| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished bonus room | ||||
| Finished bonus bath | ||||
| Expanded 12 x 18 deck | ||||
| 10 x 10 Patio under deck | ||||
| White kitchen cabinetry | ||||
| Level III Quartz Countertops | ||||
| Coffee Bar with glass shelving and crown moulding | ||||
| Level III Quartz on Coffee Bar | ||||
| Banquette seating in white with under cabinets | ||||
| Farmhouse sink- white | ||||
| Upper Cabinet Crown Moulding ( like model) | ||||
| three Drawer stack in B36" and in B18" (island) like model | ||||
| Double Waste Basket in Island | ||||
| Roll Out Trays in B36" and in 18" Pantry | ||||
| Spice Rack in B9 | ||||
| French Model Refrigerator | ||||
| Microwave Vented to Exterior | ||||
| Level III Quartz in Master and Hall Bath | ||||
| Farmhouse Style Vanity Faucets (like model) | ||||
| Gray Subway Tile Shower Walls with white Floor Pan | ||||
| Heavy Glass Bi-Pass Shower Door with Black Trim | ||||
| Luxury Vinyl Plank in Bonus Room | ||||
| Luxury Vinyl Plank on Stair Landings and Upstairs Hallway | ||||
| Pine Steps Painted to Bedroom Level | ||||
| Upgraded Carpet in all Bedrooms | ||||
| Upgraded Carpet Pad in all Bedrooms | ||||
| Expanded Driveway | ||||
| Shiplap on Living Room Wall | ||||
| Digital Deadbolt | ||||
| Garage Door Keypad | ||||
| Master Closet/Nook White wooden shelving like model | ||||
| Nursery Paint for Stewart Baby!!! House Warming from Builder | ||||
| White cabinetry in Hall and Bonus Bath | ||||
| Amendment to increase price by $50,975 | ||||
| Ceiling Fans- added in LR, and two small bedrooms (PAYING OUTSIDE CONTRACT AT CLOSING) | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 12.26.2023 | ||
| -- | -- | Inspection (Concrete Wall) (1) 12.26.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 01.04.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 01.04.2024 | ||
| -- | -- | Inspection (Slab) (1) 01.04.2024 | ||
| -- | -- | Inspection (Drain Tile) (0) 01.04.2024 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 03.21.2024 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 03.21.2024 | ||
| -- | -- | Inspection (Rough In Electric) (1) 03.21.2024 | ||
| -- | -- | Inspection (Framing) (1) * 03.30.2024 | ||
| -- | -- | Inspection (Deck Piers) (0) 05.20.2024 | ||
| -- | -- | Inspection (Insulation) (1) 03.30.2024 | ||
| -- | -- | Inspection (Electric Service) (0) 04.11.2024 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 03.21.2024 | ||
| -- | -- | Inspection (Main Water Line) (0) 03.21.2024 | ||
| -- | -- | Inspection (Final HVAC) (0) 06.08.2024 | 6/7 | |
| -- | -- | Inspection (Final Plumbing) (0) 06.08.2024 | ||
| -- | -- | Inspection (Final Electric) (0) 06.08.2024 | ||
| -- | -- | Inspection (Final Building) (4) * 06.08.2024 | Fri, June 7 | |