1 33 37 89 47 73 67 55 56 59 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 66  ::  1377 Appaloosa Court
[ BUILD: 20232173 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Saturday (Nov 23)    show all photos
--   --   Garage door needs window grill insert Davenport
--   --   Broken corner of driveway Tom
--   --   Paint garage
--   --   Extra dishwasher in kitchen Goes in 64
--   --   Cover white pipe my front door By - sewer clean out, add cover
    Microwave vented to exterior  
Wed    Nov 27      Loan Approval (0)       Kozhin Ahmad, Nexa (70% LTV)
Wed    Nov 27      Shelving, Door Knobs, Fire Extinguisher (0)       Need shelving, door, knobs, and mirrors. In process 11/23
Wed    Nov 27      Install Coded Lockbox (add extra keys) (0)      
Wed    Nov 27      Electric Trim Out (3)      
Mon    Dec 2      Ceiling Fans (0)      
Mon    Dec 2      HVAC Trim Out (1)      
Tue    Dec 3      Blower Door Test (1)      
Wed    Dec 4      Install Appliances (0) *        In process 11/20
Wed    Dec 4      Appraiser Confirms Construction Completion (0)      
Wed    Dec 4      Inspection (Final HVAC) (1)      
Thu    Dec 5      Inspection (Final Plumbing) (1)      
Fri    Dec 6      Inspection (Final Electric) (1)      
Mon    Dec 9      Inspection (Final Building) (2) *        Wed, Nov 27
Wed    Dec 11      Pre Walk Through (0)      
Wed    Dec 11      Stain Hardwood Stairs (1)      
Thu    Dec 12      Cleaning (1)      
Fri    Dec 13      Certificate of Occupancy (1) *       
Mon    Dec 16      C.O. to Lender (0)      
Mon    Dec 16      Schedule Closing (0)      
Mon    Dec 16      Buyer Walk Through (1)      
Tue    Dec 17      Payment for Upgrades (0)      
Tue    Dec 17      Keys to Settlement Agent (0)      
Tue    Dec 17      Review Settlement Statement (0)      
Tue    Dec 17      Jerry Signs Closing Documents (0)      
Tue    Dec 17      Request Trash Tote From POA Manager (0)      
Tue    Dec 17      Closing (1)       Brittany @ West View Title
Wed    Dec 18      Remove Coded Lockbox (0)      
--   --   Deck patio doors need installed on all units
--   --   Does anything need to be done with the block that is intruding into the bonus room? Insulation?
--   --   Set of appliances in kitchen
--   --   Just making sure these folks were charged for the quartz countertop
--   --   Is the correct cabinet piece installed for where the dishwasher will go?
--   --   Missing stairwell spindles George
--   --   Set splash blocks in place
-- -- Ratified Contract? (0)  05.21.2024    
    Microwave vented to exterior  
-- -- $2500 Deposit Received (0)  05.31.2024    
-- -- Association Packet Requested (0)  05.21.2024    
-- -- Association Packet Received (0)  05.23.2024    
-- -- Selections Meeting (0)  06.25.2024    
-- -- Selections Sheet Signed (0)  06.28.2024     6/25: sent to Kozhin
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  07.02.2024     7/1: sent to Jerry for signatures
-- -- Deposit For Upgrades Received (0)  07.02.2024    
-- -- Building Permit (30)  04.18.2024    
-- -- Order Roof & Floor Trusses (1)  07.20.2024    
-- -- Order Windows & Doors (0)  07.20.2024    
-- -- Stake Out Home (1)  04.18.2024    
-- -- Excavate (2)  04.18.2024    
-- -- Inspection (Footers) (1)  04.18.2024    
-- -- Inspection (Concrete Wall) (1)  04.18.2024    
