CONGERS-2 - 63  ::  1332 Appaloosa Court
[ BUILD: 20232085 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Wednesday (Apr 23)    show all photos
--   --   Driveway still needs finished Comer
--   --   Hardwood Trail
--   --   Hardwood treads are not installed at this unit
--   --   Set basement bathtub
--   --   Remove extra steps
--   --   Trey ceiling needs to be finished in the master bedroom
--   --   Garage window grill inserts Davenport
--   --   Missing hardware on drawers to the left and right of the sink Fred
--   --   Silver hinges on doors Some. Painters need to uncover tape first before Jill can fix
--   --   Replace window and bonus room Sash is on order
--   --   Raised dining room chandelier Electrician
--   --   Need a lot of lightbulbs
--   --   Powder bath fixture needed Electrician
--   --   Needs final paint some places Painter
--   --   One silver hinge on bonus room door Jill
--   --   Three silver hinges on bonus bathroom door Jill
--   --   Silver hinges on powder bath door Jill
--   --   Paint three still needs to be completed in a few spaces
--   --   CODED LOCKBOX 6363
--   --   Complete pouring curb so that driveway can be accessible add gravel to make driveway usable
--   --   Paint trim around front door Painter
--   --   Closet door knobs needed
--   --   Lots of extra plumbing fixtures in garage
--   --   Home Inspection - Friday 9AM Benjamin Meredith
--   --   Scratch on cabinet Jill
--   --   Weatherstripping needed on back patio door Jill
--   --   Put board into place on back patio Tom
--   --   This driveway is not flaky
--   --   Light above master shower is a little loose Electrician
--   --   Few touchups in stairways and powder bath needed Painter
--   --   Paint trim around back exterior doors Painter
--   --   Replace damaged weather stripping on rear lower level door Jill
--   --   Repair deck railing with loose post cap Premier
--   --   Bathroom outlet not working Electrician
--   --   Paint edges of interior doors Painter
--   --   Seal perimeter of lower level toilet that is shimmed Caulk, Painter - all toilets
--   --   Install screen doors Jill
--   --   Install screen doors
--   --   Install shower rod in master shower Jill. Shower rod is not in master bathroom.
--   --   LOTS of paint touch ups throughout home Painters
--   --   Clean all receptacle covers throughout home. The painters didn’t remove them, they just painted over the edges Painters
--   --   Back downspouts need extended Tom will handle this but not til the final grade is finished
--   --   1 sconce on the landing is loose and needs tightened up Electrician
--   --   Spot on the floor in the little bedroom to right needs removed Jill/kristin
--   --   2master bedroom windows need screens Jill
--   --   Clean the pvc board around the outside of the garage door Kristin
--   --   Raise the downspouts in front of unit (and rest of them on this row) Tom will handle this but not til the final grade is finished
--   --   2 holes under kitchen sink needs patched Jill
--   --   Remove the coffee maker from the garage?
-- -- Ratified Contract? (0)  08.19.2024    
-- -- $2500 Deposit Received (0)  08.22.2024    
-- -- Association Packet Requested (0)  08.19.2024    
-- -- Association Packet Received (0)  08.24.2024    
-- -- Selections Meeting (0)  08.27.2024    
-- -- Selections Sheet Signed (0)  09.05.2024     8/27: sent to Renee
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  09.07.2024     9/6: sent to Jerry
-- -- Deposit For Upgrades Received (0)  09.06.2024    
-- -- Building Permit (30)  04.18.2024    
-- -- Order Roof & Floor Trusses (1)  08.22.2024    
-- -- Order Windows & Doors (0)  09.25.2024    
-- -- Stake Out Home (1)  04.18.2024    
-- -- Excavate (2)  04.18.2024    
-- -- Inspection (Footers) (1)  05.13.2024    
-- -- Inspection (Concrete Wall) (1)  05.13.2024    
-- -- Pour Footers (1) *   04.25.2024    
-- -- Set Forms (2)  05.13.2024    
-- -- Pour Foundation Walls (1)  05.13.2024    
-- -- Plumb Slab (2)  05.13.2024    
-- -- Inspection (Plumbing Under Slab) (1)  07.08.2024    
-- -- Inspection (Conduit Under Slab) (1)  07.08.2024    
-- -- Prepare Slab (1)  07.08.2024    
-- -- Inspection (Slab) (1)  07.08.2024    
-- -- Inspection (Drain Tile) (0)  07.08.2024    
-- -- Pour Slab (1) *   07.08.2024    
