.21.2024 | ||
| -- | -- | Inspection (Framing) (1) * 02.21.2024 | ||
| -- | -- | Inspection (Deck Piers) (0) 04.22.2024 | ||
| -- | -- | Exterior Vinyl (0) * 04.03.2024 | ||
| -- | -- | Exterior Stone (0) 04.10.2024 | ||
| -- | -- | Insulation (2) * 02.21.2024 | ||
| -- | -- | Inspection (Insulation) (1) 02.28.2024 | ||
| -- | -- | Inspection (Electric Service) (0) 03.28.2024 | ||
| -- | -- | Set Electric Meter (0) * 05.01.2024 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 04.04.2024 | ||
| -- | -- | Inspection (Main Water Line) (0) 04.04.2024 | ||
| -- | -- | Order Interior Doors & Trim (0) 04.10.2024 | ||
| -- | -- | Drywall (Hang) (4) * 02.28.2024 | Stocked 2/24 | |
| -- | -- | Loan Approval (0) 04.22.2024 | Annie King @ PVFCU (70% LTV) | |
| -- | -- | Deed Preparation (0) 04.22.2024 | ||
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * 03.13.2024 | In process 3/9 | |
| -- | -- | Paint 1 (1) 03.13.2024 | ||
| -- | -- | Garage Door (0) 03.30.2024 | ||
| -- | -- | House Numbers (0) 04.27.2024 | ||
| -- | -- | Mailbox (0) 04.27.2024 | ||
| -- | -- | Cabinet Installation (2) * 04.19.2024 | Delivery April 16, Install April 18 | |
| -- | -- | Granite Installation (1) * 04.27.2024 | ||
| -- | -- | Interior Trim - Install (3) * 03.30.2024 | In process 3/20 | |
| -- | -- | Order Plumbing / Lighting Fixtures (0) 04.25.2024 | ||
| -- | -- | Interior Trim - Paint (1) 04.03.2024 | ||
| -- | -- | Luxury Vinyl Plank (3) * 04.17.2024 | In process 4/17 | |
| -- | -- | Luxury Vinyl Tile (0) 04.17.2024 | ||
| -- | -- | Paint 2 (3) 04.03.2024 | ||
| -- | -- | Cover Floors (1) 04.27.2024 | ||
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) 04.25.2024 | ||
| -- | -- | Shoe Moulding (0) 04.27.2024 | ||
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * 05.11.2024 | Needs shelving/mirrors 5/8 | |
| -- | -- | Install Coded Lockbox (add extra keys) (0) 05.09.2024 | Needs shelving/mirrors 5/4 | |
| -- | -- | Pay Water / Sewer Taps (0) 04.22.2024 | ||
| -- | -- | Set Water Meter (0) * 04.23.2024 | ||
| -- | -- | Electric Trim Out (3) * 05.04.2024 | In process 4/27 | |
| -- | -- | Ceiling Fans (0) 05.04.2024 | ||
| -- | -- | HVAC Trim Out (1) * 04.27.2024 | ||
| -- | -- | Blower Door Test (1) 05.09.2024 | ||
| -- | -- | Plumbing Trim Out (2) * 05.08.2024 | In process 5/4. Needs master bathroom toilet. | |
| -- | -- | Install Appliances (0) * 05.08.2024 | FRENCH- DELIVERY 3/18 | |
| -- | -- | Paint 3 (2) * 04.27.2024 | ||
| -- | -- | Carpet (2) 04.19.2024 | In process 4/17 | |
| -- | -- | Appraiser Confirms Construction Completion (0) 05.23.2024 | Tell Bill Dudley after CO exists | |
| -- | -- | Inspection (Final HVAC) (1) 05.13.2024 | ||
| -- | -- | Inspection (Final Plumbing) (1) 05.13.2024 | ||
| -- | -- | Inspection (Final Electric) (1) 05.13.2024 | ||
| -- | -- | Inspection (Final Building) (2) * 05.13.2024 | ||
| -- | -- | Pre Walk Through (0) 05.16.2024 | ||
| -- | -- | Stain Hardwood Stairs (1) * 05.04.2024 | In process 5/1 | |
| -- | -- | Cleaning (1) 05.18.2024 | In process 5/15 | |
| -- | -- | Certificate of Occupancy (1) * 05.15.2024 | ||
| -- | -- | C.O. to Lender (0) 05.15.2024 | ||
| -- | -- | Schedule Closing (0) 05.23.2024 | ||
| -- | -- | Buyer Walk Through (1) * 05.18.2024 | ||
| -- | -- | Payment for Upgrades (0) 05.13.2024 | ||
| -- | -- | Keys to Settlement Agent (0) 05.13.2024 | ||
| -- | -- | Review Settlement Statement (0) 05.14.2024 | ||
| -- | -- | Jerry Signs Closing Documents (0) 05.14.2024 | ||
| -- | -- | Request Trash Tote From POA Manager (0) 05.13.2024 | ||
| -- | -- | Closing (1) 05.29.2024 | Brittany @ West View Title | |
| -- | -- | Remove Coded Lockbox (0) 06.01.2024 | ||