Remove extra set of steps |
|
|
-- |
-- |
Add oceanside shakes on left edge of Lot 59 (instead of brown) |
Davenport |
|
|
|
Upgraded LVT Baths and Laundry
|
|
|
|
LVP Upstairs hallway and bedrooms
|
|
|
|
LVP in Bonus Room
|
|
Fri |
Sep 20 |
Sod / Seed / Landscaping (0)
|
|
|
Fri |
Sep 20 |
Inspection (Deck Piers) (0)
|
|
|
Fri |
Sep 20 |
Inspection (Electric Service) (0)
|
|
|
Fri |
Sep 20 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 20 |
Loan Approval (0)
|
|
|
Fri |
Sep 20 |
Deed Preparation (0)
|
|
|
Fri |
Sep 20 |
Garage Door (0)
|
|
|
Fri |
Sep 20 |
House Numbers (0)
|
|
|
Fri |
Sep 20 |
Mailbox (0)
|
|
|
Fri |
Sep 20 |
Interior Trim - Install (3)
|
In process 9/18 |
|
Wed |
Sep 25 |
Order Plumbing / Lighting Fixtures (0)
|
|
|
Wed |
Sep 25 |
Interior Trim - Paint (1)
|
|
|
Thu |
Sep 26 |
Luxury Vinyl Plank (3)
|
|
|
Tue |
Oct 1 |
Luxury Vinyl Tile (0)
|
|
|
Tue |
Oct 1 |
Cover Floors (1)
|
|
|
Wed |
Oct 2 |
Deliver Plumbing / Lighting Fixtures (0)
|
|
|
Wed |
Oct 2 |
Shoe Moulding (0)
|
|
|
Wed |
Oct 2 |
Shelving, Door Knobs, Fire Extinguisher (0)
|
|
|
Wed |
Oct 2 |
Install Coded Lockbox (add extra keys) (0)
|
|
|
Wed |
Oct 2 |
Pay Water / Sewer Taps (0)
|
|
|
Wed |
Oct 2 |
Set Water Meter (0)
|
|
|
Wed |
Oct 2 |
Electric Trim Out (3)
|
|
|
Mon |
Oct 7 |
Ceiling Fans (0)
|
|
|
Mon |
Oct 7 |
HVAC Trim Out (1)
|
|
|
Tue |
Oct 8 |
Blower Door Test (1)
|
|
|
Wed |
Oct 9 |
Plumbing Trim Out (2)
|
|
|
Fri |
Oct 11 |
Install Appliances (0)
|
|
|
Fri |
Oct 11 |
Paint 3 (2)
|
|
|
Tue |
Oct 15 |
Carpet (2)
|
|
|
Thu |
Oct 17 |
Appraiser Confirms Construction Completion (0)
|
|
|
Thu |
Oct 17 |
Inspection (Final HVAC) (1)
|
|
|
Fri |
Oct 18 |
Inspection (Final Plumbing) (1)
|
|
|
Mon |
Oct 21 |
Inspection (Final Electric) (1)
|
|
|
Tue |
Oct 22 |
Inspection (Final Building) (2)
|
|
|
Thu |
Oct 24 |
Pre Walk Through (0)
|
|
|
Thu |
Oct 24 |
Stain Hardwood Stairs (1)
|
|
|
Fri |
Oct 25 |
Cleaning (1)
|
|
|
Mon |
Oct 28 |
Certificate of Occupancy (1)
|
|
|
Tue |
Oct 29 |
C.O. to Lender (0)
|
|
|
Tue |
Oct 29 |
Schedule Closing (0)
|
|
|
Tue |
Oct 29 |
Buyer Walk Through (1)
|
|
|
Wed |
Oct 30 |
Payment for Upgrades (0)
|
|
|
Wed |
Oct 30 |
Keys to Settlement Agent (0)
|
|
|
Wed |
Oct 30 |
Review Settlement Statement (0)
|
|
|
Wed |
Oct 30 |
Jerry Signs Closing Documents (0)
|
|
|
Wed |
Oct 30 |
Request Trash Tote From POA Manager (0)
|
|
|
Wed |
Oct 30 |
Closing (1)
|
Brittany @ West View Title |
|
Thu |
Oct 31 |
Remove Coded Lockbox (0)
|
|
|
|
-- |
-- |
Must have single driveway |
Cannot be expanded |
|
-- |
-- |
Tom checking about expanded driveway 7/11 |
|
|
-- |
-- |
Install hardwood treads on second level |
|
|
-- |
-- |
Upgrade the size of the deck? |
|
|
-- |
-- |
The side of the vinyl should be blue and not brown? Correct? |
|
|
-- |
-- |
Paint 1 in process 9/4 |
|
|
-- |
-- |
Ratified Contract? (0)
07.01.2024 |
|
|
|
|
Upgraded LVT Baths and Laundry
|
|
|
|
LVP Upstairs hallway and bedrooms
|
|
|
|
LVP in Bonus Room
|
|
-- |
-- |
$2500 Deposit Received (0)
07.02.2024 |
|
|
-- |
-- |
Association Packet Requested (0)
07.01.2024 |
|
|
-- |
-- |
Association Packet Received (0)
07.03.2024 |
|
|
-- |
-- |