-- -- Settlement Agent Confirmed (0)  08.22.2024    
-- -- Framing I (9)  08.23.2024    
-- -- Order Steps (0)  09.22.2024    
-- -- Order Tubs / Showers (0)  09.15.2024    
-- -- Framing II (8)  09.12.2024    
-- -- Framing III (8) *   09.19.2024    
-- -- Verify Window & Roof Structure (0)  09.15.2024    
-- -- Install Stairs (0)  09.25.2024    
-- -- Windows & Doors (0) *   09.25.2024    
-- -- House Number and Status in Window (0)  10.03.2024    
-- -- Roofing (0) *   10.09.2024    
-- -- Order Cabinets (0)  09.27.2024    
-- -- Order Appliances (0)  08.12.2024    
-- -- Deck (0)  11.09.2024    
-- -- Gutters (0)  11.30.2024    
-- -- Driveway (0) *   12.21.2024    
-- -- Patio (0)  12.21.2024    
-- -- Privacy Divider / Fence (0)  12.18.2024    
-- -- Sod / Seed / Landscaping (0)  03.15.2025    
-- -- HVAC Rough In (4)  10.02.2024    
-- -- Inspection (Rough In HVAC) (1)  10.26.2024    
-- -- Rough In Microwave Vent (0)  10.02.2024    
-- -- Plumbing Rough In (4)  10.19.2024     In process 10/16
-- -- Inspection (Rough In Plumbing) (1)  10.26.2024    
-- -- Electric Rough In (4)  10.19.2024    
-- -- Inspection (Rough In Electric) (1)  10.26.2024    
-- -- Inspection (Deck Piers) (0)  11.25.2024    
-- -- Inspection (Framing) (1) *   10.26.2024    
-- -- Exterior Vinyl (0) *   11.23.2024     in process 11/16
-- -- Exterior Stone (0)  12.18.2024    
-- -- Insulation (2) *   10.26.2024    
-- -- Inspection (Insulation) (1)  10.30.2024    
-- -- Inspection (Electric Service) (0)  11.25.2024    
-- -- Set Electric Meter (0) *   12.12.2024    
-- -- Inspection (Main Sewer Line) (0)  10.14.2024    
-- -- Inspection (Main Water Line) (0)  10.14.2024    
-- -- Order Interior Doors & Trim (0)  10.14.2024    
-- -- Drywall (Hang) (4) *   11.02.2024     In process 10/30
-- -- Loan Approval (0)  11.05.2024     Cash
-- -- Deed Preparation (0)  11.05.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   11.23.2024     In process 11/16
-- -- Paint 1 (1)  11.23.2024    
-- -- Garage Door (0) *   11.25.2024    
-- -- House Numbers (0)  01.11.2025    
-- -- Mailbox (0)  12.19.2024    
-- -- Cabinet Installation (2) *   11.23.2024     11/22
-- -- Granite Installation (1) *   12.04.2024     Wed, Dec 4
-- -- Interior Trim - Install (3) *   12.14.2024     In process 12/4
-- -- Order Plumbing / Lighting Fixtures (0)  12.02.2024    
-- -- Interior Trim - Paint (1)  12.18.2024    
-- -- Luxury Vinyl Plank (3) *   01.05.2025    
-- -- Luxury Vinyl Tile (0)  01.05.2025    
-- -- Paint 2 (3)  01.05.2025    
-- -- Cover Floors (1)  01.05.2025    
-- -- Deliver Plumbing / Lighting Fixtures (0)  11.25.2024    
-- -- Shoe Moulding (0)  01.05.2025    
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *   01.22.2025     In process 1/18
-- -- Install Coded Lockbox (add extra keys) (0)  01.16.2025    
-- -- Pay Water / Sewer Taps (0)  12.30.2024    
-- -- Set Water Meter (0) *   12.30.2024    
-- -- Electric Trim Out (3)  01.11.2025     In process 1/8
-- -- Ceiling Fans (0)  01.08.2025    
-- -- HVAC Trim Out (1)  01.05.2025    
-- -- Blower Door Test (1)  01.20.2025    
-- -- Plumbing Trim Out (2)  01.15.2025     In process 1/11
-- -- Install Appliances (0) *   01.22.2025     fridge, micro, range needed 1/15
-- -- Paint 3 (2) *   01.22.2025     In process 1/18
-- -- Carpet (2)  01.11.2025    
-- -- Appraiser Confirms Construction Completion (0)  01.20.2025    
-- -- Inspection (Final HVAC) (1)  01.22.2025    
-- -- Inspection (Final Plumbing) (1)  01.22.2025    
-- -- Inspection (Final Electric) (1)  01.22.2025    
-- -- Inspection (Final Building) (2) *   01.22.2025     Wed, Jan 22 or Thu, Jan 23
-- -- Pre Walk Through (0)  01.30.2025    
-- -- Stain Hardwood Stairs (1)  01.25.2025     In process 1/22
-- -- Cleaning (1)  01.30.2025    
-- -- Certificate of Occupancy (1) *   01.25.2025    
-- -- C.O. to Lender (0)  01.25.2025    
-- -- Schedule Closing (0)  01.29.2025    
-- -- Buyer Walk Through (1)  02.01.2025     Fri, Jan 31 at 1PM
-- -- Payment for Upgrades (0)  01.27.2025    
-- -- Keys to Settlement Agent (0)  01.27.2025    
-- -- Review Settlement Statement (0)  01.29.2025    
-- -- Jerry Signs Closing Documents (0)  01.29.2025    
-- -- Request Trash Tote From POA Manager (0)  01.13.2025    
-- -- Closing (1)  03.03.2025     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  03.15.2025