1 33 37 89 47 73 67 55 56 59 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 67  ::  1387 Appaloosa Court
[ BUILD: 20240009 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Saturday (Nov 23)    show all photos
--   --   Move tree away from driveway
--   --   Broken bonus room window is here On site needs to be installed
--   --   Add a few more rocks to the front after driveway is poured
--   --   Few upstairs doors missing arrived 7/18
--   --   Add additional sod to the front yard
--   --   Refrigerator is in garage other appliances still needed
--   --   This driveway needs expanded 8/10
--   --   Patch a few large concrete holes in basement? Tom
--   --   Cover carpet quickly Jill
--   --   Trim doors that rub carpet
--   --   Trim the boards that will go under the kitchen cabinets Denny
--   --   Dining chandelier and powder bath light fixture needed They arrived, Electrician
--   --   Few light switch plate covers needed Electrician
--   --   Buyer wants to close ASAP What is our best estimate?
--   --   Stain steps Happening today- Monday 9/9
--   --   Deadbolt is missing on back patio door And deck door
--   --   Living room light fixture needed Electrician
--   --   Globe is missing from kitchen pendant light. Was it damaged? It was damaged. Can we order another one? On order9/9 KK
--   --   Trim around areas were cabinets are now installed George
--   --   Install mirrors Joe
--   --   CODED LOCKBOX 6767
--   --   Few lightbulbs needed 9/11 Jill
--   --   Deadbolt missing in all doors Joe
--   --   Adjust closet doors Jill
--   --   Replace cabinet top Fred - on order
--   --   Door stopper outside of powder bath Paul
--   --   Shelf needed in fridge arrived missing Courtney or Jill
--   --   Trim doors that hit carpet. Quite a few. George
--   --   Trim boards to make even on deck Tom
--   --   Push dirt up to side of driveway Pettit
--   --   Pressure wash front of townhouse Jill
--   --   Repaint garage Painter
--   --   Paint touch up Painter
--   --   Black dining light needs installed silver is currently installed Electrician
--   --   Extend vinyl under bump out Gap - Davenport
--   --   Make pocket door easier to close George
--   --   Patch holes powder bath Painter
--   --   Patch gap at stair transition strip Denny
--   --   Nail back of trim on kitchen island George
--   --   Remove paint on vinyl plank Painter
--   --   Caulk shower head Painter
--   --   Adjust bathroom door hall bath. Hard to close. George
--   --   Replace scratched hvac cover Jill
--   --   Few tray ceiling spots need sanded touched up Painter. I think this has been completed.
--   --  
--   --   Some patching needs to be done where the trim was nailed to the back of the kitchen island
--   --   Remove ladder from master bedroom
--   --   Kate - need buyer contact info
--   --   Dionna (540)421-7865. Dianna.k@hotmail.com
--   --   Ruvim (231)409-7493. ruvimpostaychuk@icloud.com
--   --   Seed and straw by driveway Pettit
-- -- Ratified Contract? (0)  04.18.2024    
-- -- $2500 Deposit Received (0)  07.25.2024    
-- -- Association Packet Requested (0)  04.18.2024    
-- -- Association Packet Received (0)  04.19.2024    
-- -- Selections Meeting (0)  08.05.2024     Friday, August 2 at 2:30 PM
-- -- Selections Sheet Signed (0)  08.06.2024    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  08.07.2024     8/5: sent to Morgan
-- -- Deposit For Upgrades Received (0)  08.07.2024    
-- -- Building Permit (30)  01.04.2024    
-- -- Order Roof & Floor Trusses (1)  03.14.2024    
-- -- Order Windows & Doors (0)  04.25.2024    
-- -- Stake Out Home (1)  01.04.2024    
-- -- Excavate (2)  01.04.2024    
-- -- Inspection (Footers) (1)  02.08.2024    
-- -- Inspection (Concrete Wall) (1)  02.08.2024    
-- -- Pour Footers (1)  02.08.2024    
-- -- Set Forms (2)  02.08.2024    
-- -- Pour Foundation Walls (1)  02.19.2024    
-- -- Plumb Slab (2)  03.14.2024    
-- -- Inspection (Plumbing Under Slab) (1)  03.14.2024    
-- -- Inspection (Conduit Under Slab) (1)  03.14.2024    
-- -- Prepare Slab (1)  03.14.2024    
-- -- Inspection (Slab) (1)  03.14.2024    
-- -- Inspection (Drain Tile) (0)  04.25.2024    
-- -- Pour Slab (1) *   03.14.2024    
-- -- Settlement Agent Confirmed (0)  03.14.2024    
-- -- Framing I (9)  04.18.2024    
