CONGERS-2 - 59  ::  1354 Appaloosa Court
[ BUILD: 20231964 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
Must have single driveway Cannot be expanded
Tom checking about expanded driveway 7/11
Install hardwood treads on second level
Upgrade the size of the deck?
Remove extra set of steps
The side of the vinyl should be blue and not brown? Correct?
Add oceanside shakes on left edge of Lot 59 (instead of brown) Davenport - Jeremy
Paint 1 in process 9/4
Water on rocks. Jeremy said more gutter is needed
Door needed to utility room on order
Appliances being delivered Monday 10/7
Patch holes at garage trim
Landscaping needed on side of house Pettit
Paint inside of closet door Closet under steps on ground level - painter
Trim needed outside of door to utility room George
Paint all trim in bonus room Painter
CODED LOCKBOX 5959
Dining room, chandelier and powder bath light needed Electrician
All mirrors needed
Attic cover needed
Mirror needed in bonus bathroom and powder bathroom
A few HVAC registers are missing Jill
Mirror needed in bonus bath and hall bath
Bottom tub trimout bonus Drain cover - plumber
Busted master bedroom door Painter
Handle needed to utility room door and bonus room
Handle needed to utility room door in bonus room
Handlebars on both sets of steps need to be painted painter
Bottom, drain cover missing in call bath plumber
A few doorstops needed throughout home Paul
Remove items from driveway Tom or Jill
Remove items from garage Tom or Jill
Install cable cover in garage
Feud paint touchup needed on walls and handrails few
Clean primary bathroom mirror window
White board needed to back patio
Small amount of glue needs removed on bonus bathtub
Are we patching the ceiling with brown touchup putty?
Change lightbulbs to daylight Jill
Install window screens Front windows needed and back master bedroom 11/30
Remove three ladders Jill
Sweep down stairs deck Jill
Adjust floor register in laundry
Adjust loose cabinet door under kitchen sink Jill
Full nail hole on stair transition strip Denny
Adjust water pressure Jill
Paint touch up throughout Painter
Remove glue on tub Jill
Whiteboard needed on back deck Tom
Floors could use a good sweep and mopping before closing Jill
Paint touch up throughout Painter
Remove whiteboards from garage Jill
Remove rocks from molding once glue has dried I removed half of them when I left the townhouse.
Clean off driveway and remove porta potty Needs pressure washing
Cover exposed wires on side of house
small scratches on steps
pressure wash drivewy
need master window screens
need 1 pc. w. stripping and little door pad for front door Jill
3 doors need attention on 3rd floor George
Touch up paint around upstairs door repairs Painter
UPGRADES - COMPLETED
    Upgraded LVT Baths and Laundry  
    Finished Bonus Room  
    Finished Bonus Bathroom  
    Expanded 12 x 18 Deck  
    Expanded Driveway  
    Level III Granite Salinas White in Kitchen  
    LVP Upstairs hallway and bedrooms  
    LVP in Bonus Room  
    Oak Stairs to Bedroom Level  
    Amendment to increase price by $28,140  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  07.01.2024    
-- -- $2500 Deposit Received (0)  07.02.2024    
-- -- Association Packet Requested (0)  07.01.2024    
-- -- Association Packet Received (0)  07.03.2024    
-- -- Selections Meeting (0)  07.16.2024    
-- -- Selections Sheet Signed (0)  07.23.2024    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  07.28.2024     7/27: sent to Jerry
-- -- Deposit For Upgrades Received (0)  07.28.2024    
-- -- Building Permit (30) *   04.18.2024    
-- -- Order Roof & Floor Trusses (1)  07.08.2024    
-- -- Order Windows & Doors (0)  07.20.2024    
-- -- Stake Out Home (1)  04.18.2024    
-- -- Excavate (2)  04.18.2024    
-- -- Inspection (Footers) (1)  04.18.2024    
-- -- Inspection (Concrete Wall) (1)  04.18.2024    
-- -- Pour Footers (1) *   04.18.2024    
-- -- Set Forms (2)  04.18.2024    
-- -- Pour Foundation Walls (1)  04.18.2024    
-- -- Plumb Slab (2)  04.18.2024    
-- -- Inspection (Plumbing Under Slab) (1)  04.25.2024    
-- -- Inspection (Conduit Under Slab) (1)  04.25.2024    
-- -- Prepare Slab (1)  04.25.2024    
-- -- Inspection (Slab) (1)  04.25.2024    
-- -- Inspection (Drain Tile) (0)  04.25.2024    
-- -- Pour Slab (1) *   04.25.2024    
