1 14 73 65 61 62 63 ADDR
CONGERS-2 - 66  ::  1377 Appaloosa Court
[ BUILD: 20232173 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Deck patio doors need installed on all units
--   --   Does anything need to be done with the block that is intruding into the bonus room? Insulation?
--   --   Set of appliances in kitchen
--   --   Just making sure these folks were charged for the quartz countertop
--   --   Is the correct cabinet piece installed for where the dishwasher will go?
--   --   Garage door needs window grill insert Davenport
--   --   Missing stairwell spindles George
--   --   Set splash blocks in place
--   --   Broken corner of driveway Tom. Being fixed 12/7
--   --   Paint garage
--   --   Extra dishwasher in kitchen Goes in 64
--   --   Cover white pipe my front door By - sewer clean out, add cover
--   --   Patch drywall near door front door
--   --   Patch a few drywall spots and powder bathroom Drywaller
--   --   Need lightbulbs Electrician
--   --   Fix island electric outlets. Electrician
--   --   Plug in the stove
--   --   Patch gap between quartz and cabinetry Where cabinet meets drywall - caulk, painters
--   --   CODED LOCKBOX 6666
--   --   Gutter in the front of the house is not straight or attached. Tom
--   --   Dishwasher has a dent in it Kate is communicating with Maya
--   --   A lot of glue needs to be cleaned up from the back deck door Tom
--   --   Whiteboard needs installed on patio and back deck Tom
--   --   Floor vent needs installed properly in the hall bathroom Tom
--   --   Touchup paint needed before cleaning Painter
--   --   Various scratches and blemishes on hardwood treads that have been stained
--   --   GARAGE DOOR ISSUES Jill to discuss
--   --   Garage door opener needs a screw Tom
--   --   Paint needed by front door over patch Painter
--   --   Powder bath paint touchup from patching Painter
--   --   Trim missing in master closet George, behind master closet door
--   --   Remove utilities from garage
--   --   Remove appliances from garage
--   --   Install screens Jill
--   --   Paint touchup Painter
--   --   Uneven seal on garage door Davenport
--   --   Clean farmhouse sink Lynn
--   --   Adjust closet doors Jill
--   --   Wonky stuff going on Seal around garage door needs to be adjusted
--   --   Closing Friday, December 27th
--   --   Install missing screens when they come in (master and living room windows) Jill has them, waiting on someone to move in
--   --   Closing Friday, Jan 3
--   --   Cover up black plastic that is showing through in landscaping Pettit
--   --   Hopefully closing Tuesday, January 7
--   --   Garage door seems out of alignment - think the house is still vacant. 3/15
-- -- Ratified Contract? (0)  05.21.2024    
-- -- $2500 Deposit Received (0)  05.31.2024    
-- -- Association Packet Requested (0)  05.21.2024    
-- -- Association Packet Received (0)  05.23.2024    
-- -- Selections Meeting (0)  06.25.2024    
-- -- Selections Sheet Signed (0)  06.28.2024     6/25: sent to Kozhin
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  07.02.2024     7/1: sent to Jerry for signatures
-- -- Deposit For Upgrades Received (0)  07.02.2024    
-- -- Building Permit (30)  04.18.2024    
-- -- Order Roof & Floor Trusses (1)  07.20.2024    
-- -- Order Windows & Doors (0)  07.20.2024    
-- -- Stake Out Home (1)  04.18.2024    
-- -- Excavate (2)  04.18.2024    
-- -- Inspection (Footers) (1)  04.18.2024    
-- -- Inspection (Concrete Wall) (1)  04.18.2024    
-- -- Pour Footers (1) *   04.18.2024    
-- -- Set Forms (2)  05.06.2024    
-- -- Pour Foundation Walls (1)  05.06.2024    
-- -- Plumb Slab (2)  05.13.2024    
-- -- Inspection (Plumbing Under Slab) (1)  05.23.2024    
-- -- Inspection (Conduit Under Slab) (1)  05.23.2024    
-- -- Prepare Slab (1)  05.23.2024    
-- -- Inspection (Slab) (1)  07.08.2024    
-- -- Inspection (Drain Tile) (0)  07.08.2024    
-- -- Pour Slab (1) *   07.08.2024    
-- -- Settlement Agent Confirmed (0)  07.09.2024     Sent to WVT on July 2
-- -- Framing I (9)  07.08.2024    
-- -- Order Steps (0)  07.20.2024    
-- -- Order Tubs / Showers (0)  07.20.2024    
