12 x 18 deck is here |
|
|
-- |
-- |
Make sure deck is really 12 x 18 |
|
|
-- |
-- |
Missing deck board |
|
|
-- |
-- |
Few blemishes on cabinet fronts. Mainly drawer and left cabinet front. |
Jill has patched them 9/15 |
|
-- |
-- |
Tell buyer when to schedule an inspection |
|
|
-- |
-- |
Cover carpet |
|
|
-- |
-- |
Doors are going to need to be trimmed down to slide over carpet easily |
George |
|
-- |
-- |
Missing one master towel bar |
|
|
-- |
-- |
Trim garage |
|
|
-- |
-- |
Oven needs to be pushed into place after plug is installed |
Tom |
|
-- |
-- |
Pretty large drywall hole and stairwell |
|
|
-- |
-- |
Door needed to utility room |
|
|
-- |
-- |
Trim out garage |
|
|
-- |
-- |
Install master bedroom closet door |
George |
|
-- |
-- |
Needs front door locks and back patio door lock installed |
Paul |
|
-- |
-- |
Hallway lights are upside down |
Electrician |
|
-- |
-- |
Mirrors needed |
Paul |
|
-- |
-- |
Need a few light bulbs |
Jill |
|
-- |
-- |
Light needed in powder bathroom |
after silly sink without cabinet |
|
-- |
-- |
Doorbell needs installed |
electrician |
|
-- |
-- |
Need brown electrical covers and outlets for kitchen island |
Jill |
|
-- |
-- |
Install attic cover |
|
|
-- |
-- |
CODED LOCKBOX 5858 |
|
|
-- |
-- |
Home Inspection - Mon, Nov 11 at 9AM |
|
|
-- |
-- |
Radon test Friday 12PM until Monday |
|
|
-- |
-- |
Do you want to patch the holes in the basement concrete? |
|
|
-- |
-- |
Is there a missing piece of insulation in the roughed-in bathroom in the basement? |
|
|
-- |
-- |
Install screens |
Jill |
|
-- |
-- |
Missing a few lightbulbs |
Jill |
|
-- |
-- |
Hook up heat pump |
|
|
-- |
-- |
Caulk side splashes |
Painter |
|
-- |
-- |
Small hole needs trim outside of master bedroom |
Painter or George |
|
-- |
-- |
Outlet too close to master mirror |
Electrician |
|
-- |
-- |
Trim needed in front of bathtub and shower |
George |
|
-- |
-- |
Few vents are not set correctly in flooring |
|
|
-- |
-- |
Quarter round needed in closet |
George |
|
-- |
-- |
Home Inspection |
Monday, Nov 11 at 9AM |
|
-- |
-- |
Cable cover needed |
Tom (garage) |
|
-- |
-- |
Final few paint touchups needed before final walk-through |
Painters |
|
-- |
-- |
Needs patio door screen |
|
|
-- |
-- |
Clean spots off granite |
Jill |
|
-- |
-- |
fill holes bonus room floor |
Tom |
|
-- |
-- |
cut hole for future tub in bonus bath concrete |
Cut concrete |
|
-- |
-- |
fix floor register in laundry room |
Tom |
|
-- |
-- |
secure fan remote to wall in mastr |
need better anchors |
|
-- |
-- |
address garage door hinges- see report |
the door does not close |
|
-- |
-- |
Cover cable box |
Jill |
|
-- |
-- |
Ratified Contract? (0) 05.16.2024 |
|
|
-- |
-- |
$2500 Deposit Received (0) 05.23.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 05.16.2024 |
|
|
-- |
-- |
Association Packet Received (0) 05.18.2024 |
|
|
-- |
-- |
Selections Meeting (0) 06.05.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 06.07.2024 |
6/5: sent to buyers |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 06.08.2024 |
6/8: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 06.08.2024 |
|
|
-- |
-- |
Building Permit (30) 04.18.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 07.08.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 07.20.2024 |
|
|
-- |
-- |
Stake Out Home (1) 04.18.2024 |
|
|
-- |
-- |
Excavate (2) 04.18.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 04.18.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 04.18.2024 |
|
|
-- |
-- |
Pour Footers (1) 04.18.2024 |
|
|
-- |
-- |
Set Forms (2) 04.18.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 04.18.2024 |
|
|
-- |
-- |
Plumb Slab (2) 04.18.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 04.25.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 04.25.2024 |
|
|
-- |
-- |
Prepare Slab (1) 04.25.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 04.25.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 04.25.2024 |
|
|
-- |
-- |
Pour Slab (1) * 04.25.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 07.24.2024 |
sent |
|
-- |
-- |
Framing I (9) 05.16.2024 |
|
|
-- |
-- |
Order Steps (0) 07.08.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0) 07.08.2024 |
|
|
-- |
-- |
Framing II (8) 07.08.2024 |
|
|
-- |
-- |
Framing III (8) * 07.08.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 07.08.2024 |
|
|
-- |
-- |
Install Stairs (0) 07.08.2024 |
|
|
-- |
-- |
Windows & Doors (0) 07.20.2024 |
|
|
-- |