-- -- Settlement Agent Confirmed (0)  07.30.2024     sent 7/28
-- -- Framing I (9)  05.16.2024    
-- -- Order Steps (0)  07.08.2024    
-- -- Order Tubs / Showers (0)  07.08.2024    
-- -- Framing II (8)  07.08.2024    
-- -- Framing III (8) *   07.08.2024    
-- -- Verify Window & Roof Structure (0)  07.08.2024    
-- -- Install Stairs (0) *   07.08.2024    
-- -- Windows & Doors (0) *   07.20.2024    
-- -- House Number and Status in Window (0)  07.20.2024    
-- -- Roofing (0) *   07.15.2024    
-- -- Order Cabinets (0)  08.06.2024    
-- -- Order Appliances (0)  08.12.2024    
-- -- Deck (0)  08.24.2024    
-- -- Gutters (0)  09.04.2024    
-- -- Driveway (0) *   09.15.2024    
-- -- Patio (0)  08.24.2024    
-- -- Privacy Divider / Fence (0) *   09.11.2024    
-- -- Sod / Seed / Landscaping (0)  10.26.2024    
-- -- HVAC Rough In (4)  07.20.2024    
-- -- Rough In Microwave Vent (0)  07.20.2024    
-- -- Plumbing Rough In (4)  07.24.2024     In process 7/20
-- -- Electric Rough In (4)  08.03.2024    
-- -- Inspection (Rough In HVAC) (1)  08.03.2024    
-- -- Inspection (Rough In Plumbing) (1)  08.03.2024    
-- -- Inspection (Rough In Electric) (1)  08.03.2024    
-- -- Inspection (Framing) (1) *   08.03.2024    
-- -- Inspection (Deck Piers) (0)  10.14.2024    
-- -- Exterior Vinyl (0) *   08.24.2024    
-- -- Exterior Stone (0)  09.15.2024     Almost complete 9/11
-- -- Insulation (2) *   08.03.2024    
-- -- Inspection (Insulation) (1)  08.10.2024    
-- -- Inspection (Electric Service) (0)  09.26.2024    
-- -- Set Electric Meter (0) *   10.25.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  08.15.2024    
-- -- Drywall (Hang) (4) *   08.10.2024    
-- -- Loan Approval (0)  11.23.2024     Kozhin Ahmad, Nexa (80% DCSR)
-- -- Deed Preparation (0)  10.14.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   09.04.2024     In process 8/28
-- -- Paint 1 (1)  09.04.2024    
-- -- Garage Door (0)  10.06.2024    
-- -- House Numbers (0)  10.30.2024    
-- -- Mailbox (0)  10.06.2024    
-- -- Cabinet Installation (2) *   09.08.2024     Delivered 8/28, Installed 8/29
-- -- Granite Installation (1) *   09.11.2024    
-- -- Interior Trim - Install (3) *   10.09.2024     In process 10/5
-- -- Order Plumbing / Lighting Fixtures (0)  09.26.2024    
-- -- Interior Trim - Paint (1)  10.09.2024    
-- -- Luxury Vinyl Plank (3) *   10.26.2024     Almost completed 10/23
-- -- Luxury Vinyl Tile (0)  10.26.2024     In process 10/23
-- -- Paint 2 (3)  09.11.2024    
-- -- Cover Floors (0)  11.02.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  10.24.2024    
-- -- Shoe Moulding (0)  10.30.2024     In process 10/26
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   11.02.2024     In process 10/26
-- -- Install Coded Lockbox (add extra keys) (0)  11.09.2024    
-- -- Pay Water / Sewer Taps (0)  09.26.2024    
-- -- Set Water Meter (1) *   09.30.2024    
-- -- Electric Trim Out (3) *   11.02.2024     In process 10/30
-- -- Ceiling Fans (0)  11.02.2024    
-- -- HVAC Trim Out (1) *   10.23.2024    
-- -- Blower Door Test (1)  11.11.2024    
-- -- Plumbing Trim Out (2) *   11.09.2024    
-- -- Install Appliances (0) *   11.09.2024     In kitchen
-- -- Paint 3 (2) *   11.02.2024    
-- -- Carpet (2)  11.02.2024    
-- -- Appraiser Confirms Construction Completion (0)  11.23.2024    
-- -- Inspection (Final HVAC) (0)  11.14.2024    
-- -- Inspection (Final Plumbing) (0)  11.14.2024    
-- -- Inspection (Final Electric) (0)  11.14.2024    
-- -- Inspection (Final Building) (4) *   11.18.2024     Fri, Nov 15
-- -- Pre Walk Through (0)  11.18.2024    
-- -- Stain Hardwood Stairs (1) *   11.16.2024     in process 11/13. Needs another coat.
-- -- Cleaning (1)  11.16.2024    
-- -- Certificate of Occupancy (1) *   11.23.2024    
-- -- C.O. to Lender (0)  11.23.2024    
-- -- Schedule Closing (0)  11.23.2024    
-- -- Buyer Walk Through (1) *   11.21.2024    
-- -- Payment for Upgrades (0)  11.18.2024    
-- -- Keys to Settlement Agent (0)  11.18.2024    
-- -- Review Settlement Statement (0)  11.26.2024    
-- -- Jerry Signs Closing Documents (0)  11.26.2024    
-- -- Request Trash Tote From POA Manager (0)  11.18.2024    
-- -- Closing (1)  12.21.2024     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  12.21.2024