37
•
ADDR
CONGERS-2 - 27 :: 1714 Sherry Lane
CRITICAL PATH
|
INSPECTIONS
|
FLOOR PLANS
|
SELECTIONS
|
SPECS
|
CHANGES
|
NHS
view photo archive
--
--
Leaking basement when it rains
At water line entry
--
--
Gordon 518-369-2440
Mon
Dec 15
Ratified Contract?
(0)
Mon
Dec 15
$2500 Deposit Received
(0)
Mon
Dec 15
Association Packet Requested
(0)
Mon
Dec 15
Association Packet Received
(0)
Mon
Dec 15
Selections Meeting
(0)
Mon
Dec 15
Selections Sheet Signed
(0)
Mon
Dec 15
Amendment for Upgrades (B,S,L,T,BCP)
(0)
Mon
Dec 15
Deposit For Upgrades Received
(0)
Mon
Dec 15
Inspection (Concrete Wall)
(1)
Tue
Dec 16
Inspection (Conduit Under Slab)
(1)
Wed
Dec 17
Inspection (Drain Tile)
(0)
Wed
Dec 17
Settlement Agent Confirmed
(0)
Wed
Dec 17
Verify Window & Roof Structure
(0)
Wed
Dec 17
Order Appliances
(0)
Wed
Dec 17
Patio
(0)
Wed
Dec 17
Rough In Microwave Vent
(0)
Wed
Dec 17
Inspection (Rough In Plumbing)
(1)
Thu
Dec 18
Inspection (Rough In Electric)
(1)
Fri
Dec 19
Inspection (Framing)
(1)
*
Mon
Dec 22
Inspection (Deck Piers)
(0)
Mon
Dec 22
Exterior Stone
(0)
Mon
Dec 22
Set Electric Meter
(0)
*
Mon
Dec 22
Inspection (Main Water Line)
(0)
Mon
Dec 22
Loan Approval
(0)
Mon
Dec 22
Deed Preparation
(0)
Mon
Dec 22
Mailbox
(0)
Mon
Dec 22
Order Plumbing / Lighting Fixtures
(0)
Mon
Dec 22
Interior Trim - Paint
(1)
Tue
Dec 23
Ceiling Fans
(0)
Tue
Dec 23
Blower Door Test
(1)
Wed
Dec 24
Inspection (Final HVAC)
(1)
Thu
Dec 25
Inspection (Final Plumbing)
(1)
Fri
Dec 26
Inspection (Final Electric)
(1)
Mon
Dec 29
Stain Hardwood Stairs
(1)
*
Tue
Dec 30
Schedule Closing
(0)
Tue
Dec 30
Keys to Settlement Agent
(0)
Tue
Dec 30
Review Settlement Statement
(0)
Tue
Dec 30
Jerry Signs Closing Documents
(0)
Tue
Dec 30
Request Trash Tote From POA Manager
(0)
Tue
Dec 30
Remove Coded Lockbox
(0)
--
--
Building Permit
(30)
*
--
--
Order Roof & Floor Trusses
(1)
--
--
Order Windows & Doors
(0)
--
--
Stake Out Home
(1)
--
--
Excavate
(2)
--
--
Inspection (Footers)
(1)
--
--
Pour Footers
(1)
*
--
--
Set Forms
(2)
--
--
Pour Foundation Walls
(1)
--
--
Plumb Slab
(2)
--
--
Inspection (Plumbing Under Slab)
(1)
--
--
Prepare Slab
(1)
--
--
Inspection (Slab)
(1)
--
--
Pour Slab
(1)
*
--
--
Framing I
(9)
--
--
Order Steps
(0)
--
--
Order Tubs / Showers
(0)
--
--
Framing II
(8)
--
--
Framing III
(8)
*
--
--
Install Stairs
(0)
*
--
--
Windows & Doors
(0)
*
--
--
House Number and Status in Window
(0)
--
--
Roofing
(0)
*
--
--
Order Cabinets
(0)
--
--
Deck
(0)
--
--
Gutters
(0)
--
--
Driveway
(0)
*
--
--
Privacy Divider / Fence
(0)
*
--
--
Sod / Seed / Landscaping
(0)
--
--
HVAC Rough In
(4)
--
--
Plumbing Rough In
(4)
--
--
Electric Rough In
(4)
--
--
Inspection (Rough In HVAC)
(1)
--
--
Exterior Vinyl
(0)
*
--
--
Insulation
(2)
*
--
--
Inspection (Insulation)
(1)
--
--
Inspection (Electric Service)
(0)
--
--
Inspection (Main Sewer Line)
(0)
--
--
Order Interior Doors & Trim
(0)
--
--
Drywall (Hang)
(4)
*
--
--
Drywall (Tape, Block, Skim, Sand)
(6)
*
--
--
Paint 1
(1)
--
--
Garage Door
(0)
--
--
House Numbers
(0)
--
--
Cabinet Installation
(2)
*
--
--
Granite Installation
(1)
*
--
--
Interior Trim - Install
(3)
*
--
--
Luxury Vinyl Plank
(3)
*
--
--
Luxury Vinyl Tile
(0)
--
--
Paint 2
(3)
--
--
Cover Floors
(1)
--
--
Deliver Plumbing / Lighting Fixtures
(0)
--
--
Shoe Moulding
(0)
--
--
Shelving, Door Knobs, Fire Extinguisher
(0)
*
--
--
Install Coded Lockbox (add extra keys)
(0)
--
--
Pay Water / Sewer Taps
(0)
--
--
Set Water Meter
(0)
*
--
--
Electric Trim Out
(3)
*
--
--
HVAC Trim Out
(1)
*
--
--
Plumbing Trim Out
(2)
*
--
--
Install Appliances
(0)
*
--
--
Paint 3
(2)
*
--
--
Carpet
(2)
--
--
Appraiser Confirms Construction Completion
(0)
--
--
Inspection (Final Building)
(2)
*
--
--
Pre Walk Through
(0)
--
--
Cleaning
(1)
--
--
Certificate of Occupancy
(1)
*
--
--
C.O. to Lender
(0)
--
--
Buyer Walk Through
(1)
*
--
--
Payment for Upgrades
(0)
--
--
Closing
(1)