-- -- Order Steps (0)  04.25.2024    
-- -- Order Tubs / Showers (0)  04.25.2024    
-- -- Framing II (8)  04.18.2024    
-- -- Framing III (8) *   04.18.2024    
-- -- Verify Window & Roof Structure (0)  04.25.2024    
-- -- Install Stairs (0)  04.18.2024    
-- -- Windows & Doors (0)  04.25.2024    
-- -- House Number and Status in Window (0)  04.27.2024    
-- -- Roofing (0)  04.25.2024     in process 4/19
-- -- Order Cabinets (0)  08.12.2024    
-- -- Order Appliances (0)  08.12.2024    
-- -- Deck (0)  06.22.2024    
-- -- Gutters (0)  06.22.2024    
-- -- Driveway (0)  07.17.2024    
-- -- Patio (0)  06.22.2024    
-- -- Privacy Divider / Fence (0)  07.24.2024     in process 7/20
-- -- Sod / Seed / Landscaping (0)  08.03.2024    
-- -- HVAC Rough In (4)  04.27.2024     In process 4/24
-- -- Inspection (Rough In HVAC) (1)  05.29.2024    
-- -- Rough In Microwave Vent (0)  04.27.2024    
-- -- Plumbing Rough In (4)  05.22.2024     In process 5/18
-- -- Inspection (Rough In Plumbing) (1)  05.29.2024    
-- -- Electric Rough In (4)  05.22.2024    
-- -- Inspection (Rough In Electric) (1)  05.29.2024    
-- -- Inspection (Deck Piers) (0)  08.03.2024    
-- -- Inspection (Framing) (1)  05.29.2024    
-- -- Exterior Vinyl (0) *   06.22.2024    
-- -- Exterior Stone (0)  07.13.2024    
-- -- Insulation (2)  05.29.2024    
-- -- Inspection (Insulation) (1)  06.03.2024    
-- -- Inspection (Electric Service) (0)  08.05.2024    
-- -- Set Electric Meter (0)  08.06.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  06.10.2024    
-- -- Drywall (Hang) (4) *   06.12.2024     In process 6/5
-- -- Loan Approval (0)  08.29.2024    
-- -- Deed Preparation (0)  08.12.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   06.19.2024     In process 6/12
-- -- Paint 1 (1)  06.22.2024    
-- -- Garage Door (0)  06.22.2024    
-- -- House Numbers (0)  07.24.2024    
-- -- Mailbox (0)  08.12.2024    
-- -- Cabinet Installation (2) *   09.07.2024     Arriving Sep 4, Deliver Sep 5, Install Sep 6
-- -- Granite Installation (1) *   09.11.2024     Tue, Sep 10
-- -- Interior Trim - Install (3)  07.20.2024     In process 7/17. Few upstairs doors missing to complete this task.
-- -- Order Plumbing / Lighting Fixtures (0)  07.29.2024    
-- -- Interior Trim - Paint (1)  07.20.2024    
-- -- Luxury Vinyl Plank (3) *   08.14.2024     In process 8/7
-- -- Luxury Vinyl Tile (0)  08.10.2024    
-- -- Paint 2 (3)  08.10.2024     In process 8/7
-- -- Cover Floors (1)  08.28.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  07.11.2024    
-- -- Shoe Moulding (0)  08.28.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  08.29.2024     In process of shelving 8/18
-- -- Install Coded Lockbox (add extra keys) (0)  09.07.2024    
-- -- Pay Water / Sewer Taps (0)  08.05.2024    
-- -- Set Water Meter (0)  08.05.2024    
-- -- Electric Trim Out (3)  08.28.2024     In process 8/24
-- -- Ceiling Fans (0)  08.28.2024    
-- -- HVAC Trim Out (1)  09.07.2024    
-- -- Blower Door Test (1)  09.16.2024    
-- -- Plumbing Trim Out (2)  09.12.2024     Almost complete 9/11
-- -- Install Appliances (0) *   09.12.2024     On site and ready to install when cabinets arrive
-- -- Paint 3 (2) *   08.18.2024    
-- -- Carpet (2)  08.18.2024     In process 8/14
-- -- Appraiser Confirms Construction Completion (0)  09.18.2024     Monday, September 16
-- -- Inspection (Final HVAC) (1)  09.16.2024    
-- -- Inspection (Final Plumbing) (1)  09.16.2024    
-- -- Inspection (Final Electric) (1)  09.16.2024    
-- -- Inspection (Final Building) (2) *   09.18.2024     Tuesday sept 17
-- -- Pre Walk Through (0)  09.12.2024    
-- -- Stain Hardwood Stairs (1)  09.12.2024    
-- -- Cleaning (1)  09.16.2024    
-- -- Certificate of Occupancy (1) *   09.20.2024    
-- -- C.O. to Lender (0)  09.20.2024    
-- -- Schedule Closing (0)  09.18.2024    
-- -- Buyer Walk Through (1)  09.16.2024     Sunday, September 15, 1:30 PM
-- -- Payment for Upgrades (0)  09.12.2024    
-- -- Keys to Settlement Agent (0)  09.12.2024    
-- -- Review Settlement Statement (0)  09.17.2024    
-- -- Jerry Signs Closing Documents (0)  09.18.2024    
-- -- Request Trash Tote From POA Manager (0)  08.08.2024    
-- -- Closing (1)  09.23.2024     Brittany @ West View Title - Fri, Sep 20
-- -- Remove Coded Lockbox (0)  09.28.2024