| Mon | Dec 15 | Inspection (Concrete Wall) (1) | ||
| Tue | Dec 16 | Inspection (Conduit Under Slab) (1) | ||
| Wed | Dec 17 | Inspection (Drain Tile) (0) | ||
| Wed | Dec 17 | Inspection (Rough In Plumbing) (1) | ||
| Thu | Dec 18 | Inspection (Rough In Electric) (1) | ||
| Fri | Dec 19 | Inspection (Framing) (1) * | ||
| Mon | Dec 22 | Inspection (Deck Piers) (0) | ||
| Mon | Dec 22 | Inspection (Main Water Line) (0) | ||
| Mon | Dec 22 | Inspection (Final HVAC) (1) | ||
| Tue | Dec 23 | Inspection (Final Plumbing) (1) | ||
| Wed | Dec 24 | Inspection (Final Electric) (1) | ||
| -- | -- | Inspection (Footers) (1) | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) | ||
| -- | -- | Inspection (Slab) (1) | ||
| -- | -- | Inspection (Rough In HVAC) (1) | ||
| -- | -- | Inspection (Insulation) (1) | ||
| -- | -- | Inspection (Electric Service) (0) | ||
| -- | -- | Inspection (Main Sewer Line) (0) | Buried, need to be covered | |
| -- | -- | Inspection (Final Building) (2) * | Re-inspect | |