Does concrete missing near front metal trim of garage need to be patched? |
Tom |
|
-- |
-- |
Kozhin, 540-282-2788, kahmad@harmanrealty.com |
Contact for tenants |
|
-- |
-- |
Repair aluminum wrap at base of both sides of garage door |
Davenport |
|
-- |
-- |
Lowes is replacing refrigerator |
|
|
|
-- |
-- |
Can only be 10x10 deck |
|
|
-- |
-- |
Vinyl pieces missing |
|
|
-- |
-- |
Does concrete near the front garage? Metal piece need to be patched |
|
|
-- |
-- |
Extended driveway framed 8/28 |
|
|
-- |
-- |
(need to charge a buyer for driveway upgrade) |
|
|
-- |
-- |
Air vent above how closet is badly bent |
Hall - return vent, Jason |
|
-- |
-- |
Few drywall holes need patched in kitchen |
Painter |
|
-- |
-- |
Panel will need to be cut and repaired in places. Electrical outlets were not installed on the exterior. |
Vinyl, Davenport - ASAP |
|
-- |
-- |
Install luxury panel in master bathroom |
vinyl |
|
-- |
-- |
Needs powder mat mirror and fennel shelving installed after carpet is in |
|
|
-- |
-- |
Garage is completely full of appliances |
|
|
-- |
-- |
Repaint front door |
Painter |
|
-- |
-- |
All transition strips need installed |
Denny |
|
-- |
-- |
Add trim work cabinets are now installed |
|
|
-- |
-- |
I need the keys to install a lock box at this home |
Pantry |
|
-- |
-- |
Lock to the garage door does not function properly |
Paul. Not fixed 10/23 |
|
-- |
-- |
Needs powder bath mirror and final shelving installed after carpet is in |
Paul |
|
-- |
-- |
Pantry is missing a support on the shelf |
Paul |
|
-- |
-- |
CODED LOCKBOX 5555 |
|
|
-- |
-- |
Can we get white electrical covers for the brown kitchen island? |
Jill |
|
-- |
-- |
Powder bath light needed |
Electricians |
|
-- |
-- |
Few large scratches on stained staircase |
|
|
-- |
-- |
Powder bath light needed |
|
|
-- |
-- |
Two towel rings needed in master bath |
Tom has them |
|
-- |
-- |
Microwave vent doesn’t work |
CJ |
|
-- |
-- |
Can we get brown electrical covers for the brown kitchen island? |
Jill |
|
-- |
-- |
Handrail needs installed and vinyl needs repaired before final inspection |
|
|
-- |
-- |
Repair wrap at right side of garage door |
Davenport |
|
-- |
-- |
Install handrails |
George - ASAP |
|
-- |
-- |
Paint front door |
Painter |
|
-- |
-- |
Finish touchup painting |
Painter |
|
-- |
-- |
Gap on wall electrical switch plate |
Painter |
|
-- |
-- |
Install shower bar |
Paul |
|
-- |
-- |
Remove extra pieces of bathroom flooring |
Jill |
|
-- |
-- |
Screens needed |
Jill |
|
-- |
-- |
Clean out bonus room |
|
|
-- |
-- |
Install window screens |
|
|
-- |
-- |
Caulk in wood gaps at the top of the stair transition |
|
|
-- |
-- |
Install shower rod, master bathroom, and towel hooks |
|
|
-- |
-- |
Remove ladder from garage |
|
|
-- |
-- |
Master bathroom needs towel rings |
|
|
-- |
-- |
toilet paper holders need installed |
Joe |
|
-- |
-- |
Ratified Contract? (0) 09.08.2024 |
|
|
-- |
-- |
$2500 Deposit Received (0) 09.12.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 09.08.2024 |
|
|
-- |
-- |
Association Packet Received (0) 09.14.2024 |
|
|
-- |
-- |
Selections Meeting (0) 09.11.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 09.12.2024 |
9/11: sent to Kozhin |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 09.13.2024 |
9/12: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 09.11.2024 |
|
|
-- |
-- |
Building Permit (30) 02.19.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 05.23.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 06.19.2024 |
|
|
-- |
-- |
Stake Out Home (1) 02.19.2024 |
|
|
-- |
-- |
Excavate (2) 02.19.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 02.19.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 02.19.2024 |
|
|
-- |
-- |
Pour Footers (1) 02.19.2024 |
|
|
-- |
-- |
Set Forms (2) 04.18.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 04.18.2024 |
|
|
-- |
-- |
Plumb Slab (2) 04.18.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 04.18.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 04.18.2024 |
|
|
-- |
-- |
Prepare Slab (1) 04.18.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 04.18.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 04.18.2024 |
|
|
-- |
-- |
Pour Slab (1) * 04.18.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 09.13.2024 |
|
|
-- |
-- |
Framing I (9) 04.22.2024 |
|
|
-- |
-- |
Order Steps (0) 05.23.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0) 06.19.2024 |
|
|
-- |
-- |
Framing II (8) 05.13.2024 |
