1 28 33 37 45 46 47 48 71 52 70 69 67 53 54 55 56 59 58 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 57  ::  1362 Appaloosa Court
[ BUILD: 20231962 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Wednesday (Sep 18)    show all photos
--   --   Driveway is expanded
--   --   Does the basement patio deck need railings?
Fri    Sep 20      Ratified Contract? (0)      
    Finished Bonus Room Behind Garage (carpet, closet, roughed in bathroom)  
    Finished Full Bathroom in Bonus Room (luxury vinyl tile, 24" vanity)  
Fri    Sep 20      $2500 Deposit Received (0)      
Fri    Sep 20      Association Packet Requested (0)      
Fri    Sep 20      Association Packet Received (0)      
Fri    Sep 20      Selections Meeting (0)      
Fri    Sep 20      Selections Sheet Signed (0)      
Fri    Sep 20      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Fri    Sep 20      Deposit For Upgrades Received (0)      
Fri    Sep 20      Settlement Agent Confirmed (0)      
Fri    Sep 20      Order Cabinets (0)      
Fri    Sep 20      Sod / Seed / Landscaping (0)      
Fri    Sep 20      Inspection (Deck Piers) (0)      
Fri    Sep 20      Inspection (Electric Service) (0)      
Fri    Sep 20      Set Electric Meter (0)      
Fri    Sep 20      Loan Approval (0)      
Fri    Sep 20      Deed Preparation (0)      
Fri    Sep 20      Garage Door (0)      
Fri    Sep 20      House Numbers (0)      
Fri    Sep 20      Mailbox (0)      
Fri    Sep 20      Cabinet Installation (2)      
Tue    Sep 24      Granite Installation (1)      
Wed    Sep 25      Interior Trim - Install (3)      
Mon    Sep 30      Order Plumbing / Lighting Fixtures (0)      
Mon    Sep 30      Interior Trim - Paint (1)      
Tue    Oct 1      Luxury Vinyl Plank (3)      
Fri    Oct 4      Luxury Vinyl Tile (0)      
Fri    Oct 4      Paint 2 (3)      
Wed    Oct 9      Cover Floors (1)      
Thu    Oct 10      Deliver Plumbing / Lighting Fixtures (0)      
Thu    Oct 10      Shoe Moulding (0)      
Thu    Oct 10      Shelving, Door Knobs, Fire Extinguisher (0)      
Thu    Oct 10      Install Coded Lockbox (add extra keys) (0)      
Thu    Oct 10      Pay Water / Sewer Taps (0)      
Thu    Oct 10      Set Water Meter (0)      
Thu    Oct 10      Electric Trim Out (3)      
Tue    Oct 15      Ceiling Fans (0)      
Tue    Oct 15      HVAC Trim Out (1)      
Wed    Oct 16      Blower Door Test (1)      
Thu    Oct 17      Plumbing Trim Out (2)      
Mon    Oct 21      Install Appliances (0)      
Mon    Oct 21      Paint 3 (2)      
Wed    Oct 23      Carpet (2)      
Fri    Oct 25      Appraiser Confirms Construction Completion (0)      
Fri    Oct 25      Inspection (Final HVAC) (1)      
Mon    Oct 28      Inspection (Final Plumbing) (1)      
Tue    Oct 29      Inspection (Final Electric) (1)      
Wed    Oct 30      Inspection (Final Building) (2)      
Fri    Nov 1      Pre Walk Through (0)      
Fri    Nov 1      Stain Hardwood Stairs (1)      
Mon    Nov 4      Cleaning (1)      
Tue    Nov 5      Certificate of Occupancy (1)      
Wed    Nov 6      C.O. to Lender (0)      
Wed    Nov 6      Schedule Closing (0)      
Wed    Nov 6      Buyer Walk Through (1)      
Thu    Nov 7      Payment for Upgrades (0)      
Thu    Nov 7      Keys to Settlement Agent (0)      
Thu    Nov 7      Review Settlement Statement (0)      
Thu    Nov 7      Jerry Signs Closing Documents (0)      
Thu    Nov 7      Request Trash Tote From POA Manager (0)      
Thu    Nov 7      Closing (1)      
Fri    Nov 8      Remove Coded Lockbox (0)      
--   --   Broken primary bedroom window On order
--   --   Deadbolt is missing on back patio door
-- -- Building Permit (30)  04.18.2024    
-- -- Order Roof & Floor Trusses (1)  07.08.2024    
-- -- Order Windows & Doors (0)  07.20.2024    
-- -- Stake Out Home (1)  04.18.2024    
-- -- Excavate (2)  04.18.2024    
-- -- Inspection (Footers) (1)  04.18.2024    
-- -- Inspection (Concrete Wall) (1)  04.18.2024    
-- -- Pour Footers (1)  04.18.2024    
-- -- Set Forms (2)  04.18.2024    
-- -- Pour Foundation Walls (1)  04.18.2024    
-- -- Plumb Slab (2)  04.18.2024    
-- -- Inspection (Plumbing Under Slab) (1)  04.25.2024    
-- -- Inspection (Conduit Under Slab) (1)  04.25.2024    
-- -- Prepare Slab (1)  04.25.2024    
-- -- Inspection (Slab) (1)  04.25.2024    
-- -- Inspection (Drain Tile) (0)  04.25.2024    
-- -- Pour Slab (1)  04.25.2024    
-- -- Framing I (9)  05.16.2024    
-- -- Order Steps (0)  07.08.2024    
-- -- Order Tubs / Showers (0)  07.08.2024    
-- -- Framing II (8)  07.08.2024    
-- -- Framing III (8)  07.08.2024    
-- -- Verify Window & Roof Structure (0)  07.08.2024    
-- -- Install Stairs (0)  07.08.2024    
-- -- Windows & Doors (0)  08.14.2024    
-- -- House Number and Status in Window (0)  07.20.2024    
-- -- Roofing (0)  07.15.2024    
-- -- Order Appliances (0)  08.12.2024    
-- -- Deck (0)  09.04.2024    
-- -- Gutters (0)  09.04.2024    
-- -- Driveway (0)  09.11.2024    
-- -- Patio (0)  09.15.2024    
-- -- Privacy Divider / Fence (0)  09.04.2024    
-- -- HVAC Rough In (4)  07.20.2024    
-- -- Inspection (Rough In HVAC) (1)  08.03.2024    
-- -- Rough In Microwave Vent (0)  07.20.2024    
-- -- Plumbing Rough In (4)  07.24.2024     Almost completed. 7/20
-- -- Inspection (Rough In Plumbing) (1)  08.03.2024    
-- -- Electric Rough In (4)  08.03.2024     In process 7/24
-- -- Inspection (Rough In Electric) (1)  08.03.2024     likely Monday 7/29 for inspection
-- -- Inspection (Framing) (1)  08.03.2024    
-- -- Exterior Vinyl (0)  09.04.2024    
-- -- Exterior Stone (0)  09.04.2024    
-- -- Insulation (2)  08.03.2024    
-- -- Inspection (Insulation) (1)  08.15.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  08.15.2024    
-- -- Drywall (Hang) (4)  08.18.2024     In process 8/14
-- -- Drywall (Tape, Block, Skim, Sand) (6)  08.28.2024     In process 8/24
-- -- Paint 1 (1)  08.28.2024