-- -- Pour Footers (1)  04.18.2024    
-- -- Set Forms (2)  05.06.2024    
-- -- Pour Foundation Walls (1)  05.06.2024    
-- -- Plumb Slab (2)  05.13.2024    
-- -- Inspection (Plumbing Under Slab) (1)  05.23.2024    
-- -- Inspection (Conduit Under Slab) (1)  05.23.2024    
-- -- Prepare Slab (1)  05.23.2024    
-- -- Inspection (Slab) (1)  07.08.2024    
-- -- Inspection (Drain Tile) (0)  07.08.2024    
-- -- Pour Slab (1) *   07.08.2024    
-- -- Settlement Agent Confirmed (0)  07.09.2024     Sent to WVT on July 2
-- -- Framing I (9)  07.08.2024    
-- -- Order Steps (0)  07.20.2024    
-- -- Order Tubs / Showers (0)  07.20.2024    
-- -- Framing II (8)  07.08.2024    
-- -- Framing III (8) *   07.08.2024    
-- -- Verify Window & Roof Structure (0)  07.20.2024    
-- -- Install Stairs (0)  07.20.2024    
-- -- Windows & Doors (0)  07.20.2024    
-- -- House Number and Status in Window (0)  08.14.2024    
-- -- Roofing (0)  08.03.2024    
-- -- Order Cabinets (0)  08.28.2024    
-- -- Order Appliances (0)  08.12.2024    
-- -- Deck (0)  09.25.2024    
-- -- Gutters (0)  09.28.2024    
-- -- Driveway (0)  10.19.2024    
-- -- Patio (0)  11.02.2024    
-- -- Privacy Divider / Fence (0)  11.09.2024    
-- -- Sod / Seed / Landscaping (0)  11.18.2024    
-- -- HVAC Rough In (4)  08.07.2024    
-- -- Inspection (Rough In HVAC) (1)  08.24.2024    
-- -- Rough In Microwave Vent (0)  08.03.2024    
-- -- Plumbing Rough In (4)  08.07.2024     In process 8/3
-- -- Inspection (Rough In Plumbing) (1)  08.24.2024    
-- -- Electric Rough In (4)  08.14.2024    
-- -- Inspection (Rough In Electric) (1)  08.24.2024    
-- -- Inspection (Deck Piers) (0)  11.05.2024    
-- -- Inspection (Framing) (1)  08.24.2024    
-- -- Exterior Vinyl (0) *   10.05.2024     In process 9/28
-- -- Exterior Stone (0)  10.19.2024    
-- -- Insulation (2)  08.28.2024    
-- -- Inspection (Insulation) (1)  08.24.2024    
-- -- Inspection (Electric Service) (0)  10.21.2024    
-- -- Set Electric Meter (0)  10.25.2024    
-- -- Inspection (Main Sewer Line) (0)  10.14.2024    
-- -- Inspection (Main Water Line) (0)  10.14.2024    
-- -- Order Interior Doors & Trim (0)  10.14.2024    
-- -- Drywall (Hang) (4) *   09.07.2024     In process 9/4
-- -- Deed Preparation (0)  11.05.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   09.21.2024     In process 9/11
-- -- Paint 1 (1)  09.21.2024    
-- -- Garage Door (0)  10.26.2024    
-- -- House Numbers (0)  11.18.2024    
-- -- Mailbox (0)  11.16.2024    
-- -- Cabinet Installation (2) *   09.21.2024     Delivered 9/19, Installed 9/20
-- -- Granite Installation (1) *   10.05.2024    
-- -- Interior Trim - Install (3)  10.26.2024     In process 10/23
-- -- Order Plumbing / Lighting Fixtures (0)  11.07.2024    
-- -- Interior Trim - Paint (1)  11.02.2024    
-- -- Luxury Vinyl Plank (3) *   11.06.2024    
-- -- Luxury Vinyl Tile (0)  11.09.2024    
-- -- Paint 2 (3)  11.16.2024    
-- -- Cover Floors (1)  11.09.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  11.07.2024    
-- -- Shoe Moulding (0)  11.09.2024    
-- -- Pay Water / Sewer Taps (0)  11.02.2024    
-- -- Set Water Meter (0)  11.18.2024    
-- -- Plumbing Trim Out (2)  11.20.2024    
-- -- Paint 3 (2) *   11.20.2024    
-- -- Carpet (2)  11.09.2024