-- |
-- |
Driveway still needs finished |
Comer |
|
|
-- |
-- |
Hardwood Trail |
|
|
-- |
-- |
Hardwood treads are not installed at this unit |
|
|
-- |
-- |
Set basement bathtub |
|
|
-- |
-- |
Remove extra steps |
|
|
-- |
-- |
Trey ceiling needs to be finished in the master bedroom |
|
|
-- |
-- |
Garage window grill inserts |
Davenport |
|
-- |
-- |
Missing hardware on drawers to the left and right of the sink |
Fred |
|
-- |
-- |
Silver hinges on doors |
Some. Painters need to uncover tape first before Jill can fix |
|
-- |
-- |
Replace window and bonus room |
Sash is on order |
|
-- |
-- |
Raised dining room chandelier |
Electrician |
|
-- |
-- |
Need a lot of lightbulbs |
|
|
-- |
-- |
Powder bath fixture needed |
Electrician |
|
-- |
-- |
Needs final paint some places |
Painter |
|
-- |
-- |
One silver hinge on bonus room door |
Jill |
|
-- |
-- |
Three silver hinges on bonus bathroom door |
Jill |
|
-- |
-- |
Silver hinges on powder bath door |
Jill |
|
-- |
-- |
Paint three still needs to be completed in a few spaces |
|
|
-- |
-- |
CODED LOCKBOX 6363 |
|
|
-- |
-- |
Complete pouring curb so that driveway can be accessible |
add gravel to make driveway usable |
|
-- |
-- |
Paint trim around front door |
Painter |
|
-- |
-- |
Closet door knobs needed |
|
|
-- |
-- |
Lots of extra plumbing fixtures in garage |
|
|
-- |
-- |
Home Inspection - Friday 9AM |
Benjamin Meredith |
|
-- |
-- |
Scratch on cabinet |
Jill |
|
-- |
-- |
Weatherstripping needed on back patio door |
Jill |
|
-- |
-- |
Put board into place on back patio |
Tom |
|
-- |
-- |
This driveway is not flaky |
|
|
-- |
-- |
Light above master shower is a little loose |
Electrician |
|
-- |
-- |
Few touchups in stairways and powder bath needed |
Painter |
|
-- |
-- |
Paint trim around back exterior doors |
Painter |
|
-- |
-- |
Replace damaged weather stripping on rear lower level door |
Jill |
|
-- |
-- |
Repair deck railing with loose post cap |
Premier |
|
-- |
-- |
Bathroom outlet not working |
Electrician |
|
-- |
-- |
Paint edges of interior doors |
Painter |
|
-- |
-- |
Seal perimeter of lower level toilet that is shimmed |
Caulk, Painter - all toilets |
|
-- |
-- |
Install screen doors |
Jill |
|
-- |
-- |
Install screen doors |
|
|
-- |
-- |
Install shower rod in master shower |
Jill. Shower rod is not in master bathroom. |
|
-- |
-- |
LOTS of paint touch ups throughout home |
Painters |
|
-- |
-- |
Clean all receptacle covers throughout home. The painters didn’t remove them, they just painted over the edges |
Painters |
|
-- |
-- |
Back downspouts need extended |
Tom will handle this but not til the final grade is finished |
|
-- |
-- |
1 sconce on the landing is loose and needs tightened up |
Electrician |
|
-- |
-- |
Spot on the floor in the little bedroom to right needs removed |
Jill/kristin |
|
-- |
-- |
2master bedroom windows need screens |
Jill |
|
-- |
-- |
Clean the pvc board around the outside of the garage door |
Kristin |
|
-- |
-- |
Raise the downspouts in front of unit (and rest of them on this row) |
Tom will handle this but not til the final grade is finished |
|
-- |
-- |
2 holes under kitchen sink needs patched |
Jill |
|
-- |
-- |
Remove the coffee maker from the garage? |
|
|
-- |
-- |
Ratified Contract? (0) 08.19.2024 |
|
|
-- |
-- |
$2500 Deposit Received (0) 08.22.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 08.19.2024 |
|
|
-- |
-- |
Association Packet Received (0) 08.24.2024 |
|
|
-- |
-- |
Selections Meeting (0) 08.27.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 09.05.2024 |
8/27: sent to Renee |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 09.07.2024 |
9/6: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 09.06.2024 |
|
|
-- |
-- |
Building Permit (30) 04.18.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 08.22.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 09.25.2024 |
|
|
-- |
-- |
Stake Out Home (1) 04.18.2024 |
|
|
-- |
-- |
Excavate (2) 04.18.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 05.13.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 05.13.2024 |
|
|
-- |
-- |
Pour Footers (1) * 04.25.2024 |
|
|
-- |
-- |
Set Forms (2) 05.13.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 05.13.2024 |
|
|
-- |
-- |
Plumb Slab (2) 05.13.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 07.08.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 07.08.2024 |
|
|
-- |
-- |
Prepare Slab (1) 07.08.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 07.08.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 07.08.2024 |
|
|
-- |
-- |
Pour Slab (1) * 07.08.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 08.22.2024 |
|
|
-- |
-- |
Framing I (9) 08.23.2024 |
|
|
-- |
-- |