-- |
House Number and Status in Window (0) 07.20.2024 |
|
|
-- |
-- |
Roofing (0) 07.15.2024 |
|
|
-- |
-- |
Order Cabinets (0) 08.06.2024 |
|
|
-- |
-- |
Order Appliances (0) 08.12.2024 |
|
|
-- |
-- |
Deck (0) 08.18.2024 |
|
|
-- |
-- |
Gutters (0) 09.04.2024 |
|
|
-- |
-- |
Driveway (0) 09.15.2024 |
|
|
-- |
-- |
Patio (0) 09.04.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 09.15.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 10.23.2024 |
|
|
-- |
-- |
HVAC Rough In (4) 07.20.2024 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 08.03.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 09.11.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 07.24.2024 |
In process 7/20 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 08.03.2024 |
|
|
-- |
-- |
Electric Rough In (4) 08.03.2024 |
In process 7/24 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 08.03.2024 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 09.11.2024 |
|
|
-- |
-- |
Inspection (Framing) (1) 08.03.2024 |
|
|
-- |
-- |
Exterior Vinyl (0) * 09.04.2024 |
|
|
-- |
-- |
Exterior Stone (0) 09.04.2024 |
|
|
-- |
-- |
Insulation (2) 08.03.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1) 08.14.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 09.26.2024 |
|
|
-- |
-- |
Set Electric Meter (0) 10.25.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 04.04.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 04.04.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 08.15.2024 |
|
|
-- |
-- |
Drywall (Hang) (4) * 08.14.2024 |
In process 8/10 |
|
-- |
-- |
Loan Approval (0) 09.26.2024 |
Ryan Charles, Alcova Mortgage (96.5% FHA) |
|
-- |
-- |
Deed Preparation (0) 09.26.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 08.28.2024 |
In process 8/24 |
|
-- |
-- |
Paint 1 (1) 08.28.2024 |
|
|
-- |
-- |
Garage Door (0) 10.06.2024 |
|
|
-- |
-- |
House Numbers (0) 10.30.2024 |
|
|
-- |
-- |
Mailbox (0) 11.16.2024 |
Install |
|
-- |
-- |
Cabinet Installation (2) * 09.04.2024 |
Delivered 8/28, Installed 8/29 |
|
-- |
-- |
Granite Installation (1) * 09.11.2024 |
|
|
-- |
-- |
Interior Trim - Install (3) 09.21.2024 |
In process 9/18 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 09.26.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 09.21.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 09.25.2024 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 09.21.2024 |
|
|
-- |
-- |
Paint 2 (3) 09.04.2024 |
|
|
-- |
-- |
Cover Floors (1) 09.28.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 09.26.2024 |
|
|
-- |
-- |
Shoe Moulding (0) 10.05.2024 |
In process 10/2 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 10.16.2024 |
In process 10/9. Needs front door knobs, and shelving installed. |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 10.31.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 09.26.2024 |
|
|
-- |
-- |
Set Water Meter (0) 09.30.2024 |
|
|
-- |
-- |
Electric Trim Out (3) 10.23.2024 |
|
|
-- |
-- |
Ceiling Fans (0) 10.23.2024 |
|
|
-- |
-- |
HVAC Trim Out (1) 10.16.2024 |
|
|
-- |
-- |
Blower Door Test (1) 11.07.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2) 11.06.2024 |
In process 10/30 |
|
-- |
-- |
Install Appliances (0) * 10.05.2024 |
Current Delivery/Install Date 9/20 |
|
-- |
-- |
Paint 3 (2) * 10.12.2024 |
|
|
-- |
-- |
Carpet (2) 09.25.2024 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 11.13.2024 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 11.09.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 11.09.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 11.09.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 11.09.2024 |
Thurs, Nov 7 |
|
-- |
-- |
Pre Walk Through (0) 11.13.2024 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 11.06.2024 |
In process 11/2 |
|
-- |
-- |
Cleaning (1) 11.13.2024 |
will be done 11/11 |
|
-- |
-- |
Certificate of Occupancy (1) * 11.14.2024 |
|
|
-- |
-- |
C.O. to Lender (0) 11.14.2024 |
|
|
-- |
-- |
Schedule Closing (0) 11.13.2024 |
|
|
-- |
-- |
Buyer Walk Through (1) 11.13.2024 |
kate setting up |
|
-- |
-- |
Payment for Upgrades (0) 11.11.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 11.13.2024 |
|
|
-- |
-- |
Review Settlement Statement (0) 11.13.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 09.18.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 11.13.2024 |
|
|
-- |
-- |
Closing (1) 11.21.2024 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 11.21.2024 |
|
|