|
|
-- |
-- |
Framing III (8) * 05.23.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 05.23.2024 |
|
|
-- |
-- |
Install Stairs (0) 05.23.2024 |
|
|
-- |
-- |
Windows & Doors (0) 07.15.2024 |
|
|
-- |
-- |
House Number and Status in Window (0) 07.20.2024 |
|
|
-- |
-- |
Roofing (0) 06.16.2024 |
|
|
-- |
-- |
Order Cabinets (0) 09.11.2024 |
|
|
-- |
-- |
Order Appliances (0) 08.12.2024 |
|
|
-- |
-- |
Deck (0) 07.17.2024 |
|
|
-- |
-- |
Gutters (0) 09.15.2024 |
|
|
-- |
-- |
Driveway (0) 09.15.2024 |
|
|
-- |
-- |
Patio (0) 08.03.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 08.14.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 10.05.2024 |
|
|
-- |
-- |
HVAC Rough In (4) 06.03.2024 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 07.10.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 06.05.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 06.19.2024 |
|
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 07.10.2024 |
|
|
-- |
-- |
Electric Rough In (4) 06.30.2024 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 07.10.2024 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 09.05.2024 |
|
|
-- |
-- |
Inspection (Framing) (1) 07.10.2024 |
|
|
-- |
-- |
Exterior Vinyl (0) * 08.07.2024 |
|
|
-- |
-- |
Exterior Stone (0) 08.07.2024 |
|
|
-- |
-- |
Insulation (2) 07.10.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1) 07.17.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 09.05.2024 |
|
|
-- |
-- |
Set Electric Meter (0) 09.17.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 04.04.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 04.04.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 08.03.2024 |
|
|
-- |
-- |
Drywall (Hang) (4) * 07.17.2024 |
|
|
-- |
-- |
Loan Approval (0) 10.12.2024 |
|
|
-- |
-- |
Deed Preparation (0) 10.12.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 08.03.2024 |
In process 7/24 |
|
-- |
-- |
Paint 1 (1) 08.03.2024 |
|
|
-- |
-- |
Garage Door (0) 08.18.2024 |
|
|
-- |
-- |
House Numbers (0) 09.18.2024 |
|
|
-- |
-- |
Mailbox (0) 09.15.2024 |
|
|
-- |
-- |
Cabinet Installation (2) * 10.09.2024 |
Install Oct 8 |
|
-- |
-- |
Granite Installation (1) * 10.17.2024 |
|
|
-- |
-- |
Interior Trim - Install (3) 08.21.2024 |
In process 8/18 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 09.23.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 08.28.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 10.05.2024 |
In process 10/2 |
|
-- |
-- |
Luxury Vinyl Tile (0) 10.09.2024 |
|
|
-- |
-- |
Paint 2 (3) 09.18.2024 |
|
|
-- |
-- |
Cover Floors (1) 10.17.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 09.25.2024 |
|
|
-- |
-- |
Shoe Moulding (0) 10.12.2024 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 10.02.2024 |
In process 9/28. Needs mirrors once cabinets are installed. |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 10.17.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 09.12.2024 |
|
|
-- |
-- |
Set Water Meter (0) 09.17.2024 |
|
|
-- |
-- |
Electric Trim Out (3) 10.19.2024 |
In process 10/16 |
|
-- |
-- |
Ceiling Fans (0) 10.12.2024 |
|
|
-- |
-- |
HVAC Trim Out (1) 10.12.2024 |
|
|
-- |
-- |
Blower Door Test (1) 10.28.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2) 10.26.2024 |
In process 10/23 |
|
-- |
-- |
Install Appliances (0) * 10.23.2024 |
|
|
-- |
-- |
Paint 3 (2) * 10.16.2024 |
|
|
-- |
-- |
Carpet (2) 10.05.2024 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 10.24.2024 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 11.04.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 11.04.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 11.04.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 11.02.2024 |
Tue, Oct 29 |
|
-- |
-- |
Pre Walk Through (0) 11.02.2024 |
10/25 |
|
-- |
-- |
Stain Hardwood Stairs (1) 10.19.2024 |
|
|
-- |
-- |
Cleaning (1) 11.02.2024 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 11.05.2024 |
|
|
-- |
-- |
C.O. to Lender (0) 11.05.2024 |
|
|
-- |
-- |
Schedule Closing (0) 10.31.2024 |
|
|
-- |
-- |
Buyer Walk Through (1) 10.24.2024 |
|
|
-- |
-- |
Payment for Upgrades (0) 10.24.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 11.02.2024 |
|
|
-- |
-- |
Review Settlement Statement (0) 10.24.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 10.25.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 10.31.2024 |
|
|
-- |
-- |
Closing (1) 11.01.2024 |
Terry @ Eagle Title |
|
-- |
-- |
Remove Coded Lockbox (0) 11.07.2024 |
|
|