Order Steps (0) 09.22.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0) 09.15.2024 |
|
|
-- |
-- |
Framing II (8) 09.12.2024 |
|
|
-- |
-- |
Framing III (8) * 09.19.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 09.15.2024 |
|
|
-- |
-- |
Install Stairs (0) 09.25.2024 |
|
|
-- |
-- |
Windows & Doors (0) * 09.25.2024 |
|
|
-- |
-- |
House Number and Status in Window (0) 10.03.2024 |
|
|
-- |
-- |
Roofing (0) * 10.09.2024 |
|
|
-- |
-- |
Order Cabinets (0) 09.27.2024 |
|
|
-- |
-- |
Order Appliances (0) 08.12.2024 |
|
|
-- |
-- |
Deck (0) 11.09.2024 |
|
|
-- |
-- |
Gutters (0) 11.30.2024 |
|
|
-- |
-- |
Driveway (0) * 12.21.2024 |
|
|
-- |
-- |
Patio (0) 12.21.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 12.18.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 03.15.2025 |
|
|
-- |
-- |
HVAC Rough In (4) 10.02.2024 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 10.26.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 10.02.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 10.19.2024 |
In process 10/16 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 10.26.2024 |
|
|
-- |
-- |
Electric Rough In (4) 10.19.2024 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 10.26.2024 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 11.25.2024 |
|
|
-- |
-- |
Inspection (Framing) (1) * 10.26.2024 |
|
|
-- |
-- |
Exterior Vinyl (0) * 11.23.2024 |
in process 11/16 |
|
-- |
-- |
Exterior Stone (0) 12.18.2024 |
|
|
-- |
-- |
Insulation (2) * 10.26.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1) 10.30.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 11.25.2024 |
|
|
-- |
-- |
Set Electric Meter (0) * 12.12.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 10.14.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 10.14.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 10.14.2024 |
|
|
-- |
-- |
Drywall (Hang) (4) * 11.02.2024 |
In process 10/30 |
|
-- |
-- |
Loan Approval (0) 11.05.2024 |
Cash |
|
-- |
-- |
Deed Preparation (0) 11.05.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 11.23.2024 |
In process 11/16 |
|
-- |
-- |
Paint 1 (1) 11.23.2024 |
|
|
-- |
-- |
Garage Door (0) * 11.25.2024 |
|
|
-- |
-- |
House Numbers (0) 01.11.2025 |
|
|
-- |
-- |
Mailbox (0) 12.19.2024 |
|
|
-- |
-- |
Cabinet Installation (2) * 11.23.2024 |
11/22 |
|
-- |
-- |
Granite Installation (1) * 12.04.2024 |
Wed, Dec 4 |
|
-- |
-- |
Interior Trim - Install (3) * 12.14.2024 |
In process 12/4 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 12.02.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 12.18.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 01.05.2025 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 01.05.2025 |
|
|
-- |
-- |
Paint 2 (3) 01.05.2025 |
|
|
-- |
-- |
Cover Floors (1) 01.05.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 11.25.2024 |
|
|
-- |
-- |
Shoe Moulding (0) 01.05.2025 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 01.22.2025 |
In process 1/18 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 01.16.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 12.30.2024 |
|
|
-- |
-- |
Set Water Meter (0) * 12.30.2024 |
|
|
-- |
-- |
Electric Trim Out (3) 01.11.2025 |
In process 1/8 |
|
-- |
-- |
Ceiling Fans (0) 01.08.2025 |
|
|
-- |
-- |
HVAC Trim Out (1) 01.05.2025 |
|
|
-- |
-- |
Blower Door Test (1) 01.20.2025 |
|
|
-- |
-- |
Plumbing Trim Out (2) 01.15.2025 |
In process 1/11 |
|
-- |
-- |
Install Appliances (0) * 01.22.2025 |
fridge, micro, range needed 1/15 |
|
-- |
-- |
Paint 3 (2) * 01.22.2025 |
In process 1/18 |
|
-- |
-- |
Carpet (2) 01.11.2025 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 01.20.2025 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 01.22.2025 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 01.22.2025 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 01.22.2025 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 01.22.2025 |
Wed, Jan 22 or Thu, Jan 23 |
|
-- |
-- |
Pre Walk Through (0) 01.30.2025 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 01.25.2025 |
In process 1/22 |
|
-- |
-- |
Cleaning (1) 01.30.2025 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 01.25.2025 |
|
|
-- |
-- |
C.O. to Lender (0) 01.25.2025 |
|
|
-- |
-- |
Schedule Closing (0) 01.29.2025 |
|
|
-- |
-- |
Buyer Walk Through (1) 02.01.2025 |
Fri, Jan 31 at 1PM |
|
-- |
-- |
Payment for Upgrades (0) 01.27.2025 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 01.27.2025 |
|
|
-- |
-- |
Review Settlement Statement (0) 01.29.2025 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 01.29.2025 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 01.13.2025 |
|
|
-- |
-- |
Closing (1) 03.03.2025 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 03.15.2025 |
|
|