Selections Meeting (0)
07.16.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0)
07.23.2024 |
|
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
07.28.2024 |
7/27: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0)
07.28.2024 |
|
|
-- |
-- |
Building Permit (30)
04.18.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
07.08.2024 |
|
|
-- |
-- |
Order Windows & Doors (0)
07.20.2024 |
|
|
-- |
-- |
Stake Out Home (1)
04.18.2024 |
|
|
-- |
-- |
Excavate (2)
04.18.2024 |
|
|
-- |
-- |
Inspection (Footers) (1)
04.18.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
04.18.2024 |
|
|
-- |
-- |
Pour Footers (1)
04.18.2024 |
|
|
-- |
-- |
Set Forms (2)
04.18.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1)
04.18.2024 |
|
|
-- |
-- |
Plumb Slab (2)
04.18.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
04.25.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
04.25.2024 |
|
|
-- |
-- |
Prepare Slab (1)
04.25.2024 |
|
|
-- |
-- |
Inspection (Slab) (1)
04.25.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
04.25.2024 |
|
|
-- |
-- |
Pour Slab (1)
04.25.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
07.30.2024 |
sent 7/28 |
|
-- |
-- |
Framing I (9)
05.16.2024 |
|
|
-- |
-- |
Order Steps (0)
07.08.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0)
07.08.2024 |
|
|
-- |
-- |
Framing II (8)
07.08.2024 |
|
|
-- |
-- |
Framing III (8)
07.08.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0)
07.08.2024 |
|
|
-- |
-- |
Install Stairs (0)
07.08.2024 |
|
|
-- |
-- |
Windows & Doors (0)
07.20.2024 |
|
|
-- |
-- |
House Number and Status in Window (0)
07.20.2024 |
|
|
-- |
-- |
Roofing (0)
07.15.2024 |
|
|
-- |
-- |
Order Cabinets (0)
08.06.2024 |
|
|
-- |
-- |
Order Appliances (0)
08.12.2024 |
|
|
-- |
-- |
Deck (0)
08.24.2024 |
|
|
-- |
-- |
Gutters (0)
09.04.2024 |
|
|
-- |
-- |
Driveway (0)
09.15.2024 |
|
|
-- |
-- |
Patio (0)
08.24.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0)
09.11.2024 |
|
|
-- |
-- |
HVAC Rough In (4)
07.20.2024 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
08.03.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0)
07.20.2024 |
|
|
-- |
-- |
Plumbing Rough In (4)
07.24.2024 |
In process 7/20 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
08.03.2024 |
|
|
-- |
-- |
Electric Rough In (4)
08.03.2024 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1)
08.03.2024 |
|
|
-- |
-- |
Inspection (Framing) (1)
08.03.2024 |
|
|
-- |
-- |
Exterior Vinyl (0)
08.24.2024 |
|
|
-- |
-- |
Exterior Stone (0)
09.15.2024 |
Almost complete 9/11 |
|
-- |
-- |
Insulation (2)
08.03.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1)
08.10.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
04.04.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
04.04.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
08.15.2024 |
|
|
-- |
-- |
Drywall (Hang) (4)
08.10.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
09.04.2024 |
In process 8/28 |
|
-- |
-- |
Paint 1 (1)
09.04.2024 |
|
|
-- |
-- |
Cabinet Installation (2)
09.08.2024 |
Delivered 8/28, Installed 8/29 |
|
-- |
-- |
Granite Installation (1)
09.11.2024 |
|
|
-- |
-- |
Paint 2 (3)
09.11.2024 |
|
|