-- -- Framing II (8)  07.08.2024    
-- -- Framing III (8) *   07.08.2024    
-- -- Verify Window & Roof Structure (0)  07.20.2024    
-- -- Install Stairs (0)  07.20.2024    
-- -- Windows & Doors (0) *   07.20.2024    
-- -- House Number and Status in Window (0)  08.14.2024    
-- -- Roofing (0) *   08.03.2024    
-- -- Order Cabinets (0)  08.28.2024    
-- -- Order Appliances (0)  08.12.2024    
-- -- Deck (0)  09.25.2024    
-- -- Gutters (0)  09.28.2024    
-- -- Driveway (0) *   10.19.2024    
-- -- Patio (0)  11.02.2024    
-- -- Privacy Divider / Fence (0)  11.09.2024    
-- -- Sod / Seed / Landscaping (0)  11.18.2024    
-- -- HVAC Rough In (4)  08.07.2024    
-- -- Inspection (Rough In HVAC) (1)  08.24.2024    
-- -- Rough In Microwave Vent (0)  08.03.2024    
-- -- Plumbing Rough In (4)  08.07.2024     In process 8/3
-- -- Inspection (Rough In Plumbing) (1)  08.24.2024    
-- -- Electric Rough In (4)  08.14.2024    
-- -- Inspection (Rough In Electric) (1)  08.24.2024    
-- -- Inspection (Deck Piers) (0)  11.05.2024    
-- -- Inspection (Framing) (1) *   08.24.2024    
-- -- Exterior Vinyl (0) *   10.05.2024     In process 9/28
-- -- Exterior Stone (0)  10.19.2024    
-- -- Insulation (2) *   08.28.2024    
-- -- Inspection (Insulation) (1)  08.24.2024    
-- -- Inspection (Electric Service) (0)  10.21.2024    
-- -- Set Electric Meter (0) *   10.25.2024    
-- -- Inspection (Main Sewer Line) (0)  10.14.2024    
-- -- Inspection (Main Water Line) (0)  10.14.2024    
-- -- Order Interior Doors & Trim (0)  10.14.2024    
-- -- Drywall (Hang) (4) *   09.07.2024     In process 9/4
-- -- Loan Approval (0)  12.26.2024     Kozhin Ahmad, Nexa (70% LTV)
-- -- Deed Preparation (0)  11.05.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   09.21.2024     In process 9/11
-- -- Paint 1 (1)  09.21.2024    
-- -- Garage Door (0) *   10.26.2024    
-- -- House Numbers (0)  11.18.2024    
-- -- Mailbox (0)  11.16.2024    
-- -- Cabinet Installation (2) *   09.21.2024     Delivered 9/19, Installed 9/20
-- -- Granite Installation (1) *   10.05.2024    
-- -- Interior Trim - Install (3) *   10.26.2024     In process 10/23
-- -- Order Plumbing / Lighting Fixtures (0)  11.07.2024    
-- -- Interior Trim - Paint (1)  11.02.2024    
-- -- Luxury Vinyl Plank (3) *   11.06.2024    
-- -- Luxury Vinyl Tile (0)  11.09.2024    
-- -- Paint 2 (3)  11.16.2024    
-- -- Cover Floors (1)  11.09.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  11.07.2024    
-- -- Shoe Moulding (0)  11.09.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *   11.30.2024     Need shelving, door, knobs, and mirrors. In process 11/23
-- -- Install Coded Lockbox (add extra keys) (0)  12.05.2024    
-- -- Pay Water / Sewer Taps (0)  11.02.2024    
-- -- Set Water Meter (0) *   11.18.2024    
-- -- Electric Trim Out (3)  12.04.2024     In process 11/30
-- -- Ceiling Fans (0)  11.30.2024    
-- -- HVAC Trim Out (1)  12.04.2024    
-- -- Blower Door Test (1)  12.09.2024    
-- -- Plumbing Trim Out (2)  11.20.2024    
-- -- Install Appliances (0) *   11.30.2024     In process 11/20
-- -- Paint 3 (2) *   11.20.2024    
-- -- Carpet (2)  11.09.2024    
-- -- Appraiser Confirms Construction Completion (0)  12.26.2024    
-- -- Inspection (Final HVAC) (1)  12.14.2024    
-- -- Inspection (Final Plumbing) (1)  12.14.2024    
-- -- Inspection (Final Electric) (1)  12.14.2024    
-- -- Inspection (Final Building) (2) *   12.14.2024     Mon, Dec 9
-- -- Pre Walk Through (0)  12.26.2024    
-- -- Stain Hardwood Stairs (1)  12.07.2024    
-- -- Cleaning (1)  12.21.2024     In process 12/18
-- -- Certificate of Occupancy (1) *   12.26.2024    
-- -- C.O. to Lender (0)  12.26.2024    
-- -- Schedule Closing (0)  12.26.2024    
-- -- Buyer Walk Through (1)  12.26.2024    
-- -- Payment for Upgrades (0)  12.20.2024    
-- -- Keys to Settlement Agent (0)  12.20.2024    
-- -- Review Settlement Statement (0)  12.27.2024    
-- -- Jerry Signs Closing Documents (0)  12.27.2024    
-- -- Request Trash Tote From POA Manager (0)  12.26.2024    
-- -- Closing (1)  01.13.2025     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  01.05.2025