Garage door needs window grill insert |
Davenport |
|
-- |
-- |
Broken corner of driveway |
Tom |
|
-- |
-- |
Paint garage |
|
|
-- |
-- |
Extra dishwasher in kitchen |
Goes in 64 |
|
-- |
-- |
Cover white pipe my front door |
By - sewer clean out, add cover |
|
|
|
Microwave vented to exterior
|
|
Wed |
Nov 27 |
Loan Approval (0) |
Kozhin Ahmad, Nexa (70% LTV) |
|
Wed |
Nov 27 |
Shelving, Door Knobs, Fire Extinguisher (0) |
Need shelving, door, knobs, and mirrors. In process 11/23 |
|
Wed |
Nov 27 |
Install Coded Lockbox (add extra keys) (0) |
|
|
Wed |
Nov 27 |
Electric Trim Out (3) |
|
|
Mon |
Dec 2 |
Ceiling Fans (0) |
|
|
Mon |
Dec 2 |
HVAC Trim Out (1) |
|
|
Tue |
Dec 3 |
Blower Door Test (1) |
|
|
Wed |
Dec 4 |
Install Appliances (0) * |
In process 11/20 |
|
Wed |
Dec 4 |
Appraiser Confirms Construction Completion (0) |
|
|
Wed |
Dec 4 |
Inspection (Final HVAC) (1) |
|
|
Thu |
Dec 5 |
Inspection (Final Plumbing) (1) |
|
|
Fri |
Dec 6 |
Inspection (Final Electric) (1) |
|
|
Mon |
Dec 9 |
Inspection (Final Building) (2) * |
Wed, Nov 27 |
|
Wed |
Dec 11 |
Pre Walk Through (0) |
|
|
Wed |
Dec 11 |
Stain Hardwood Stairs (1) |
|
|
Thu |
Dec 12 |
Cleaning (1) |
|
|
Fri |
Dec 13 |
Certificate of Occupancy (1) * |
|
|
Mon |
Dec 16 |
C.O. to Lender (0) |
|
|
Mon |
Dec 16 |
Schedule Closing (0) |
|
|
Mon |
Dec 16 |
Buyer Walk Through (1) |
|
|
Tue |
Dec 17 |
Payment for Upgrades (0) |
|
|
Tue |
Dec 17 |
Keys to Settlement Agent (0) |
|
|
Tue |
Dec 17 |
Review Settlement Statement (0) |
|
|
Tue |
Dec 17 |
Jerry Signs Closing Documents (0) |
|
|
Tue |
Dec 17 |
Request Trash Tote From POA Manager (0) |
|
|
Tue |
Dec 17 |
Closing (1) |
Brittany @ West View Title |
|
Wed |
Dec 18 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Deck patio doors need installed on all units |
|
|
-- |
-- |
Does anything need to be done with the block that is intruding into the bonus room? Insulation? |
|
|
-- |
-- |
Set of appliances in kitchen |
|
|
-- |
-- |
Just making sure these folks were charged for the quartz countertop |
|
|
-- |
-- |
Is the correct cabinet piece installed for where the dishwasher will go? |
|
|
-- |
-- |
Missing stairwell spindles |
George |
|
-- |
-- |
Set splash blocks in place |
|
|
-- |
-- |
Ratified Contract? (0) 05.21.2024 |
|
|
|
|
Microwave vented to exterior
|
|
-- |
-- |
$2500 Deposit Received (0) 05.31.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 05.21.2024 |
|
|
-- |
-- |
Association Packet Received (0) 05.23.2024 |
|
|
-- |
-- |
Selections Meeting (0) 06.25.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 06.28.2024 |
6/25: sent to Kozhin |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 07.02.2024 |
7/1: sent to Jerry for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0) 07.02.2024 |
|
|
-- |
-- |
Building Permit (30) 04.18.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 07.20.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 07.20.2024 |
|
|
-- |
-- |
Stake Out Home (1) 04.18.2024 |
|
|
-- |
-- |
Excavate (2) 04.18.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 04.18.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 04.18.2024 |
|
|
-- |
-- |
Pour Footers (1) 04.18.2024 |
|
|
-- |
-- |
Set Forms (2) 05.06.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 05.06.2024 |
|
|
-- |
-- |
Plumb Slab (2) 05.13.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 05.23.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 05.23.2024 |
|
|
-- |
-- |
Prepare Slab (1) 05.23.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 07.08.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 07.08.2024 |
|
|
-- |
-- |
Pour Slab (1) * 07.08.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 07.09.2024 |
Sent to WVT on July 2 |
|
-- |
-- |
Framing I (9) 07.08.2024 |
|
|
-- |
-- |
Order Steps (0) 07.20.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0) 07.20.2024 |
|
|
-- |
-- |
Framing II (8) 07.08.2024 |
|
|
-- |
-- |
Framing III (8) * 07.08.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 07.20.2024 |
|
|
-- |
-- |
Install Stairs (0) 07.20.2024 |
|
|
-- |
-- |
Windows & Doors (0) 07.20.2024 |
|
|
-- |
-- |
House Number and Status in Window (0) 08.14.2024 |
|
|
-- |
-- |
Roofing (0) 08.03.2024 |
|
|
-- |
-- |
Order Cabinets (0) 08.28.2024 |
|
|
-- |
-- |
Order Appliances (0) 08.12.2024 |
|
|
-- |
-- |
Deck (0) 09.25.2024 |
|
|
-- |
-- |
Gutters (0) 09.28.2024 |
|
|
-- |
-- |
Driveway (0) 10.19.2024 |
|
|
-- |
-- |
Patio (0) 11.02.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 11.09.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 11.18.2024 |
|
|
-- |
-- |
HVAC Rough In (4) 08.07.2024 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 08.24.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 08.03.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 08.07.2024 |
In process 8/3 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 08.24.2024 |
|
|
-- |
-- |
Electric Rough In (4) 08.14.2024 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 08.24.2024 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 11.05.2024 |
|
|
-- |
-- |
Inspection (Framing) (1) 08.24.2024 |
|
|
-- |
-- |
Exterior Vinyl (0) * 10.05.2024 |
In process 9/28 |
|
-- |
-- |
Exterior Stone (0) 10.19.2024 |
|
|
-- |
-- |
Insulation (2) 08.28.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1) 08.24.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 10.21.2024 |
|
|
-- |
-- |
Set Electric Meter (0) 10.25.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 10.14.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 10.14.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 10.14.2024 |
|
|
-- |
-- |
Drywall (Hang) (4) * 09.07.2024 |
In process 9/4 |
|
-- |
-- |
Deed Preparation (0) 11.05.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 09.21.2024 |
In process 9/11 |
|
-- |
-- |
Paint 1 (1) 09.21.2024 |
|
|
-- |
-- |
Garage Door (0) 10.26.2024 |
|
|
-- |
-- |
House Numbers (0) 11.18.2024 |
|
|
-- |
-- |
Mailbox (0) 11.16.2024 |
|
|
-- |
-- |
Cabinet Installation (2) * 09.21.2024 |
Delivered 9/19, Installed 9/20 |
|
-- |
-- |
Granite Installation (1) * 10.05.2024 |
|
|
-- |
-- |
Interior Trim - Install (3) 10.26.2024 |
In process 10/23 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 11.07.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 11.02.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 11.06.2024 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 11.09.2024 |
|
|
-- |
-- |
Paint 2 (3) 11.16.2024 |
|
|
-- |
-- |
Cover Floors (1) 11.09.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 11.07.2024 |
|
|
-- |
-- |
Shoe Moulding (0) 11.09.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 11.02.2024 |
|
|
-- |
-- |
Set Water Meter (0) 11.18.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2) 11.20.2024 |
|
|
-- |
-- |
Paint 3 (2) * 11.20.2024 |
|
|
-- |
-- |
Carpet (2) 11.09.2024 |
|
|